AZ Asbestos Abatement · Get comfortable with the vocabulary.

Asbestos-Containing Material (ACM)

Any material or product that contains more than one percent asbestos by weight, as determined by an accredited inspector's sampling and laboratory analysis under the applicable federal rule.

Related: Category I Nonfriable ACM, Friable Asbestos Material
NESHAP

The National Emission Standards for Hazardous Air Pollutants, the federal regulations under the Clean Air Act that set work practice standards for asbestos handling, including demolition and renovation of regulated facilities.

Related: Regulated Facility, RACM
Regulated Facility

Any institutional, commercial, public, industrial, or residential building or structure, excluding certain residential buildings with four or fewer dwelling units, that is subject to NESHAP asbestos requirements during demolition or renovation.

Related: NESHAP, Renovation
RACM

Regulated Asbestos-Containing Material: friable ACM, and certain nonfriable ACM that will be or has been crumbled, pulverized, or reduced to powder during handling, demolition, or renovation, triggering specific handling and emission controls.

Related: Friable Asbestos Material, Category I Nonfriable ACM
Friable Asbestos Material

Any material containing more than one percent asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, making it likely to release fibers into the air.

Related: RACM, Nonfriable Asbestos Material
Nonfriable Asbestos Material

Material containing more than one percent asbestos that cannot be crumbled, pulverized, or reduced to powder by hand pressure when dry, and which may still become regulated if broken or damaged during work.

Related: Friable Asbestos Material, Category II Nonfriable ACM
Category I Nonfriable ACM

A class of nonfriable asbestos material including packings, gaskets, resilient floor coverings, and asphalt roofing products that generally remain nonfriable unless sanded, ground, abraded, or similarly damaged.

Related: Category II Nonfriable ACM, Regulated Facility
Category II Nonfriable ACM

Nonfriable asbestos material other than Category I, such as cementitious siding and certain transite products, which becomes regulated when it is or may be crumbled, pulverized, or reduced to powder.

Related: Category I Nonfriable ACM, Nonfriable Asbestos Material
Demolition

The wrecking or removal of any load-supporting structural member of a facility, or the intentional burning of a facility, activities that trigger NESHAP notice and abatement obligations for asbestos present.

Related: Renovation, Regulated Facility
Renovation

Altering a facility or its component parts, including stripping or removing asbestos-containing materials, that may disturb ACM and therefore falls under NESHAP work practice and notification requirements.

Related: Demolition, Regulated Facility
Threshold Amount

The quantity of RACM that triggers NESHAP notification and work practice obligations, commonly expressed as linear feet of pipe, square feet of surface area, or cubic feet of volume disturbed.

Related: Notification of Demolition and Renovation, RACM
Small-Scale, Short-Term Project

An asbestos renovation or removal operation that is small in scope and short in duration, which may qualify for reduced notification timing or streamlined requirements under the applicable rule.

Related: Notification of Demolition and Renovation, Threshold Amount
AHERA

The Asbestos Hazard Emergency Response Act, a federal law requiring inspections, management plans, and response actions for asbestos in schools, and establishing the accreditation framework for inspectors and abatement workers.

Related: Accredited Inspector, Management Plan
Accredited Inspector

A person who has completed an approved training course and passed an examination, qualifying them to identify and assess asbestos-containing materials and collect bulk samples for laboratory analysis.

Related: Bulk Sample, AHERA
Bulk Sample

A physical portion of material collected in the field and submitted to an accredited laboratory to determine whether the material contains asbestos and, if so, in what percentage.

Related: Accredited Inspector, PLM
PLM

Polarized Light Microscopy: the standard laboratory analytical method used to identify asbestos fibers in bulk samples and estimate their percentage by visual area estimation.

Related: Bulk Sample, Point Counting
Point Counting

A more precise microscopic technique used to quantify low levels of asbestos in bulk samples, often applied when PLM results are near a regulatory threshold or when greater accuracy is needed.

