PEI IMA Grade 9 study materials
PEI IMA Grade 9 study resources

PEI IMA Grade 9 cheat sheet

PEI IMA Grade 9 · Keep the key ideas within reach.

Quick reference

Building and Structure Design

  • Canopy and support structures for dispensing equipment are designed for dead load, live load, wind, snow, and seismic combinations; the governing combination is the one producing the largest member force, not the largest single load.

  • Minimum clear height under a canopy is set so that tanker vehicles and delivery equipment can maneuver without contact; the design vehicle envelope, not the average vehicle, governs.

  • Column bases and anchor bolts are checked for uplift and shear from wind and seismic overturning; anchorage capacity must exceed the calculated demand with the code-required load factors applied.

  • Concrete slabs under dispensers and tank pads are designed for concentrated wheel and point loads; reinforcement and slab thickness are governed by punching shear at column and island locations.

  • Structural steel fire protection ratings depend on member type and building separation; intumescent coating thickness is specified by tested fire-resistance rating, not by a generic thickness.

  • Foundations for vertical tanks resist hydrostatic and seismic sloshing loads; the tank shell-to-foundation interface and anchor chair details control the design.

  • Expansion joints and separation between canopy structures and buildings prevent load transfer during differential settlement and seismic drift.

  • Drainage grading around structures falls away from foundations and tank openings; ponding loads on canopies must be considered where drainage is blocked.

  • Corrosion protection for structural elements in wet or fuel-exposed zones follows a coating system selected for the exposure category, with galvanizing or protective coating at buried and splash zones.

Quick reference

Fuel Storage and Dispensing Systems

  • A tank is filled to no more than its defined fill limit; the fill level accounts for product expansion, and the overfill prevention device must stop delivery before the tank's safe capacity is exceeded.

  • Submersible pump discharge pressure plus product head determines dispenser inlet pressure; the pump bypass or relief setting must protect the piping from overpressure when all dispensers are closed.

  • Stage I vapor recovery routes displaced tank vapor back to the delivery tanker; Stage II captures vehicle tank vapor at the dispenser nozzle and returns it to the storage tank.

  • A shear valve at the dispenser base closes on impact or fire to isolate the pressurized line; it is installed at the base of the dispenser within the island, not at the submersible pump.

  • Spill containment at the fill point holds the volume that can drain from the delivery hose after disconnect; it is sized to the largest expected hose drainage, not to the tank volume.

  • Product piping slope and check valves prevent trapped product and cross-connection between products; line leak detection must be capable of detecting the regulated leak rate at operating pressure.

  • Flexible connector and secondary containment sump entries are tested for tightness after installation; sump entry fittings are the most common source of release into the interstitial space.

  • Dispenser hose and breakaway fittings are rated for the system pressure and product; the breakaway separates before the hose or fitting fails and must be replaced after actuation.

  • Tank inventory reconciliation compares metered dispensed volume plus physical inventory change against deliveries; unexplained loss beyond tolerance triggers leak investigation.

Quick reference

Electrical and Control Systems

  • Equipment in classified locations is selected by Class, Division or Zone, and material group; the area classification drawing defines the boundary, and the equipment listing must match the classification.

  • Intrinsically safe circuits require an approved barrier or isolator, and field wiring is installed per the control drawing, including maximum capacitance and inductance limits.

  • Conduit and fittings in hazardous locations are listed for the location and are installed with the required sealing fittings; seals are placed at the boundary where the conduit leaves the classified area.

  • Bonding and grounding connect the tank, piping, dispenser, and building grounding electrode system into a single low-impedance path; resistance to ground is measured and documented.

  • Motor branch circuits include overload protection, short-circuit protection, and disconnecting means; the disconnect is located within sight of the motor or is capable of being locked open.

  • Emergency stop and power shutdown circuits remove power from dispensers and pumps; the shutdown function must be independent of the point-of-sale controller.

  • Automatic tank gauging and leak detection systems require backup power or battery support so that alarm and shutdown functions remain available during a power loss.

  • Control wiring between the dispenser controller and the console is separated from power conductors or uses shielded cable to avoid induced noise and false signals.

  • Circuit identification, area classification boundaries, and warning signage are documented at the panel and at each classified boundary.

Quick reference

Fire Safety and Environmental Protection

  • Portable fire extinguishers are selected by hazard class and sized for the travel distance; the required rating and maximum travel distance are set by the occupancy and the applicable code.

