Ground Disturbance Level II flashcards
Ground Disturbance Level II · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Ground disturbance definition
- Any activity that displaces or penetrates the ground, including excavation, trenching, augering, boring, and driving posts, and sometimes grading that alters soil structure.
- Pre-job hazard assessment
- A documented review before work begins that identifies buried facilities, soil conditions, utilities, traffic, adjacent structures, and environmental sensitivities, and records controls for each hazard.
- Spoil pile setback
- Spoil and materials must be kept back from the excavation edge, commonly at least 1 m, and never closer than the depth of the excavation, whichever is greater.
- Trench protective system threshold
- Any trench 1.2 m (4 ft) or deeper requires a protective system such as sloping, shoring, or a trench box before workers enter.
- Exit distance rule
- Trenches 1.5 m (5 ft) or deeper require a ladder, ramp, or other means of exit within 7.5 m (25 ft) of lateral travel for every worker.
- Written ground disturbance plan
- A document recording scope, locate status, crossing agreements, energy isolation, emergency response, and supervisory sign-off before ground is broken.
- Crossing agreement
- A written authorization from a pipeline or utility owner allowing the excavation to cross its right-of-way or corridor, specifying conditions and supervision requirements.
- Reassessment triggers
- The hazard assessment must be repeated when conditions change, such as a new crew, weather event, water ingress, or a change in depth or method.
- One-Call notice period
- Locate requests must be submitted before digging, typically 2 to 3 full working days ahead, and the ticket number and expiry date must be recorded.
- Tolerance zone
- The area within a set distance either side of a marked facility centreline, commonly 1 m, where hand or non-destructive excavation is mandatory.
- Locate colour code
- Red electric, yellow gas and oil, orange communications, blue potable water, green sewer, purple reclaimed water, and white proposed excavation.
- Non-destructive excavation
- Hand digging, vacuum excavation, or another approved method used to expose buried facilities within the tolerance zone without mechanical damage.
- Locate ticket validity
- Locate marks remain valid only for a limited period, often 10 to 30 days, and must be refreshed if the ticket expires or the marks are destroyed.
- Locate is not a guarantee
- Marks indicate approximate position only; the excavator must confirm depth and location by exposing the facility, and stop if unmarked facilities are found.
- Contact or damage response
- Stop work, notify the utility operator and the One-Call centre, make the area safe, and do not resume until the facility is repaired and cleared.
- Private facility locating
- Customer-owned facilities beyond the utility's responsibility may not be covered by the One-Call service, so the excavator must arrange separate locating.
- Competent supervisor
- A designated person who is trained, experienced, and authorized to supervise ground disturbance and to stop work when conditions become unsafe.
- Atmospheric testing
- Testing for oxygen deficiency, flammable gas, and toxic gas is required before entry where a hazardous atmosphere may exist, with continuous monitoring where the hazard persists.
- Excavation inspection
- A competent person inspects the excavation at the start of each shift, after rain or vibration, and after any change in conditions.
- Perimeter protection
- Barricades, signage, and lighting protect the excavation perimeter, and open excavations must be covered or guarded when left unattended.
- Water control
- Ditching, pumps, and sumps control water; standing water in a trench increases collapse risk and can hide hazards from view.
- Undermining protection
- The excavation must not undermine adjacent foundations, roads, or utility supports; spoil and equipment must not be stored over buried utilities.
- Ladder placement
- Ladders must extend above the excavation edge, be secured, and be spaced so no worker travels more than 7.5 m (25 ft) to reach one.
- Soil collapse warning signs
- Tension cracks, bulging sides, spalling, water seepage, and settlement of adjacent ground indicate instability and require workers to leave the excavation.
- Employer duty
- The employer must provide a safe work system, training, supervision, and resources so that the ground disturbance plan can be followed.
- Supervisor duty
- The supervisor verifies current locates, follows the plan, ensures worker training, and inspects the excavation before and during work.
- Worker duty
- Workers follow the plan, use required protective equipment, report hazards, and stop work when they believe conditions are unsafe.
- Utility operator duty
- The utility operator responds to locate requests, marks its facilities, and provides information about its infrastructure when requested.
- One-Call centre role
- The centre receives and transmits locate requests and maintains the ticket record; it does not perform the physical locating of facilities.
- Compliance records
- Locate tickets, hazard assessments, inspection logs, training records, and incident reports must be kept for the period required by regulation.
- Incident notification
- A contact, injury, or release requires notification to the regulator, the utility operator, and emergency services as required by law.
- Ground disturbance authorization
- A permit or written approval from the landowner, utility, or regulator may be required before work begins; working without it is non-compliant.