GSC Project Manager flashcards
GSC Project Manager · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Business case
- A documented justification for investment that sets out strategic alignment, options considered, expected benefits, costs, key risks, and a recommendation to support a go or no-go decision.
- Net present value
- The sum of future cash flows discounted to today at a given rate, minus the initial investment. A positive NPV means the project adds value at that discount rate.
- Payback period
- The time required for cumulative net cash inflows to equal the initial investment. It is simple to calculate but ignores the time value of money and all later cash flows.
- Project charter
- A document issued by the sponsor that formally authorizes the project, names the project manager, and records high-level scope, budget, milestones, and success criteria.
- Critical path
- The longest-duration sequence of dependent activities through the network. Its total float is zero, and delay on any activity in it delays the project finish date.
- Total float
- The amount of time an activity can be delayed without delaying the project finish date, calculated as late finish minus early finish or late start minus early start.
- PERT expected duration
- A weighted duration estimate computed as (optimistic plus four times most likely plus pessimistic) divided by six, used when activity durations are uncertain.
- Schedule compression
- Crashing adds resources to critical-path activities at extra cost; fast tracking overlaps activities that were sequential and increases rework and quality risk.
- Cost baseline
- The time-phased sum of authorized work package budgets plus contingency reserves, against which cost performance is measured. Management reserve is excluded from it.
- Cost performance index
- Earned value divided by actual cost. A value below 1.0 means the project is spending more than the value earned; it is used to forecast final cost.
- Estimate at completion
- A forecast of total project cost. A common formula when current variance is expected to continue is budget at completion divided by the cost performance index.
- Management reserve
- A budget held outside the cost baseline for unidentified risks and unforeseen scope. Using it normally requires sponsor or senior management approval.
- Expected monetary value
- Probability multiplied by impact for a risk. Summing EMVs across identified risks gives the amount typically held as contingency reserve for those risks.
- Risk register
- A living record of each risk's cause, event, effect, probability, impact, score, owner, planned response, trigger, residual risk, and current status.
- Risk response strategies
- For threats: avoid, transfer, mitigate, escalate, accept. For opportunities: exploit, enhance, share, escalate, accept. Each response is assigned to a risk owner.
- Monte Carlo simulation
- A quantitative technique that runs many randomized iterations of cost or schedule inputs to produce a probability distribution of outcomes and support reserve setting.
- Cost of quality
- The total of conformance costs (prevention and appraisal) and non-conformance costs (internal and external failure). Prevention is usually cheaper than failure.
- Control chart
- A run chart with statistically derived upper and lower control limits that separates common-cause variation from special-cause variation and signals when a process is out of control.
- Pareto chart
- A bar chart ordering causes by frequency with a cumulative line, used to focus improvement effort on the few causes responsible for most defects.
- Quality audit
- An independent structured review determining whether project activities comply with organizational policies, processes, and procedures, and identifying improvements.
- Fixed-price contract
- An agreement where the seller commits to a defined scope for a set price, placing cost risk on the seller. Changes require formal contract modification.
- Cost-reimbursable contract
- An agreement where the buyer pays allowable actual costs plus a fee, placing cost risk on the buyer. It suits work whose scope cannot be precisely defined.
- Bidder conference
- A meeting held before proposals are submitted to give all prospective sellers identical information. Any clarification given must reach every bidder.
- Statement of work
- A document describing the work to be performed in sufficient detail for sellers to price and plan it, referenced in the procurement contract.
- Power-interest grid
- A stakeholder classification tool that maps influence against interest to guide engagement: manage closely, keep satisfied, keep informed, or monitor.
- Communication channels
- The number of possible communication paths among n participants, calculated as n times (n minus 1) divided by 2; it grows rapidly as the team expands.
- Communication management plan
- A plan specifying who receives which information, in what format and frequency, through which channel, and how escalations and feedback are handled.
- Integrated change control
- The process of logging, evaluating, and approving or rejecting change requests, then updating baselines, plans, and documents only through formal authorization.
- Scope creep
- Uncontrolled addition of scope without change control, approval, or adjustment to time, cost, and resources, eroding the baseline and performance measures.
- Lessons learned
- Knowledge captured during and after the project about what worked, what failed, and why, stored in organizational process assets to improve future projects.
- Benefits register
- A record of each expected benefit with its owner, metric, baseline, target value, measurement date, and the mechanism by which it will be realized.
- Conflict of interest
- A situation where personal, financial, or other interests could improperly influence professional judgment. It must be disclosed promptly and managed or removed.