OAA Admission Exam study plan
OAA Admission Exam · Give each week a clear focus.
8 weeks · About 7 hours per week
Architectural Practice and Professional Conduct & Building Codes, Regulations and Standards
Map the full Domain 1 and Domain 3 topic outline into a personal checklist with confidence ratings (1-5) for each subtopic
Define the architect's standard of care and differentiate it from a guarantee of perfect results, writing a one-paragraph contrast in your own words
List the typical phases of architectural service delivery and match each to the deliverables and decisions made at its close
Identify the primary regulatory instruments (codes, standards, referenced documents) that govern a project and note how each is adopted or enforced
Your checkpoint
A completed two-domain confidence checklist (at least 40 subtopics) with the five lowest-confidence items flagged for priority review
Architectural Practice and Professional Conduct
Compare the major project delivery models (design-bid-build, design-build, construction management) on risk allocation, schedule, and cost certainty
Sequence the typical owner-architect agreement obligations from schematic design through construction contract administration
Explain professional ethics duties around competence, conflict of interest, and honest representation of credentials with two original scenarios each
Draft a plain-language summary of architect liability exposure and the role of professional liability insurance
Your checkpoint
A one-page comparison matrix of three delivery models across six criteria (risk, cost certainty, schedule, owner control, architect role, typical disputes)
Building Codes, Regulations and Standards
Trace how a model building code is adopted, amended, and enforced at the local level, including the role of the authority having jurisdiction
Classify occupancy groups and construction types and apply them to three invented building scenarios
Compute basic egress requirements (occupant load, exit width, travel distance) for two hypothetical floor plans using stated assumptions
Distinguish prescriptive from performance compliance paths and note when each is appropriate
Your checkpoint
A worked egress calculation sheet for two hypothetical occupancies showing occupant load, required exit width, and number of exits, with assumptions stated
Building Codes, Regulations and Standards & Building Technology and Systems
Apply fire-resistance and separation requirements to a hypothetical mixed-occupancy building and justify each rating chosen
Explain accessibility requirements for accessible routes, clear floor space, and reach ranges using dimensional reasoning
Describe how structural, mechanical, and electrical systems interact with code-driven life-safety requirements
Summarize the permit and inspection sequence from application through certificate of occupancy
Your checkpoint
A code-compliance narrative for one hypothetical mixed-use building (minimum 600 words) covering occupancy, construction type, egress, and accessibility
Building Technology and Systems
Compare structural system families (frame, load-bearing wall, long-span) on span capability, lateral resistance, and coordination implications
Explain heat, air, and moisture movement through building enclosures and identify the control layers in an assembly
Describe the function and coordination requirements of primary mechanical, electrical, and plumbing systems in a mid-size commercial building
Evaluate how building system selection affects energy performance, first cost, and life-cycle cost
Your checkpoint
An annotated wall and roof assembly diagram (hand-drawn is acceptable) labeling each control layer and explaining its purpose in writing
Building Technology and Systems & Project Management and Contract Administration
Sequence the construction document set and identify the coordination responsibilities of each consultant
Differentiate the roles and authority of the owner, architect, contractor, and construction manager during construction
Explain the submittal, request-for-information, and change-order workflows, including typical response timeframes and documentation
Describe how sustainable design targets and commissioning requirements are carried into specifications
Your checkpoint
A process flowchart for the submittal and RFI cycles showing each party's action, typical time allowance, and the record produced
Project Management and Contract Administration
Analyze the standard contract documents for payment, retainage, substantial completion, and final acceptance provisions
Interpret the architect's certification and site-visit duties and distinguish them from supervision or warranty of the contractor's work
Outline claim and dispute resolution paths from negotiation through mediation and arbitration
Prepare for schedule and cost control questions by explaining critical-path logic, float, and earned-value basics
Your checkpoint
A clause-by-clause study table of at least 15 contract provisions with the practical consequence of each for the architect
Architectural Practice and Professional Conduct & Building Technology and Systems & Building Codes, Regulations and Standards & Project Management and Contract Administration
Re-test every flagged low-confidence item from weeks 1-7 and resolve or re-flag each one
Complete two full timed practice sets spanning all four domains and score them by domain
Diagnose remaining weak areas from practice results and write a targeted final-review list
Rehearse concise explanations of the ten most commonly confused concept pairs across domains
Your checkpoint
A scored full-length practice result by domain plus a final one-page review sheet of the ten concepts most likely to be missed
Milestones
Week 2: Score at least 70% on a 25-question Domain 1 practice set and confirm every week-1 flagged item is either resolved or scheduled
Week 4: Score at least 70% on a 30-question combined Domain 3 and Domain 2 practice set, and verify the week-4 compliance narrative covers all four required sections
Week 6: Score at least 65% on a 30-question combined Domain 2 and Domain 4 practice set and complete the submittal/RFI flowchart without reference material
Week 8: Achieve at least 75% overall on a full-length timed practice exam with no single domain below 65%