BEMP study materials
BEMP study resources

BEMP cheat sheet

BEMP · Keep the key ideas within reach.

Quick reference

Energy Modeling Fundamentals and Theory

  • Conduction: q = U × A × ΔT = A × ΔT / R_total, where R_total = Σ(L/k) for each layer plus inside and outside film resistances.

  • Sensible air heat: Q_s = 1.08 × CFM × ΔT (Btu/h) or 1.21 × L/s × ΔT (W); latent heat: Q_L = 4,840 × CFM × ΔW with ΔW in grains/lb.

  • Degree-day estimate: E = (UA × HDD × 24) / η; accuracy requires the balance point to match the building balance temperature rather than a fixed 65°F.

  • EER = 3.412 × COP. SEER and HSPF are seasonal ratings and cannot be converted to steady-state COP by a single factor.

  • Fan and pump affinity laws: flow ∝ speed, head/pressure ∝ speed², shaft power ∝ speed³.

  • SHGC = directly transmitted solar plus the fraction of absorbed solar that flows inward; it and visible transmittance trade off in glazing selection.

  • Infiltration driving forces are stack effect (indoor-outdoor temperature difference) and wind; models use either effective leakage area (crack method) or air-change rates.

  • Steady-state whole-building balance: internal + solar + HVAC gains equal envelope + infiltration + ventilation losses; thermal mass makes the real problem transient and shifts peaks.

  • ASHRAE Standard 140 (BESTEST) defines analytical, empirical, and comparative validation cases; Standard 90.1 Appendix G defines baseline modeling rules.

Quick reference

Model Creation and Simulation

  • Zone rule: one thermal zone per HVAC control zone; interior spaces with no envelope exposure can often be aggregated without loss of accuracy.

  • Weather selection: TMY3/IWEC/CWEC typical-year files for annual energy and Appendix G compliance; design-day (ASHRAE 99.6%/0.4%) conditions for sizing runs.

  • Time step: 15-minute to hourly is default; shorter steps (e.g., 10 min) are needed when controls, economizers, or thermal-mass interaction govern results.

  • Layer order matters: placing insulation outside the mass keeps mass inside the conditioned envelope and changes peak timing compared with insulation placed inboard.

  • Appendix G baseline HVAC is assigned by building type and conditioned floor area, with prescribed fan power limits (e.g., 0.35 W/cfm for VAV) and economizer requirements.

  • Equipment performance curves (biquadratic/cubic) are fits valid only in the rated range; extrapolation outside it produces unrealistic capacity and power.

  • Calibration thresholds per ASHRAE Guideline 14: monthly NMBE within ±5% and CV(RMSE) ≤15%; hourly NMBE within ±10% and CV(RMSE) ≤30%.

  • Every conditioned zone requires a thermostat; spaces left unassigned default to uncontrolled, a common source of silent model errors.

  • Schedules are fractional multipliers (0 to 1) applied to a design level (W/ft², cfm/ft², people/ft²) for each hour of the year.

Quick reference

Results Analysis and Interpretation

  • EUI = annual site energy (kBtu) ÷ conditioned floor area (ft²); source EUI applies site-to-source multipliers that include generation and delivery losses.

  • 90.1 Appendix G acceptance checks: unmet load hours ≤300 per year, and proposed design energy cost not exceeding the baseline budget.

  • Report energy and demand together - annual kWh/therms plus peak kW and time-of-use cost - because measures that cut peaks may barely change annual consumption.

  • Comfort evaluation uses ASHRAE Standard 55: PMV within ±0.5 and PPD ≤10%, plus zone temperature exceedance hours in addition to unmet load hours.

  • Normalize savings for weather using regression on heating and cooling degree days before comparing simulated results with measured data.

  • Benchmark end-use results against CBECS or ENERGY STAR ranges before drawing conclusions; an EUI far outside the range signals an input error.

  • Attribute savings with parametric runs that change one variable at a time, separating design effects from modeling-assumption effects.

  • Baseline and proposed models must share identical schedules, setpoints, and weather files; otherwise the comparison is invalid.

Quick reference

Modeling Project Management, Documentation, and Quality Assurance

  • ASHRAE Standard 209 defines modeling cycles (simple box, conceptual, detailed loads, HVAC, compliance); fidelity increases only as design decisions are fixed.

  • ASHRAE Guideline 14 governs savings determination, calibrated simulation, and uncertainty analysis; IPMVP defines measurement boundary options A through D.

  • QA checklist: geometry versus drawings, space/zone assignment, schedule totals, fan and pump power, outside-air rates, and equipment capacities versus schedules.

  • Energy balance reconciliation: modeled end uses plus unaccounted losses must be consistent with envelope loads driven by the weather file.

  • Document the weather file name, software name and version, code version, and every assumption not derivable from drawings.

  • Version control: a unique run identifier for each simulation, with input file, output report, and assumptions memo archived together.

  • Check for convergence and simulation warnings or errors before any results are analyzed or reported.

  • Independent peer review with a rerun of at least one key parametric case verifies reproducibility before results are released.