BOMI FMA study materials
BOMI FMA study resources

BOMI FMA flashcards

BOMI FMA · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Efficiency ratio
Usable area divided by gross area. It measures how much of a building's total floor area is assignable to occupants versus circulation, structure, and mechanical space.
Churn rate
The number of occupant moves in a period divided by the number of occupied workstations. It indicates space volatility and helps forecast reconfiguration workload and cost.
Post-occupancy evaluation
A structured assessment after occupancy that compares actual building performance and occupant satisfaction against the original program and design intent.
Total cost of ownership
The sum of acquisition cost plus all operating, maintenance, utility, renewal, and disposal costs over the holding period, usually expressed as a present value.
Deferred maintenance backlog
The accumulated value of maintenance and renewal work that was not performed when scheduled. It grows faster than the funding gap because deterioration accelerates.
All-hazards emergency plan
A preparedness framework covering risk assessment, planning, training, drilling, and after-action review, designed to apply across many emergency types rather than one scenario.
Net effective rent
Contract rent adjusted for concessions such as free rent and tenant improvement allowances, then divided across the lease term to allow fair comparison between lease options.
Space programming
The planning phase that translates organizational requirements into quantified area needs, adjacencies, and performance criteria before design begins.
Condition assessment
A systematic evaluation of building systems and components that rates physical condition and remaining service life to prioritize capital renewal spending.
Move management
The coordinated process of planning, scheduling, and executing occupant relocations, including furniture, technology, communications, and post-move closeout verification.
Gross building area
The total enclosed floor area measured to the exterior walls. It is the denominator for efficiency ratios and the basis for many cost-per-area benchmarks.
Workplace utilization rate
Actual occupancy or seat use divided by available capacity during measured periods. Low utilization supports consolidation or alternative workplace strategies.
Simple payback period
Initial investment divided by annual net savings. It shows how many years are needed to recover the outlay and ignores cash flows after payback.
Net present value
The sum of discounted future cash inflows minus outflows. A positive value indicates the project returns more than the required discount rate.
Internal rate of return
The discount rate at which a project's net present value equals zero. It is compared against the hurdle rate to accept or reject an investment.
Life-cycle cost analysis
A method that discounts initial and future costs, including energy, maintenance, and replacement, to a common present value for comparing design or equipment alternatives.
Mean time between failures
Total operating time divided by the number of failures in that period. It quantifies equipment reliability and informs maintenance and sparing decisions.
Availability
Uptime divided by total time, expressed as a percentage. It combines failure frequency and repair duration into a single measure of system dependability.
Preventive maintenance
Scheduled servicing performed on a time or usage basis to reduce predictable wear failures. It suits assets with known failure patterns and moderate criticality.
Predictive maintenance
Condition-based intervention triggered by monitoring data such as vibration or temperature. It suits high-consequence assets where failure cost justifies monitoring investment.
Design-build delivery
A project delivery method in which one entity holds responsibility for both design and construction, compressing schedule and creating a single point of accountability.
Design-bid-build delivery
A sequential method using separate design and construction contracts awarded through competitive bidding. It suits well-defined scope but lengthens schedule.
Construction management at risk
A delivery method where the construction manager commits to a guaranteed maximum price and participates in design, supporting fast-track scheduling on complex projects.
Hurdle rate
The minimum acceptable return used to screen capital investments. Projects whose internal rate of return falls below the hurdle rate are typically rejected.
Energy use intensity
Annual energy consumption divided by floor area. It is the standard benchmarking metric, but comparisons must normalize for climate, occupancy, and operating hours.
Real discount rate
The discount rate excluding general inflation, used in life-cycle cost analysis when future costs are stated in constant dollars without escalation.
Capital renewal
Planned replacement of building components that reach the end of useful life. Funding is typically scheduled from condition assessments rather than reactive requests.
Corrective action tracking
A compliance control that logs identified deficiencies, assigns an accountable owner and due date, and verifies closure so findings are not repeated.
Guaranteed maximum price
A contract ceiling above which the contractor absorbs cost overruns. It transfers cost risk to the builder in exchange for a higher contingency or fee.
Return on investment
Net benefit divided by cost, expressed as a percentage. It is simple to communicate but ignores project duration and the timing of cash flows.
Failure modes analysis
A structured review identifying how components can fail, the severity and likelihood of each failure, and the detection controls needed to reduce risk.
Operating expense benchmarking
Comparing cost per unit area against peer facilities after normalizing for service level, climate, occupancy, and building age to identify performance gaps.