PEI IMA Grade 9 study plan
PEI IMA Grade 9 · Give each week a clear focus.
8 weeks · About 6 hours per week
Fuel Storage and Dispensing Systems
Map the fuel storage and dispensing system from tank fill to dispenser nozzle, labeling every component and its safety function
Explain the difference between aboveground and underground storage tank requirements, including secondary containment and leak detection
Identify the key properties of gasoline, diesel, and alternative fuels that drive design and safety decisions (flash point, vapor pressure, conductivity)
Describe the purpose and operation of stage I and stage II vapor recovery systems
List the codes and standards that govern fuel storage and dispensing at the national and provincial level
Your checkpoint
One-page annotated system diagram plus a 15-row component/function/code-reference table
Fuel Storage and Dispensing Systems & Installation and Construction Practices
Sequence the installation of a typical underground tank and dispenser system from excavation to commissioning
Specify the inspection points that must be signed off before backfilling and before first fuel delivery
Explain how piping slope, sump design, and spill containment are verified during construction
Describe safe work practices for confined-space entry and hot work near fuel systems
Draft a pre-commissioning checklist for a new fuel dispensing installation
Your checkpoint
Installation sequence flowchart with hold points and a 20-item pre-commissioning checklist
Building and Structure Design
Classify building and structure types by occupancy and construction, and state how each classification affects design loads
Calculate basic dead, live, and environmental loads on a simple structural element using the governing load combinations
Explain the role of foundations, anchorage, and seismic detailing in structures that support fuel and electrical equipment
Identify fire-resistance ratings and separation requirements for structural elements and equipment rooms
Interpret a set of structural and architectural drawings to locate penetrations and supports
Your checkpoint
Worked load-calculation example for one structural element with code clause citations
Inspection, Testing and Maintenance
Build a testing matrix that matches each fuel, electrical, and fire-safety component to its required test method and acceptance criterion
Explain the difference between commissioning tests, periodic inspections, and maintenance activities
Describe how to document test results, non-conformances, and corrective actions in an inspection record
Outline a preventive maintenance schedule for dispensers, tanks, and leak-detection equipment
Practice interpreting a failed test result and deciding the required follow-up action
Your checkpoint
Completed testing and inspection matrix covering at least 15 components, with pass/fail criteria and maintenance intervals
Electrical and Control Systems
Trace the electrical power path from service entrance through panelboards to dispenser and control circuits
Explain hazardous (classified) location zones and how equipment selection and wiring methods change by zone
Describe grounding, bonding, and equipotential requirements for fuel dispensing equipment
Identify the control functions that must be interlocked for safe dispensing (emergency stop, leak detection, overfill protection)
Read and interpret a control system schematic and a hazardous area classification drawing
Your checkpoint
Annotated single-line electrical diagram plus a hazard-zone equipment selection table
Fire Safety and Environmental Protection
Select the correct portable fire extinguisher class and size for fuel, electrical, and ordinary combustibles
Explain spill prevention, containment, and response procedures for small and large fuel releases
Describe the environmental protection measures required for stormwater, vapor emissions, and soil and groundwater monitoring
Outline the elements of an emergency response plan for a fuel dispensing facility
Identify the reporting obligations that follow a release or a failed leak-detection test
Your checkpoint
One-page emergency response and spill containment plan with extinguisher and reporting tables
Codes, Standards and Regulatory Compliance & Building and Structure Design
Locate and cite the specific clauses in the applicable codes that govern tank installation, electrical classification, and fire separation
Explain the hierarchy between national codes, provincial regulations, and local bylaws when requirements conflict
Describe the permit, inspection, and approval process from design through occupancy
Apply code requirements to a building-and-structure design scenario and justify each decision with a citation
Identify common code-compliance gaps found during inspections and how to prevent them
Your checkpoint
Code citation index of at least 25 clauses mapped to specific exam domains and scenarios
Inspection, Testing and Maintenance & Fuel Storage and Dispensing Systems & Electrical and Control Systems & Fire Safety and Environmental Protection & Installation and Construction Practices & Building and Structure Design & Codes, Standards and Regulatory Compliance
Complete a full-length timed practice exam and score each domain separately
Review every missed question and write the underlying rule or code reference for each
Re-drill the two weakest domains with targeted exercises until scores improve
Summarize the ten highest-risk facts across all domains into a one-page quick-reference sheet
Confirm exam-day logistics, permitted references, and time allocation strategy
Your checkpoint
Scored practice exam with a written error log and a final one-page quick-reference sheet
Milestones
Week 2: Can explain the full fuel system from tank to nozzle and pass a self-quiz on installation hold points with at least 80% accuracy
Week 4: Testing and inspection matrix is complete and every component has a cited acceptance criterion
Week 6: Can classify a hazardous location, select the correct equipment, and state the required fire and environmental protection measures without notes
Week 8: Practice exam score is at least 75% overall with no domain below 65%