Ground Disturbance Level II study materials
Ground Disturbance Level II study resources

Ground Disturbance Level II study plan

Ground Disturbance Level II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Ground disturbance planning and hazard assessment

  • Define ground disturbance in your own words and list the activities that trigger planning obligations

  • Identify the sequence of planning steps from scope definition through hazard assessment

  • Explain the purpose and components of a hazard assessment for a ground disturbance project

  • Describe how scope, location, depth, and soil conditions shape the hazard assessment

Your checkpoint

A one-page planning flowchart mapping scope definition to hazard assessment sign-off, with each step annotated in two sentences

Week 2

Ground disturbance planning and hazard assessment & Supervision, roles, and regulatory compliance

  • Distinguish the roles of the project owner, prime contractor, ground disturber, and locator in planning

  • Explain how supervision responsibilities shift when multiple parties work at one site

  • Outline how to document a hazard assessment and record worker acknowledgement

  • Summarize how a pre-job meeting is used to communicate identified hazards

Your checkpoint

A completed sample hazard assessment form for a hypothetical trenching project, including identified hazards, controls, and sign-off lines

Week 3

Buried facility locating and notification requirements

  • Describe the notification process for requesting buried facility locates and the information a request must contain

  • Explain locate timelines, tolerance zones, and what to do when a locate is late or incomplete

  • Identify the limits of locate marks and why hand exposure is required near marked facilities

  • List the types of buried facilities that may cross a work area

Your checkpoint

A checklist for submitting and tracking a locate request, from call to mark verification, with a tolerance-zone handling note

Week 4

Buried facility locating and notification requirements & Safe excavation and ground disturbance practices

  • Explain how to verify and preserve locate marks before and during excavation

  • Describe safe hand-exposure methods for confirming a buried facility's exact position

  • Identify the conditions that require stopping work and re-requesting a locate

  • Summarize how changes in scope or depth affect locate validity

Your checkpoint

A written procedure for exposing a buried facility by hand, including stop-work triggers and mark-preservation steps

Week 5

Safe excavation and ground disturbance practices

  • Explain how to classify and protect an excavation using slope, shoring, or shielding

  • Describe safe access and egress requirements for excavations

  • Identify hazards from spoil placement, water accumulation, and adjacent loads

  • Summarize atmospheric testing and entry precautions before workers enter an excavation

Your checkpoint

A site sketch of a planned excavation showing protective system, access points, spoil location, and exclusion zones, each labelled with a short rationale

Week 6

Safe excavation and ground disturbance practices & Supervision, roles, and regulatory compliance

  • Explain the role of the supervisor in daily inspection of excavations and ground disturbance work

  • Describe how to conduct and record a pre-entry inspection

  • Outline the process for reporting incidents and near misses

  • Summarize how to verify worker competency and training before assigning tasks

Your checkpoint

A daily inspection log template with fields for protective system condition, access, atmosphere, and supervisor sign-off, plus a sample completed entry

Week 7

Supervision, roles, and regulatory compliance

  • Map the regulatory obligations that apply to ground disturbance work in your jurisdiction

  • Explain how permits, notifications, and records support compliance

  • Outline the corrective action process when an unsafe condition is identified

  • Describe how to audit a completed ground disturbance project against its plan

Your checkpoint

A compliance matrix listing obligations, the responsible party, and the record that evidences completion, covering at least eight items

Week 8

Ground disturbance planning and hazard assessment & Buried facility locating and notification requirements & Safe excavation and ground disturbance practices & Supervision, roles, and regulatory compliance

  • Integrate planning, locating, excavation, and supervision into one end-to-end project scenario

  • Diagnose errors in a sample project narrative and propose corrected actions

  • Rehearse timed practice questions across all four domains

  • Close knowledge gaps identified in practice results

Your checkpoint

A written walkthrough of a sample project from planning through closeout, with a short list of the three weakest topics and a review plan for each

Milestones

Week 2: Can explain, without notes, who is responsible for each step of a hazard assessment and how it is documented

Week 4: Scores at least 80 percent on a self-made 20-question quiz covering planning and locating topics

Week 6: Can describe slope, shoring, and shielding options and state when each is appropriate

Week 8: Completes a full timed practice set across all four domains and reviews every missed question