Well Pump Installer · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Pump and Water System Components

  • Draw and label the full water path of a submersible system from well screen and drop pipe through pitless adapter, pressure tank, and service line, stating the function of each component.

  • Differentiate submersible, shallow-well jet, deep-well jet, and booster pump families by practical lift, depth, and flow limits, and match five scenario descriptions to the correct family.

  • List the purpose, normal setting, and common failure mode of the check valve, torque arrestor, safety rope, pressure switch, pressure tank, and relief valve.

  • Explain in your own words what a published pump curve shows, how efficiency peaks, and why a pump running far off its curve overheats or short-cycles.

Your checkpoint

A one-page hand-drawn system schematic with every component labeled, plus a 25-card component flashcard deck; score at least 90% on a closed-book self-quiz over the deck.

Week 2

Pump and Water System Components & Hydraulics, Sizing, and System Design

  • Calculate total dynamic head for five given wells by summing static lift, drawdown, pressure head, and friction loss, converting freely between feet of head, psi, and meters.

  • Use a friction-loss table for galvanized, PVC, and polyethylene pipe to select a pipe size that keeps velocity under 5 feet per second for a stated flow.

  • Determine static water level, pumping water level, and drawdown from a described well test and explain how each changes the required pump setting depth.

  • Explain how a pressure tank stores usable water, and compute drawdown volume from tank size, precharge, and cut-in/cut-out settings.

Your checkpoint

A worked problem set of 15 head, friction, and tank-drawdown calculations showing every step and unit, graded against a solution key at 90% or better.

Week 3

Hydraulics, Sizing, and System Design & Electrical Systems, Motors, and Controls

  • Select a pump model for two case-study homes by plotting required flow and total dynamic head on candidate curves and choosing the model whose best-efficiency range covers the duty point.

  • Size the pressure tank, service line, and pressure switch settings for those same two homes, and justify each choice in two or three sentences.

  • Compare standard fixed-pressure, constant-pressure, and variable-frequency drive designs on cost, cycling, and water-hammer risk, and state when each is preferred.

  • Identify the electrical information on a pump and motor nameplate, including rated voltage, full-load amps, service factor, and phase, and explain what each figure means for circuit design.

Your checkpoint

A two-case design packet containing duty-point plots, selected pump and tank models, pipe sizes, switch settings, and a one-paragraph written justification per case.

Week 4

Electrical Systems, Motors, and Controls

  • Apply Ohm's law and the power equation to compute current, voltage drop, and wattage in single-phase and three-phase motor circuits.

  • Size branch-circuit conductors, overload protection, and disconnect means for three sample motors using nameplate full-load amps and the applicable derating factors.

  • Explain grounding, bonding, and ground-fault protection for a submersible pump installation, and describe what makes a well casing a shock hazard.

  • Interpret motor insulation resistance readings and describe how to take a megger reading correctly on a submersible motor.

Your checkpoint

A motor circuit worksheet for three sample installations showing conductor size, breaker size, disconnect type, and expected resistance values, plus a 20-question electrical quiz scored at 85% or better.

Week 5

Electrical Systems, Motors, and Controls

  • Adjust a pressure switch cut-in, cut-out, and differential, and describe the symptom produced by each of four common misadjustments.

  • Trace the control circuit for a system using a control box, capacitor, and start relay, and explain the role of each device during start and run.

  • Describe start methods for three-phase and large single-phase motors, including magnetic starters, overloads, and the reason for reduced-voltage starting.

  • Set up and interpret a variable-frequency drive's basic parameters (pressure setpoint, minimum frequency, sleep mode) and list two failure modes caused by wrong settings.

Your checkpoint

A complete wiring diagram and control narrative for one pumped system, plus a labeled photo-free sketch of the control circuit, reviewed against a written checklist with no missing devices.

Week 6

Installation, Startup, and Commissioning

  • Sequence a full installation from site verification and well inspection through pump assembly, setting depth, pitless connection, tank placement, and wiring.

  • Assemble a pump end correctly, including torque arrestor, cable guard, splice sealing, and safety rope, and list three assembly errors that cause callbacks.

  • Write and walk through a startup checklist covering electrical checks, air purging, gradual valve opening, pressure verification, and disinfection with the correct chlorine dose and contact time.

  • Perform a yield test and drawdown measurement, then record results on a commissioning form a customer could sign.

Your checkpoint

A written commissioning checklist of at least 20 line items, plus a fully documented mock startup on a practice rig or tabletop setup with measured flow, pressure, and drawdown recorded.

Week 7

Installation, Startup, and Commissioning & Troubleshooting, Service, and Safety/Regulatory Compliance

  • Diagnose eight written fault scenarios (no water, low pressure, short cycling, tripped breaker, noisy pump, dirty water) by naming the likely cause and the confirming test for each.

  • Demonstrate the sequence for electrical troubleshooting: de-energize, lock out, verify absence of voltage, measure winding resistance, megger insulation, and check the capacitor and switch.

  • Apply job-site safety rules for confined spaces, trenching, rigging, hoisting, and electrical lockout, and identify the required personal protective equipment for each task.

  • Summarize the regulatory duties that apply to a well installation, including wellhead protection and setback, backflow prevention, disinfection, and reporting to the local authority.

Your checkpoint

A fault-diagnosis decision tree covering six symptoms with test steps and pass/fail thresholds, plus a completed safety and code audit checklist for a simulated job site.

Week 8

Troubleshooting, Service, and Safety/Regulatory Compliance & Pump and Water System Components

  • Complete two full-length timed practice exams under test conditions and score each domain separately to expose remaining weak areas.

  • Re-teach the two lowest-scoring domains by rewriting the missed concepts in your own words and building a short reference sheet for each.

  • Rehearse a full customer-facing service call script, from intake questions through diagnosis, repair recommendation, and safe return to service.

  • Verify final recall of safety, electrical, and sizing formulas by completing a 40-item rapid-fire review with no reference material.

Your checkpoint

Two scored practice exams with a written error log listing every missed item, its root cause, and the corrected reasoning, showing a second-attempt accuracy of at least 85% per domain.

Milestones

Week 2: Without notes, sketch the submersible system flow path and correctly solve five total-dynamic-head problems, including unit conversions, in under 30 minutes.

Week 4: Produce a complete design packet for two homes with plotted duty points, then pass the 20-question electrical fundamentals quiz at 85% or better.

Week 6: Walk an instructor or peer through the full commissioning checklist aloud, explaining the reason for each step, and adjust a pressure switch to specified cut-in and cut-out values on a live or simulated rig.

Week 8: Score at least 80% overall on both timed practice exams and at least 75% in every one of the five domains, with a completed error log for every missed item.