PEI IMA Grade 9 study materials
PEI IMA Grade 9 study resources

PEI IMA Grade 9: Fire Safety and Environmental Protection

PEI IMA Grade 9 · Work through your exam, one topic at a time.

All guide sections

Fire Safety and Environmental Protection

Fire Safety and Environmental Protection (Domain 4) tests the measures that prevent ignition and release, and the obligations once product escapes. It combines NFPA 30A fire rules with the EPA underground storage tank and SPCC framework, and questions often hinge on notification timelines and on the difference between containment and cleanup.

Fire prevention at the island

  • No smoking, engine off, no unapproved containers; signage at the island and at the entrance.
  • Portable extinguishers rated for the hazard, given a monthly visual check and annual service; the minimum rating and travel distance come from NFPA 30A and the approved site plan.
  • Emergency shutoffs at the dispensers and at a remote location reachable without approaching a fire.
  • Fire-rated separation between fueling areas and occupied spaces; hot work permits, bonding and a fire watch during tank or piping work.

Release prevention and response

  • Secondary containment and spill buckets catch small releases; interstitial monitoring and sump sensors catch what gets past them.
  • A suspected release is reported to the implementing agency within 24 hours and investigated within 7 days by tightness test or site check, under 40 CFR 280.61 and 280.52.
  • Contain, stop the source, absorb, and dispose as hazardous waste; never wash product into a storm drain.
  • SPCC plans apply to facilities above the aggregate aboveground oil storage threshold (generally 1,320 gal); buried tanks are not counted in that total. Secondary containment and inspection records support the plan.

Worked example

During a 30-day walkthrough, an inch of liquid smelling of gasoline is found in the STP sump. The sump is secondary containment, so this is not automatically a soil release, but the source is on the tank top or at the STP. Stop dispensing on that product, containerize and remove the liquid, check the sump sensor, inspect the tank-top fittings and pump, and start the clock: report within 24 hours if a release beyond the sump is suspected, investigate within 7 days.

Traps

  • Treating a sump holding product as routine condensation.
  • Missing the 24-hour reporting window or reporting to the wrong agency.
  • Counting buried tanks in the SPCC aggregate total.
  • Assuming annual extinguisher service covers the required monthly visual check.