Building Code Occupancy Classification

The category assigned to a building or part of it based on how it is used, such as residential, office, retail or storage. The classification sets the fire, egress and construction requirements that apply.

Related: Means of Escape, Fire Resistance Level, Building Permit
Means of Escape

The continuous protected route from any point in a building to a public road or open space, including doorways, corridors, stairs and exits. It must remain clear, adequately wide and protected from fire and smoke.

Related: Building Code Occupancy Classification, Fire Resistance Level, Travel Distance
Fire Resistance Level

A rating expressing how long a building element resists structural failure, fire penetration and heat transmission under standard fire test conditions, usually stated in minutes for three criteria.

Related: Means of Escape, Fire Compartmentation, Building Code Occupancy Classification
Fire Compartmentation

The division of a building into fire-separated zones by fire-rated walls, floors and doors, intended to limit fire and smoke spread and to give occupants time to escape safely.

Related: Fire Resistance Level, Means of Escape
Travel Distance

The measured length of the escape route from the most remote point on a floor to the nearest exit or safe place. Codes cap this distance according to occupancy and fire protection provided.

Related: Means of Escape, Fire Compartmentation
Building Permit

The formal statutory approval allowing construction or alteration work to proceed. Drawings and documentation submitted for the permit must demonstrate compliance with applicable codes and planning controls.

Related: Building Code Occupancy Classification, Development Approval, As-Built Drawing
Development Approval

The planning consent granted by a local authority for the use or development of land. It typically precedes or accompanies building approval and may impose conditions that shape the design.

Related: Building Permit, Setback, Floor Area Ratio
Setback

The minimum distance required between a building and a property boundary, road or other feature. Setbacks control light, privacy, landscaping and streetscape and are specified in planning instruments.

Related: Development Approval, Floor Area Ratio, Site Plan
Floor Area Ratio

The ratio of total building floor area to the area of the site. Planners use it to control development density and building bulk, often alongside height and setback limits.

Related: Setback, Development Approval
Site Plan

A scaled drawing showing the site boundaries, building footprint, levels, access, parking, services and surrounding context. It locates the proposed work relative to boundaries and existing features.

Related: Setback, Contour Line, Drawing Scale
Contour Line

A line on a drawing joining points of equal ground level. Contours reveal slope and drainage direction and inform cut and fill, retaining wall and building platform decisions.

Related: Site Plan, Spot Level, Cut and Fill
Spot Level

A surveyed ground or floor elevation marked at a specific point on a drawing. Spot levels supplement contours and are used to set finished floor levels and verify drainage falls.

Related: Contour Line, Cut and Fill
Cut and Fill

The earthworks of removing soil (cut) and placing it elsewhere (fill) to create a level building platform or road. Balanced cut and fill reduces cartage costs and site disturbance.

Related: Contour Line, Spot Level
Drawing Scale

The fixed ratio between a dimension on a drawing and the real dimension it represents, such as 1:100. Correct scale selection balances the detail shown against the sheet size available.

Related: Site Plan, Detail Drawing, Title Block
Title Block

The bordered panel on a drawing sheet recording project name, drawing number, revision, scale, date, author and approval status. It controls document identification and traceability.

Related: Drawing Register, Revision Cloud, Drawing Scale
Revision Cloud

A scalloped outline drawn around changed portions of a drawing so reviewers can quickly locate amendments. Each cloud is cross-referenced to a revision note or number.

Related: Title Block, Drawing Register
Drawing Register

A controlled list of all drawings issued on a project, showing numbers, titles, revisions, dates and recipients. It tracks the current status of every document and prevents outdated drawings being used.

Related: Title Block, Revision Cloud, Transmittal
Transmittal

A formal record accompanying documents sent to another party, listing what was issued, its revision and the purpose. It provides evidence of delivery and forms part of the project record.

Related: Drawing Register, Request for Information
Request for Information

A written query issued to the designer or consultant seeking clarification of drawings, specifications or instructions. Responses are logged and may trigger a formal design change.

Related: Transmittal, Variation, Shop Drawing
Variation

A formal change to the scope, design or contract documents after the contract is executed. Variations are documented, priced and approved before the affected work proceeds.

Related: Request for Information, As-Built Drawing
As-Built Drawing

A drawing revised to record the constructed condition, including deviations from the original design. It supports future maintenance, alterations and statutory records.

Related: Shop Drawing, Variation, Building Permit
Shop Drawing

A detail drawing prepared by a fabricator or contractor showing how a component will actually be made and installed. It is checked against the design intent before fabrication begins.

