BOMI FMA study materials
BOMI FMA study resources

BOMI FMA cheat sheet

BOMI FMA · Keep the key ideas within reach.

Quick reference

Facilities Management Core Curriculum

  • Facility life cycle phases: planning, programming, design, construction, occupancy, operations, and disposal; each phase has distinct budget, risk, and approval gates.

  • Total cost of ownership equals initial capital cost plus operating costs, maintenance, utilities, and renewal over the holding period; compare alternatives on present value, not first cost.

  • Space planning benchmark: usable area divided by gross area yields the efficiency ratio; typical office targets fall roughly between 0.75 and 0.85.

  • Churn rate equals moves per year divided by occupied workstations; high churn signals space strategy or organizational instability.

  • Post-occupancy evaluation compares measured performance against program requirements and occupant satisfaction; results feed back into the next programming cycle.

  • Capital renewal funding should be tied to a condition assessment cycle; deferred maintenance compounds because backlog grows faster than the funding gap.

  • Lease decision rule: compare net effective rent across options by netting concessions and free rent against term, then discount to present value.

  • Emergency preparedness follows an all-hazards cycle: risk assessment, planning, training, drilling, and after-action review with corrective actions tracked to closure.

Quick reference

Facilities Management Supporting Curriculum

  • Payback period equals initial investment divided by annual net savings; simple payback ignores time value and favors short-horizon projects.

  • Return on investment equals net benefit divided by cost; internal rate of return is the discount rate at which net present value equals zero.

  • Life-cycle cost analysis discounts future costs using a real discount rate; escalation is applied separately to energy and labor categories.

  • Maintenance strategy selection: reactive suits low-criticality, low-cost assets; preventive suits predictable wear; predictive suits high-consequence assets with condition monitoring.

  • Reliability metrics: mean time between failures equals operating time divided by number of failures; availability equals uptime divided by total time.

  • Project delivery selection: design-bid-build suits well-defined scope; design-build compresses schedule; construction management at risk suits complex, fast-track work.

  • Regulatory compliance requires identifying applicable codes, assigning an accountable owner, documenting inspections, and tracking corrective actions to closure.

  • Benchmarking compares energy or cost per unit area against peer portfolios; normalize for climate, occupancy density, and hours of operation before drawing conclusions.