OAA Admission Exam · Get comfortable with the vocabulary.

Standard of Care

The degree of skill and diligence ordinarily exercised by competent architects under similar circumstances. It defines the legal benchmark for judging professional negligence and replaces promises of perfect results.

Related: Negligence, Privity of Contract, Professional Seal
Negligence

Failure to exercise the standard of care owed to another, causing harm. In practice, it requires showing a duty existed, the duty was breached, and that breach caused measurable damage.

Related: Standard of Care, Errors and Omissions Insurance
Privity of Contract

The legal relationship between parties who have directly contracted with one another. It limits who may sue on a contract, though statutes and case law increasingly extend duties to third parties.

Related: Standard of Care, Indemnification
Professional Seal

The stamp, with signature and date, that a licensed architect applies to drawings and specifications to certify responsibility for them. Unsealed documents generally cannot be used for permitting or construction.

Related: Standard of Care, Delegation of Design
Delegation of Design

Assigning design responsibility to another qualified party, such as a consultant. The architect typically remains responsible to the client for coordinating that work unless the contract states otherwise.

Related: Professional Seal, Subconsultant
Subconsultant

A firm or individual engaged by the architect, not the owner, to provide specialized services such as structural, mechanical, or civil engineering. The architect usually coordinates and integrates their work.

Related: Delegation of Design, Privity of Contract
Indemnification

A contractual promise by one party to cover the losses or liabilities of another. Architects should seek mutual indemnity limited to losses caused by their own negligent acts.

Related: Privity of Contract, Errors and Omissions Insurance
Errors and Omissions Insurance

Professional liability coverage protecting the architect against claims of negligent design, omissions, or professional error. It typically excludes intentional acts, warranties, and certain contractual guarantees.

Related: Negligence, Indemnification
Contingency

A reserve of time or money held to absorb unforeseen conditions, changes, or estimating variance. It is typically reduced as the project advances and risk diminishes.

Related: Change Order, Cost Estimate
Change Order

A written modification to the contract documents that adjusts scope, price, or schedule after execution. It is normally signed by the owner and contractor, with the architect preparing and certifying it.

Related: Contingency, Request for Information, Substantial Completion
Request for Information

A formal written query from the contractor seeking clarification of the contract documents. The architect's timely written response becomes part of the project record and may lead to a change order.

Related: Change Order, Shop Drawing
Shop Drawing

A contractor-prepared drawing detailing how a specific component will be fabricated or installed. The architect reviews it for design intent, not for dimensions or construction means and methods.

Related: Request for Information, Submittal
Submittal

Product data, samples, or drawings submitted by the contractor for the architect's review to confirm conformance with the design concept and contract documents before installation.

Related: Shop Drawing, Request for Information
Substantial Completion

The stage at which the work is sufficiently complete for its intended use, allowing the owner to occupy it. It triggers warranty periods, retainage release, and the punch list process.

Related: Punch List, Final Completion
Punch List

A written inventory of remaining incomplete or defective work identified at substantial completion. Completion of listed items is a condition for final payment and final completion.

Related: Substantial Completion, Final Completion
Final Completion

The point at which all work, including punch list items, is finished and accepted. It typically follows final inspection and releases remaining retainage and final payment.

Related: Substantial Completion, Punch List
Retainage

A percentage of each payment withheld by the owner until the project reaches specified milestones. It protects the owner against incomplete work and defects, and is governed by contract and statute.

Related: Substantial Completion, Lien
Critical Path Method

A scheduling technique identifying the longest sequence of dependent activities that determines project duration. Delays on critical activities push the completion date; float exists only on noncritical paths.

Related: Float, Schedule of Values
Float

The amount of time an activity can be delayed without affecting the project completion date. Ownership and use of float are often negotiated because it affects delay claims.

Related: Critical Path Method
Schedule of Values

An itemized breakdown of the contract sum allocated to portions of the work, used as the basis for progress payments. It must total the contract price and be approved by the architect.

Related: Retainage, Critical Path Method
Lien

A statutory claim against property by a party who supplied labor or materials and was not paid. Lien waivers and notices are common contract administration tools for managing this risk.

Related: Retainage, Mechanic's Lien Waiver
Mechanic's Lien Waiver

A document in which a contractor or supplier relinquishes lien rights, often in exchange for payment. Conditional waivers take effect on payment; unconditional waivers take effect on signing.

Related: Lien, Retainage
Egress

The continuous and unobstructed path of travel from any point in a building to a public way. It includes exit access, the exit itself, and exit discharge, each with separate code requirements.

Related: Means of Egress Width, Occupant Load
Occupant Load

The calculated number of people a space is designed to hold, based on use and floor area factors. It determines egress width, exit count, and plumbing fixture requirements.

Related: Egress, Means of Egress Width
Means of Egress Width

The minimum clear width of corridors, stairs, and doors required to serve the occupant load. Widths are set by code and reduced by projections such as handrails.

Related: Egress, Occupant Load
Fire Resistance Rating

The period, in hours, that a building element resists fire under standardized test conditions. It is expressed for structural assemblies, walls, and doors and drives compartmentation and separation requirements.

Related: Fire Separation Distance, Type of Construction
Fire Separation Distance

The measured distance from a building face to the lot line, property line, or another building. It influences allowable openings, exterior wall ratings, and permitted building area.

Related: Fire Resistance Rating, Allowable Building Area
Type of Construction

A code classification based on the combustibility of structural elements and their fire resistance. It limits building height and area and interacts with sprinkler protection and occupancy group.

Related: Fire Resistance Rating, Allowable Building Area
Allowable Building Area

The maximum floor area permitted by code for a given occupancy and construction type. It may be increased by frontage, sprinklers, or separation, and is checked per story and in total.

Related: Type of Construction, Fire Separation Distance
Zoning Ordinance

A local law regulating land use, density, height, setbacks, and bulk. It controls what may be built on a site and often requires permits and public review before construction.

Related: Floor Area Ratio, Setback
Floor Area Ratio

The ratio of total building floor area to the area of its lot. It caps development intensity and is often combined with height limits and open space requirements.

Related: Zoning Ordinance, Setback
Setback

The required minimum distance between a building and a lot line, street, or other feature. It protects light, air, and privacy and shapes the buildable envelope of a site.

Related: Zoning Ordinance, Floor Area Ratio
Building Envelope

The boundary separating conditioned interior space from the exterior environment. It controls heat, air, and moisture movement and includes walls, roofs, windows, and foundations.

Related: Thermal Bridging, Vapor Barrier
Thermal Bridging

Heat flow that bypasses insulation through conductive elements such as studs, slabs, or balconies. It reduces effective R-value and can cause condensation and comfort problems.

Related: Building Envelope, Continuous Insulation
Continuous Insulation

Insulation installed as an uninterrupted layer outside the structure, limiting thermal bridging. It improves envelope performance and helps manage dew points within wall assemblies.

Related: Thermal Bridging, Vapor Barrier
Vapor Barrier

A material restricting water vapor diffusion through an assembly. Its placement depends on climate and assembly type, and errors can trap moisture and cause rot or mold.

Related: Building Envelope, Continuous Insulation
Load-Bearing Wall

A wall that carries structural loads from floors or roofs above down to the foundation. Removing or altering it requires structural analysis and usually a building permit.

Related: Structural Span, Beam
Beam

A horizontal structural member that carries transverse loads and transfers them to columns or walls. Its depth and material determine span capacity and deflection performance.

Related: Load-Bearing Wall, Structural Span
Structural Span

The clear distance a structural member must bridge between supports. Span drives member depth, material choice, and deflection limits in design.

Related: Beam, Load-Bearing Wall