Related: Request for Information, As-Built Drawing, Detail Drawing
Detail Drawing

A large-scale drawing showing the construction of a specific junction or component, with materials, dimensions, fixings and tolerances. It resolves how assemblies come together on site.

Related: Shop Drawing, Drawing Scale, Thermal Bridging
General Arrangement Drawing

A drawing presenting the overall layout of a building or system, showing the position of major elements without construction-level detail. It orients readers before they consult detail drawings.

Related: Detail Drawing, Section Drawing
Section Drawing

A view produced by cutting through a building and looking in one direction, revealing internal heights, floor-to-floor dimensions and construction layers. Sections are essential for coordinating structure and services.

Related: General Arrangement Drawing, Detail Drawing
Thermal Bridging

A path of high heat conductance through the building envelope, such as a slab edge or steel lintel, that bypasses insulation. It lowers thermal performance and can cause condensation.

Related: Thermal Insulation, Condensation, Detail Drawing
Thermal Insulation

Material with low heat conductivity installed in roofs, walls and floors to resist heat flow. Correct thickness, continuity and installation determine the achieved energy performance of the envelope.

Related: Thermal Bridging, Condensation, Vapour Barrier
Vapour Barrier

A low-permeability membrane placed on the warm side of insulation to restrict moisture-laden air from reaching cold surfaces. Correct placement and sealing reduce interstitial condensation risk.

Related: Condensation, Thermal Insulation
Condensation

The formation of water when moist air meets a surface below its dew point. In buildings it can occur on visible surfaces or hidden within construction, causing mould and material damage.

Related: Vapour Barrier, Thermal Bridging, Weatherproofing
Weatherproofing

The detailing of joints, flashings, seals and membranes that keeps rain, wind and moisture out of the building envelope. Poor weatherproofing is a common source of building defects.

Related: Flashing, Condensation
Flashing

A thin impervious material formed and fixed to shed water at junctions such as roof-to-wall, parapets and openings. Correct laps and upstands prevent water tracking into the construction.

Related: Weatherproofing, Damp-Proof Course
Damp-Proof Course

A continuous moisture-resistant layer built into a wall near ground level to stop rising damp reaching internal finishes. It must be lapped with the damp-proof membrane under the floor.

Related: Flashing, Weatherproofing
Load-Bearing Wall

A wall that carries and transfers loads from floors and roofs down to the foundations. Altering or removing one requires structural design because the load path must be maintained.

Related: Lintel, Structural Grid
Lintel

A horizontal structural member spanning an opening in a wall to carry the load above it. Its size and bearing length depend on span and the load imposed.

Related: Load-Bearing Wall, Structural Grid
Structural Grid

A system of reference lines, usually numbered and lettered, used to locate columns, walls and major elements consistently across drawings. It allows precise coordination between disciplines.

Related: Load-Bearing Wall, Clash Detection, General Arrangement Drawing
Clash Detection

The process of checking combined models or overlays of different disciplines to find physical conflicts, such as a duct intersecting a beam. Early detection avoids costly site rework.

Related: Structural Grid, Services Coordination, Section Drawing
Services Coordination

The arrangement of structural, mechanical, electrical and hydraulic elements so they fit within available zones without conflict. It considers falls, clearances, access for maintenance and penetration locations.

Related: Clash Detection, Section Drawing
Universal Design

Designing buildings and spaces so they can be used by people of all ages and abilities without adaptation. It addresses access, circulation, reach ranges, contrasts and sanitary facilities.

Related: Means of Escape, Accessible Route
Accessible Route

A continuous path that meets minimum width, gradient, surface and clearance requirements so people using wheelchairs or with limited mobility can travel independently. It links entries, amenities and exits.

Related: Universal Design, Means of Escape
Professional Duty of Care

The obligation of a draftsperson to exercise the skill and judgement reasonably expected of a competent practitioner, avoiding foreseeable harm to clients and the public. Breach can give rise to negligence claims.

Related: Conflict of Interest, Confidentiality
Conflict of Interest

A situation where a personal, financial or other interest could improperly influence professional judgement. It must be disclosed promptly and managed openly, often by withdrawal from the affected decision.

Related: Professional Duty of Care, Confidentiality
Confidentiality

The professional obligation not to disclose client information or project data without authority. It protects commercial and personal information and continues after a project engagement ends.

Related: Professional Duty of Care, Conflict of Interest