Well Pump Installer study plan
Well Pump Installer · Give each week a clear focus.
8 weeks · About 7 hours per week
Pump and Water System Components
Draw and label the full water path of a submersible system from well screen and drop pipe through pitless adapter, pressure tank, and service line, stating the function of each component.
Differentiate submersible, shallow-well jet, deep-well jet, and booster pump families by practical lift, depth, and flow limits, and match five scenario descriptions to the correct family.
List the purpose, normal setting, and common failure mode of the check valve, torque arrestor, safety rope, pressure switch, pressure tank, and relief valve.
Explain in your own words what a published pump curve shows, how efficiency peaks, and why a pump running far off its curve overheats or short-cycles.
Your checkpoint
A one-page hand-drawn system schematic with every component labeled, plus a 25-card component flashcard deck; score at least 90% on a closed-book self-quiz over the deck.
Pump and Water System Components & Hydraulics, Sizing, and System Design
Calculate total dynamic head for five given wells by summing static lift, drawdown, pressure head, and friction loss, converting freely between feet of head, psi, and meters.
Use a friction-loss table for galvanized, PVC, and polyethylene pipe to select a pipe size that keeps velocity under 5 feet per second for a stated flow.
Determine static water level, pumping water level, and drawdown from a described well test and explain how each changes the required pump setting depth.
Explain how a pressure tank stores usable water, and compute drawdown volume from tank size, precharge, and cut-in/cut-out settings.
Your checkpoint
A worked problem set of 15 head, friction, and tank-drawdown calculations showing every step and unit, graded against a solution key at 90% or better.
Hydraulics, Sizing, and System Design & Electrical Systems, Motors, and Controls
Select a pump model for two case-study homes by plotting required flow and total dynamic head on candidate curves and choosing the model whose best-efficiency range covers the duty point.
Size the pressure tank, service line, and pressure switch settings for those same two homes, and justify each choice in two or three sentences.
Compare standard fixed-pressure, constant-pressure, and variable-frequency drive designs on cost, cycling, and water-hammer risk, and state when each is preferred.
Identify the electrical information on a pump and motor nameplate, including rated voltage, full-load amps, service factor, and phase, and explain what each figure means for circuit design.
Your checkpoint
A two-case design packet containing duty-point plots, selected pump and tank models, pipe sizes, switch settings, and a one-paragraph written justification per case.
Electrical Systems, Motors, and Controls
Apply Ohm's law and the power equation to compute current, voltage drop, and wattage in single-phase and three-phase motor circuits.
Size branch-circuit conductors, overload protection, and disconnect means for three sample motors using nameplate full-load amps and the applicable derating factors.
Explain grounding, bonding, and ground-fault protection for a submersible pump installation, and describe what makes a well casing a shock hazard.
Interpret motor insulation resistance readings and describe how to take a megger reading correctly on a submersible motor.
Your checkpoint
A motor circuit worksheet for three sample installations showing conductor size, breaker size, disconnect type, and expected resistance values, plus a 20-question electrical quiz scored at 85% or better.
Electrical Systems, Motors, and Controls
Adjust a pressure switch cut-in, cut-out, and differential, and describe the symptom produced by each of four common misadjustments.
Trace the control circuit for a system using a control box, capacitor, and start relay, and explain the role of each device during start and run.
Describe start methods for three-phase and large single-phase motors, including magnetic starters, overloads, and the reason for reduced-voltage starting.
Set up and interpret a variable-frequency drive's basic parameters (pressure setpoint, minimum frequency, sleep mode) and list two failure modes caused by wrong settings.
Your checkpoint
A complete wiring diagram and control narrative for one pumped system, plus a labeled photo-free sketch of the control circuit, reviewed against a written checklist with no missing devices.
Installation, Startup, and Commissioning
Sequence a full installation from site verification and well inspection through pump assembly, setting depth, pitless connection, tank placement, and wiring.
Assemble a pump end correctly, including torque arrestor, cable guard, splice sealing, and safety rope, and list three assembly errors that cause callbacks.
Write and walk through a startup checklist covering electrical checks, air purging, gradual valve opening, pressure verification, and disinfection with the correct chlorine dose and contact time.
Perform a yield test and drawdown measurement, then record results on a commissioning form a customer could sign.
Your checkpoint
A written commissioning checklist of at least 20 line items, plus a fully documented mock startup on a practice rig or tabletop setup with measured flow, pressure, and drawdown recorded.
Installation, Startup, and Commissioning & Troubleshooting, Service, and Safety/Regulatory Compliance
Diagnose eight written fault scenarios (no water, low pressure, short cycling, tripped breaker, noisy pump, dirty water) by naming the likely cause and the confirming test for each.
Demonstrate the sequence for electrical troubleshooting: de-energize, lock out, verify absence of voltage, measure winding resistance, megger insulation, and check the capacitor and switch.
Apply job-site safety rules for confined spaces, trenching, rigging, hoisting, and electrical lockout, and identify the required personal protective equipment for each task.
Summarize the regulatory duties that apply to a well installation, including wellhead protection and setback, backflow prevention, disinfection, and reporting to the local authority.
Your checkpoint
A fault-diagnosis decision tree covering six symptoms with test steps and pass/fail thresholds, plus a completed safety and code audit checklist for a simulated job site.
Troubleshooting, Service, and Safety/Regulatory Compliance & Pump and Water System Components
Complete two full-length timed practice exams under test conditions and score each domain separately to expose remaining weak areas.
Re-teach the two lowest-scoring domains by rewriting the missed concepts in your own words and building a short reference sheet for each.
Rehearse a full customer-facing service call script, from intake questions through diagnosis, repair recommendation, and safe return to service.
Verify final recall of safety, electrical, and sizing formulas by completing a 40-item rapid-fire review with no reference material.
Your checkpoint
Two scored practice exams with a written error log listing every missed item, its root cause, and the corrected reasoning, showing a second-attempt accuracy of at least 85% per domain.
Milestones
Week 2: Without notes, sketch the submersible system flow path and correctly solve five total-dynamic-head problems, including unit conversions, in under 30 minutes.
Week 4: Produce a complete design packet for two homes with plotted duty points, then pass the 20-question electrical fundamentals quiz at 85% or better.
Week 6: Walk an instructor or peer through the full commissioning checklist aloud, explaining the reason for each step, and adjust a pressure switch to specified cut-in and cut-out values on a live or simulated rig.
Week 8: Score at least 80% overall on both timed practice exams and at least 75% in every one of the five domains, with a completed error log for every missed item.