CA Branch 1 study materials
CA Branch 1 study resources

CA Branch 1 study plan

CA Branch 1 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Water Sources, Quality, and Regulations & Coagulation, Flocculation, and Sedimentation

  • Map the regulatory framework for California public water systems: identify which contaminants carry primary versus secondary maximum contaminant levels and state the monitoring frequency and reporting trigger for each major group.

  • Build a one-page source-water profile template that records source type, intake location, watershed or aquifer vulnerability, and historical water quality trends, then fill it out for a hypothetical system.

  • Explain how raw water turbidity, alkalinity, pH, and temperature drive coagulant dose selection, and predict how a 5 NTU raw turbidity spike would shift alum demand.

  • Calculate a jar test dose series from a stock solution and describe how to interpret floc size, settling rate, and residual turbidity to pick an optimum dose.

  • Describe the settling velocity relationship behind sedimentation basin design and explain how surface overflow rate and weir loading affect particle capture.

Your checkpoint

A completed source-water profile plus a worked jar-test dose calculation sheet showing stock solution preparation, dose series, and a written optimum-dose justification.

Week 2

Coagulation, Flocculation, and Sedimentation & Filtration

  • Diagram the full coagulation-flocculation-sedimentation-filtration train and label the process control points, chemical feed points, and sampling locations at each stage.

  • Calculate coagulant and polymer feed rates in mg/L and lb/day from flow, dose, and solution strength, and verify each result with a unit-cancellation check.

  • Compare rapid sand, dual-media, and membrane filtration on loading rate, backwash strategy, and turbidity removal capability, and state which is most sensitive to coagulant carryover.

  • Interpret a filter run: identify the onset of turbidity breakthrough versus terminal headloss and explain the operational decision at each point.

  • Explain the filter-to-waste, backwash, and ripening sequence and the risk of passing filtered water before the filter has stabilized.

Your checkpoint

A labeled treatment train diagram with chemical feed and sampling points, plus five solved dose and loading-rate problems with unit checks shown.

Week 3

Disinfection and Disinfection Byproducts & Corrosion Control and Water Quality Stability

  • Compare chlorine, chloramine, ozone, chlorine dioxide, and UV on disinfection strength, residual persistence, and regulated byproduct formation, and match each to a plausible system size and source quality.

  • Calculate CT required versus CT achieved for a given disinfectant, temperature, pH, and contactor configuration, and determine whether the system meets its required log inactivation.

  • Explain the Stage 1 and Stage 2 Disinfectants and Disinfection Byproducts rules and the four major regulated byproduct groups, and describe how precursor removal and operational changes reduce them.

  • Describe how pH, alkalinity, calcium hardness, and temperature combine into a corrosion index, and explain what a negative index signals about the water's tendency toward metal or concrete attack.

  • Select a corrosion control strategy for a system switching from groundwater to a blended source and justify the choice with water quality chemistry.

Your checkpoint

A CT compliance worksheet for one disinfection scenario showing required CT, achieved CT, and pass or fail with the corrective action stated, plus a written corrosion-control recommendation memo.

Week 4

Pumps, Motors, and Process Instrumentation & Laboratory Analysis, Sampling, and Process Control Calculations

  • Match pump types to duty: explain when a centrifugal, positive-displacement, or submersible pump is appropriate and describe cavitation symptoms, causes, and prevention.

  • Read a pump curve against a system curve and identify the operating point, then predict how throttling or a demand increase moves that point.

  • Calculate motor horsepower, wire-to-water efficiency, and head from flow and pressure, and explain affinity laws for flow, head, and power.

  • Describe calibration procedure and frequency for turbidity, pH, chlorine residual, and flow meters, and explain what happens to compliance data when an instrument drifts out of calibration.

  • Apply the jar test, chlorine demand, and CT concepts from earlier weeks to a process control decision using current instrument readings.

Your checkpoint

A pump and instrumentation problem set with ten solved calculations (head, horsepower, efficiency, calibration adjustment) and a one-page calibration schedule naming each instrument, method, and interval.

