OAA Admission Exam study materials
OAA Admission Exam study resources

OAA Admission Exam study plan

OAA Admission Exam · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Architectural Practice and Professional Conduct & Building Codes, Regulations and Standards

  • Map the full Domain 1 and Domain 3 topic outline into a personal checklist with confidence ratings (1-5) for each subtopic

  • Define the architect's standard of care and differentiate it from a guarantee of perfect results, writing a one-paragraph contrast in your own words

  • List the typical phases of architectural service delivery and match each to the deliverables and decisions made at its close

  • Identify the primary regulatory instruments (codes, standards, referenced documents) that govern a project and note how each is adopted or enforced

Your checkpoint

A completed two-domain confidence checklist (at least 40 subtopics) with the five lowest-confidence items flagged for priority review

Week 2

Architectural Practice and Professional Conduct

  • Compare the major project delivery models (design-bid-build, design-build, construction management) on risk allocation, schedule, and cost certainty

  • Sequence the typical owner-architect agreement obligations from schematic design through construction contract administration

  • Explain professional ethics duties around competence, conflict of interest, and honest representation of credentials with two original scenarios each

  • Draft a plain-language summary of architect liability exposure and the role of professional liability insurance

Your checkpoint

A one-page comparison matrix of three delivery models across six criteria (risk, cost certainty, schedule, owner control, architect role, typical disputes)

Week 3

Building Codes, Regulations and Standards

  • Trace how a model building code is adopted, amended, and enforced at the local level, including the role of the authority having jurisdiction

  • Classify occupancy groups and construction types and apply them to three invented building scenarios

  • Compute basic egress requirements (occupant load, exit width, travel distance) for two hypothetical floor plans using stated assumptions

  • Distinguish prescriptive from performance compliance paths and note when each is appropriate

Your checkpoint

A worked egress calculation sheet for two hypothetical occupancies showing occupant load, required exit width, and number of exits, with assumptions stated

Week 4

Building Codes, Regulations and Standards & Building Technology and Systems

  • Apply fire-resistance and separation requirements to a hypothetical mixed-occupancy building and justify each rating chosen

  • Explain accessibility requirements for accessible routes, clear floor space, and reach ranges using dimensional reasoning

  • Describe how structural, mechanical, and electrical systems interact with code-driven life-safety requirements

  • Summarize the permit and inspection sequence from application through certificate of occupancy

Your checkpoint

A code-compliance narrative for one hypothetical mixed-use building (minimum 600 words) covering occupancy, construction type, egress, and accessibility

Week 5

Building Technology and Systems

  • Compare structural system families (frame, load-bearing wall, long-span) on span capability, lateral resistance, and coordination implications

  • Explain heat, air, and moisture movement through building enclosures and identify the control layers in an assembly

  • Describe the function and coordination requirements of primary mechanical, electrical, and plumbing systems in a mid-size commercial building

  • Evaluate how building system selection affects energy performance, first cost, and life-cycle cost

Your checkpoint

An annotated wall and roof assembly diagram (hand-drawn is acceptable) labeling each control layer and explaining its purpose in writing

Week 6

Building Technology and Systems & Project Management and Contract Administration

  • Sequence the construction document set and identify the coordination responsibilities of each consultant

  • Differentiate the roles and authority of the owner, architect, contractor, and construction manager during construction

  • Explain the submittal, request-for-information, and change-order workflows, including typical response timeframes and documentation

  • Describe how sustainable design targets and commissioning requirements are carried into specifications

Your checkpoint

A process flowchart for the submittal and RFI cycles showing each party's action, typical time allowance, and the record produced

Week 7

Project Management and Contract Administration

  • Analyze the standard contract documents for payment, retainage, substantial completion, and final acceptance provisions

  • Interpret the architect's certification and site-visit duties and distinguish them from supervision or warranty of the contractor's work

  • Outline claim and dispute resolution paths from negotiation through mediation and arbitration

  • Prepare for schedule and cost control questions by explaining critical-path logic, float, and earned-value basics

Your checkpoint

A clause-by-clause study table of at least 15 contract provisions with the practical consequence of each for the architect

Week 8

Architectural Practice and Professional Conduct & Building Technology and Systems & Building Codes, Regulations and Standards & Project Management and Contract Administration

  • Re-test every flagged low-confidence item from weeks 1-7 and resolve or re-flag each one

  • Complete two full timed practice sets spanning all four domains and score them by domain

  • Diagnose remaining weak areas from practice results and write a targeted final-review list

  • Rehearse concise explanations of the ten most commonly confused concept pairs across domains

Your checkpoint

A scored full-length practice result by domain plus a final one-page review sheet of the ten concepts most likely to be missed

Milestones

Week 2: Score at least 70% on a 25-question Domain 1 practice set and confirm every week-1 flagged item is either resolved or scheduled

Week 4: Score at least 70% on a 30-question combined Domain 3 and Domain 2 practice set, and verify the week-4 compliance narrative covers all four required sections

Week 6: Score at least 65% on a 30-question combined Domain 2 and Domain 4 practice set and complete the submittal/RFI flowchart without reference material

Week 8: Achieve at least 75% overall on a full-length timed practice exam with no single domain below 65%