Related: PLM, Bulk Sample
Management Plan

A document prepared for a school under AHERA describing the location, condition, and response actions for asbestos-containing materials, and outlining ongoing operations and maintenance procedures.

Related: AHERA, OM Plan
OM Plan

Operations and Maintenance Plan: written procedures describing how building staff will manage in-place asbestos to prevent disturbance, including work practices, training, and periodic surveillance requirements.

Related: Management Plan, Periodic Surveillance
Periodic Surveillance

A recurring visual check, typically every six months, of known or assumed asbestos-containing building materials to confirm their condition has not deteriorated since the last inspection.

Related: OM Plan, Management Plan
Reinspection

A comprehensive re-evaluation of asbestos-containing building materials, generally conducted every three years under AHERA, to update the management plan and confirm material condition.

Related: Periodic Surveillance, Management Plan
Presumed ACM

Material that has not been sampled but is treated as asbestos-containing because of its type, age, or appearance, requiring handling as ACM until sampling proves otherwise.

Related: Bulk Sample, Accredited Inspector
Homogeneous Area

A surface area of material that is uniform in color and texture throughout, allowing a small number of representative bulk samples to characterize the entire area.

Related: Bulk Sample, Accredited Inspector
Notification of Demolition and Renovation

The written notice an operator must submit to the appropriate regulatory agency before starting work, describing the facility, the asbestos involved, and the scheduled start and completion dates.

Related: Ten Working Day Notice, Threshold Amount
Ten Working Day Notice

The minimum advance period, measured in working days, before demolition or renovation begins that a complete notification must be postmarked or delivered to the regulatory agency.

Related: Notification of Demolition and Renovation, Revised Notification
Revised Notification

An updated notification submitted when information in the original notice changes, such as the start date or amount of asbestos to be removed, so the agency receives accurate project details.

Related: Notification of Demolition and Renovation, Ten Working Day Notice
Emergency Renovation

A renovation ordered by a government official or caused by a sudden event such as a structural failure, which may allow abbreviated notice and expedited handling of asbestos-containing material.

Related: Notification of Demolition and Renovation, Revised Notification
Start Date

The date on which demolition or renovation work, including asbestos removal, is scheduled to begin, and which must be reported accurately in the notification to the agency.

Related: Notification of Demolition and Renovation, Completion Date
Completion Date

The date on which the asbestos-related work at the facility is expected to finish, recorded in the notification and used by the agency to schedule inspections and verify compliance.

Related: Start Date, Notification of Demolition and Renovation
On-Site Records

Documents that must be kept at the work site during the project, such as the notification, inspection findings, training certificates, and waste shipping records, available for agency review.

Related: Notification of Demolition and Renovation, Waste Shipment Record
Training Certificate

A document showing that a worker, supervisor, or inspector has completed required asbestos training and is currently accredited or certified to perform their assigned role on the project.

Related: Accredited Inspector, On-Site Records
Waste Shipment Record

A tracking form that accompanies asbestos waste from the generation site to the disposal facility, documenting the quantity, origin, transporter, and receipt of the material.

Related: Disposal Site, Manifest Tracking
Manifest Tracking

The process of following waste shipment records through each stage of transport and disposal, confirming that the waste reached an approved site and that all copies were returned and retained.

Related: Waste Shipment Record, Disposal Site
Disposal Site

A permitted landfill or facility authorized to accept asbestos-containing waste, where the material must be handled and covered according to applicable federal and state requirements.

Related: Waste Shipment Record, Manifest Tracking
Waste Packaging

The practice of placing removed asbestos material in leak-tight, labeled containers while wet, preventing fiber release during handling, storage, and transport to the disposal site.

Related: Waste Shipment Record, Disposal Site
Chain of Custody

A documented record showing who collected, handled, and transferred a sample or waste container, preserving the integrity and traceability of the material from origin to final destination.

Related: Bulk Sample, Waste Shipment Record
Accredited Laboratory

A laboratory that has been approved under a recognized program to analyze bulk asbestos samples, using validated methods such as PLM and maintaining quality control documentation.

Related: Bulk Sample, PLM