Water Well Driller · Give each week a clear focus.
8 weeks · About 7 hours per week
Water Well Drilling
Diagram the rotary and cable-tool drilling methods from memory, labeling each major component and its function
Define at least 25 core drilling terms (spud, annulus, grout, casing, screen, gravel pack, static and pumping water level) in your own words
Explain how formation type (sand, gravel, clay, fractured rock) drives choice of drilling method and bit type
List the sequence of steps from site assessment to well development in correct order
Your checkpoint
A one-page hand-drawn drilling-method comparison chart plus a 25-term personal glossary
Water Well Drilling
Describe the purpose and correct installation of surface casing, conductor casing, and production casing
Explain annular seal and grout placement methods and why seal integrity protects groundwater
Identify the wellhead components and describe how each is secured and sealed
Summarize regulatory-style requirements for casing depth and sealing in general terms
Your checkpoint
A written 300-word casing-and-seal procedure summary with a labeled cross-section sketch
Water Well Drilling
Compare slot-size and screen-aperture selection rules against grain-size analysis results
Explain gravel pack design: pack thickness, gradation, and placement methods
Describe well development techniques (surge, jet, air-lift, dispersants) and when each is appropriate
Calculate an approximate open-area ratio for a given screen specification
Your checkpoint
A worked screen-and-gravel-pack design sheet for two contrasting formation scenarios
Water Well Drilling
Interpret a driller's log and construct a basic well schematic from it
Explain pump test basics: drawdown, specific capacity, and what a step test reveals
Identify common drilling problems (lost circulation, caving, stuck tools, sand production) and match each to a remedy
Describe disinfection and water-quality sampling steps at completion
Your checkpoint
A completed practice well schematic plus a troubleshooting table of 8 problems with remedies; score 80% or better on a self-made 30-question Domain 1 quiz
Pump Installation
Classify pump types (jet, submersible, line-shaft turbine, reciprocating) by application and depth range
Explain pump curve and system curve interaction and locate the operating point on a sample curve
Calculate total dynamic head from static water level, drawdown, lift, and friction loss
Match motor horsepower and voltage configuration to a given flow and head requirement
Your checkpoint
Three solved pump-sizing problems showing TDH calculation and selected pump/motor from a curve
Pump Installation
Describe drop-pipe, torque-arrestor, and safety-rope installation practices for submersible pumps
Explain electrical requirements: wire sizing, voltage drop, control boxes, and grounding
Outline the procedure for setting the pump depth relative to the well screen and expected drawdown
Identify causes of short cycling, low flow, and overload trips and the diagnostic steps for each
Your checkpoint
A step-by-step pump installation checklist covering mechanical, electrical, and commissioning stages
Water Well Drilling & Pump Installation
Explain how well construction choices (screen, gravel pack, casing) affect pump performance and sand damage
Diagnose integrated failures such as pump cavitation caused by excessive drawdown or screen plugging
Describe start-up, disinfection, and flow-testing of a newly installed pump
Practice 40 mixed-domain questions under timed conditions and review every miss
Your checkpoint
A mixed-domain practice test score of 80% or higher with a written error log of each missed item
Water Well Drilling & Pump Installation
Re-drill weak areas flagged by the error log until each is explained aloud without notes
Recite key formulas and rules of thumb (TDH, specific capacity, screen sizing) from memory
Complete two full-length timed practice exams simulating exam conditions
Review safety practices for rig operation, confined spaces, and electrical work
Your checkpoint
Two timed full-length practice exams with scores of 85% or higher and a final one-page formula and safety sheet
Milestones
Week 2: Can explain casing and sealing decisions for a described formation without notes
Week 4: Domain 1 self-quiz at 80% or better and a correct well schematic from a driller's log
Week 6: Can size a pump from flow and head data and produce an installation checklist from memory
Week 8: Two timed full-length practice exams at 85% or higher