BPI Building Analyst study materials
BPI Building Analyst study resources

BPI Building Analyst study plan

BPI Building Analyst · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Science and Home Performance Fundamentals & Assessment, Testing and Diagnostic Measurement

  • Define the stack effect, wind effect, and mechanical pressure drivers, and explain how each produces infiltration or exfiltration in a two-story house

  • Distinguish conduction, convection, and radiation heat transfer and calculate a simple U-value-to-R-value conversion for three common assemblies

  • Identify the components of the pressure boundary, thermal boundary, and moisture boundary and explain why they rarely coincide

  • Describe how temperature, pressure, and relative humidity interact to create condensation risk on a given surface

Your checkpoint

One-page hand-drawn cross-section of a two-story house labeling all three boundaries, three pressure drivers, and two condensation-risk locations, with a 100-word written justification

Week 2

Assessment, Testing and Diagnostic Measurement

  • Sequence a full home performance assessment walkthrough from intake to data collection to exit interview

  • Explain what a blower door measures, the difference between CFM50 and ACH50, and how to normalize leakage to conditioned volume and envelope area

  • Describe correct blower door setup steps including sealing, baseline pressure reading, gauge zeroing, and confirming no occupant interference

  • Interpret a zone pressure map to locate the largest leakage sites

  • Explain the purpose and limits of duct leakage testing and infrared thermography in a diagnostic sequence

Your checkpoint

Completed blower door field checklist plus a written interpretation of a hypothetical test result (3,200 CFM50 on a 2,000 sq ft, 16,000 cu ft home) including ACH50 and a qualitative leakage verdict

Week 3

Assessment, Testing and Diagnostic Measurement & Building Shell, Insulation and Air Sealing

  • Convert measured blower door results into ACH50 and CFM50 per square foot of envelope and compare against common program thresholds

  • Select the correct insulation type and R-value target for attics, walls, rim joists, and crawl spaces based on climate and moisture conditions

  • Explain the difference between air sealing and insulation and why air sealing must precede insulation in most assemblies

  • Identify the top ten air leakage locations in a typical older home and the appropriate sealing method for each

  • Describe proper attic air sealing around penetrations, top plates, chases, and knee walls without creating moisture or combustion air problems

Your checkpoint

Prioritized air sealing work list for a sample 1,800 sq ft home with at least 10 line items, each with location, method, material, and estimated leakage reduction rationale

Week 4

Building Shell, Insulation and Air Sealing & HVAC Systems, Combustion Safety and Ventilation

  • Evaluate attic ventilation, vapor retarder placement, and interior/exterior insulation strategies for moisture safety in a cold and a mixed-humid climate

  • Explain the combustion triangle and the difference between open combustion appliances and sealed combustion appliances

  • Describe how depressurization from exhaust fans and duct leakage can cause backdrafting of naturally drafting appliances

  • Identify the components of a safe combustion appliance zone and the conditions that trigger a worst-case depressurization test

  • Explain the purpose of a carbon monoxide monitor and the difference between ambient CO testing and flue gas analysis

Your checkpoint

Written combustion safety test procedure covering worst-case setup, allowable depressurization limits, spillage observation time, and explicit pass/fail criteria for a naturally drafting water heater

Week 5

HVAC Systems, Combustion Safety and Ventilation

  • Interpret combustion analyzer readings including oxygen, carbon dioxide, carbon monoxide, stack temperature, and steady-state efficiency

  • Diagnose common combustion faults such as excess air, incomplete combustion, flame impingement, and blocked flue from analyzer patterns

  • Explain how to size and select whole-house ventilation to meet ASHRAE 62.2 requirements using the ventilation rate formula

  • Compare exhaust-only, supply-only, and balanced ventilation strategies by pressure impact and climate suitability

  • Describe how HVAC duct design, return air paths, and static pressure affect distribution efficiency and room-by-room comfort

Your checkpoint

Completed ventilation sizing calculation for a three-bedroom, 2,000 sq ft home using the ASHRAE 62.2 formula, plus a one-paragraph recommendation of ventilation strategy with justification

Week 6

Energy Modeling, Work Scope and Client Reporting

  • Build a base-case energy model from assessment inputs including envelope areas, R-values, infiltration rate, and equipment efficiencies

  • Explain how to calibrate a model against utility bill data and what magnitude of discrepancy is acceptable

  • Translate proposed measures into modeled savings and rank them by savings-to-investment ratio

  • Explain the difference between predicted savings and realized savings and the factors that cause divergence

Your checkpoint

Base-case versus improved-case comparison table for at least five measures showing modeled annual energy savings, installed cost estimate, and savings-to-investment ratio, with a ranked recommendation

Week 7

Energy Modeling, Work Scope and Client Reporting & Building Shell, Insulation and Air Sealing

  • Write a client-facing report that translates diagnostic findings into plain-language problems, causes, and recommended actions

  • Sequence a work scope so that health and safety items precede envelope work and envelope work precedes HVAC replacement

  • Identify which measures qualify for common incentive or weatherization program requirements and what documentation each needs

  • Anticipate client objections about cost, disruption, and payback and prepare a response for each

  • Explain how to document pre- and post-improvement test results to verify work quality

Your checkpoint

Full sample client report of at least 800 words including assessment summary, prioritized scope of work, cost and savings table, health and safety findings, and next steps

Week 8

Building Science and Home Performance Fundamentals & Assessment, Testing and Diagnostic Measurement & Building Shell, Insulation and Air Sealing & HVAC Systems, Combustion Safety and Ventilation & Energy Modeling, Work Scope and Client Reporting

  • Review all five domains using a weighted checklist and identify the two weakest areas by self-assessment

  • Re-derive the key formulas from memory: ACH50, ASHRAE 62.2 ventilation rate, U-value to R-value, and savings-to-investment ratio

  • Walk through two timed practice scenarios end to end, from assessment through reporting

  • Explain out loud the safety rationale behind combustion safety and worst-case depressurization testing without notes

Your checkpoint

Two completed timed practice scenarios scored against a self-built rubric, plus a one-page weak-area remediation sheet listing the specific facts or procedures still needing review

Milestones

Week 2: Can explain blower door results in CFM50 and ACH50 and state what each does and does not tell you, without notes

Week 4: Can describe the complete combustion safety test sequence and pass/fail criteria for a naturally drafting appliance from memory

Week 6: Can build a base-case model and rank five measures by savings-to-investment ratio with defensible inputs

Week 8: Scores at least 80 percent on both timed practice scenarios and has a written remediation list for remaining gaps