  • Fixed suppression or dry chemical systems at dispensing islands are actuated by heat detection and discharge over the hazard; the design must cover the dispenser and the fueling area.

  • Spill and overfill prevention devices, secondary containment, and inventory control together form the release prevention program; each element must be independently functional.

  • Stormwater and runoff from fueling areas is routed through an oil-water separator or treatment before discharge; the separator is sized by the design flow rate.

  • Vapor recovery and vapor balance systems must be maintained and tested; a failed vapor line can cause excess emissions or pressure problems during delivery.

  • Emergency response planning identifies shutoff locations, alarm activation, evacuation routes, and notification contacts; the plan is exercised and updated.

  • Fire-rated separation between the fueling area and adjacent occupancies is maintained; openings in rated assemblies are protected with listed fire-rated closures.

  • Release detection records, monitoring well data, and alarm logs are retained per the regulatory schedule and are available for inspection.

  • Environmental sampling and reporting follow the applicable regulatory program; exceedances trigger notification within the required time frame.

Quick reference

Installation and Construction Practices

  • Tank excavation and bedding follow the manufacturer's instructions and the engineered design; backfill material and compaction are specified and verified before tank placement.

  • Tanks are anchored against buoyancy where groundwater can rise above the tank bottom; the anchor design considers the empty tank condition.

  • Piping is installed with the required slope toward the sump or dispenser, and joints are made per the listed method for the pipe material; solvent-cemented joints require proper cure time.

  • Secondary containment sumps are installed with watertight entry fittings, and the sump is tested before backfill or before being placed in service.

  • Conduit and wiring are installed before slabs and islands are finished; pull points and sealing fittings are located so the classified boundary seal is accessible.

  • Dispenser islands are set to final elevation and anchored; the dispenser base, shear valve, and flexible connector alignment are checked before piping is connected.

  • Commissioning includes tightness testing of tanks, lines, and sumps, verification of leak detection, and functional testing of shutdowns before product is introduced.

  • As-built drawings and equipment records are updated during construction; deviations from design are documented and approved before concealment.

  • Inspection hold points are defined before backfill, before slab placement, and before first fuel delivery; work is not concealed until the hold point is released.

Quick reference

Inspection, Testing and Maintenance

  • Tank and line tightness testing is performed at the regulated test pressure and duration; a passing test shows no loss beyond the threshold and no unexplained change in the test data.

  • Line leak detection is tested annually by simulating a leak or using the manufacturer's test procedure; the test verifies detection at the regulated leak rate.

  • Spill prevention equipment and overfill prevention devices are inspected at the required interval; overfill devices are checked for proper activation and drop tube condition.

  • Secondary containment sumps and interstitial spaces are tested for tightness at the required frequency; a failed sump test requires repair and retest before return to service.

  • Release detection equipment, including automatic tank gauging, is calibrated and functionally tested; alarm history is reviewed for patterns indicating a release.

  • Corrosion protection is evaluated by testing impressed-current systems and checking sacrificial anodes; the test confirms the structure remains cathodically protected.

  • Dispenser components, hoses, breakaways, and shear valves are inspected for damage and replaced when damaged or after actuation; inspection intervals follow the maintenance schedule.

  • Records of tests, inspections, repairs, and calibrations are retained and made available; missing records are treated as noncompliance during an inspection.

  • Walkthrough inspections check for spills, leaks, stained surfaces, odors, and damaged equipment; findings are logged and corrected within the required time.

Quick reference

Codes, Standards and Regulatory Compliance

  • The authority having jurisdiction adopts the applicable fire code and referenced standards; the edition in force determines the requirements that apply to a given site.

  • Flammable and combustible liquid storage is classified by flash point and boiling point; the class assignment drives tank, piping, and electrical requirements.

  • UST regulations set requirements for release detection, spill and overfill prevention, corrosion protection, and recordkeeping; new and existing systems have different compliance dates.

  • Operator training requirements assign responsibilities to Class A, B, and C operators; training is documented and records are maintained for each operator.

  • Financial responsibility requirements ensure that owners can pay for cleanup and third-party damages; the mechanism and coverage amount depend on the facility type.

  • Reporting obligations include release notification, corrective action, and closure; failure to notify within the required time is itself a violation.

  • Preconstruction notification and approval are required before installing or replacing tanks and piping; work started without notification may require removal.

  • Referenced standards define installation, testing, and inspection methods; compliance with the standard is demonstrated through records and third-party verification.

  • Closure of a tank system requires notification, product removal, cleaning, and assessment for contamination; the closure report documents the results.