Week 5

Laboratory Analysis, Sampling, and Process Control Calculations & Safety, Emergency Response, and Security

  • Perform the core process control calculations from memory: detention time, hydraulic loading rate, filter loading rate, chemical dose, and log removal, and state the unit for each result.

  • Design a sampling plan that satisfies monitoring requirements for a small system, specifying site, frequency, container, preservation, and holding time for each analyte group.

  • Explain chain-of-custody, quality control samples, and the consequences of an invalid sample on a compliance determination.

  • Build a hazard review of a treatment plant covering chlorine gas or hypochlorite handling, confined space entry, electrical work, and chemical mixing, and name the control for each.

  • Draft a response sequence for a loss of pressure or a confirmed contamination event, including notification triggers, isolation steps, and public notice timing.

Your checkpoint

A sampling and monitoring plan for one system plus a written emergency response sequence for a loss-of-pressure event with notification timeline and responsible roles.

Week 6

Records, Reporting, and Operator Certification Responsibilities & Distribution System Interface and Finished Water Storage

  • Identify the records a certified operator must maintain and the retention periods and reporting deadlines that apply to compliance samples, operational logs, and consumer confidence reports.

  • Explain operator certification grade, renewal, and continuing education obligations and describe the ethical duty to report accurate data even when results are unfavorable.

  • Describe how treatment process changes propagate into the distribution system: residual decay, nitrification risk in chloraminated systems, and storage tank turnover.

  • Calculate storage volume, turnover time, and finished water demand from tank dimensions and system flow, and identify stagnation risk from the result.

  • Explain how disinfectant residual, pressure, and storage operations at the treatment-distribution interface affect compliance at the farthest sampling point.

Your checkpoint

A records and reporting calendar for one calendar year listing each required submittal with its due date, plus a storage turnover calculation with a stagnation-risk assessment.

Week 7

Water Sources, Quality, and Regulations & Coagulation, Flocculation, and Sedimentation & Filtration & Disinfection and Disinfection Byproducts

  • Re-solve one representative calculation from each of the four heavy domains without notes and score accuracy against the worked solution.

  • Rewrite from memory the regulatory limits, monitoring frequencies, and reporting triggers for turbidity, disinfection residual, and the major byproduct groups.

  • Diagnose five operational scenarios (rising filtered turbidity, falling residual, climbing byproduct results, poor floc formation) and state the most likely cause and first corrective action.

  • Explain the linkage between coagulation performance and downstream disinfection byproduct formation in a single coherent narrative.

Your checkpoint

A timed 40-question self-assessment across the four heavy domains with a scored answer key and a written list of every missed concept ranked by weakness.

Week 8

Corrosion Control and Water Quality Stability & Pumps, Motors, and Process Instrumentation & Laboratory Analysis, Sampling, and Process Control Calculations & Safety, Emergency Response, and Security & Records, Reporting, and Operator Certification Responsibilities & Distribution System Interface and Finished Water Storage

  • Review the corrosion, pump, instrumentation, laboratory, safety, records, and distribution material and close every gap flagged in the week 7 assessment.

  • Practice ten mixed calculation problems spanning dose, CT, detention time, horsepower, and storage turnover under time pressure.

  • Rehearse the emergency response sequences for loss of pressure, chemical spill, and security breach aloud until the steps are recalled without notes.

  • Complete two full-length practice exams and compare domain-level scores to identify any remaining weak area.

Your checkpoint

Two completed full-length practice exams with domain score breakdowns and a final one-page weak-area sheet listing only the concepts still needing review before exam day.

Milestones

Week 2: Can draw the full treatment train from memory and correctly solve a coagulant dose problem in mg/L and lb/day with units shown.

Week 4: Can calculate required versus achieved CT for a given disinfectant scenario and state pass or fail with justification, and can read a pump operating point from a curve.

Week 6: Can list the compliance reporting deadlines for a full calendar year and calculate storage turnover time from tank dimensions and system demand.

Week 8: Scores at or above 80 percent on two full-length practice exams with no domain below 70 percent, and can recite all three emergency response sequences without notes.