Power Eng 2nd Class study materials
Power Eng 2nd Class study resources

Power Eng 2nd Class cheat sheet

Power Eng 2nd Class · Keep the key ideas within reach.

Quick reference

Applied Thermodynamics and Heat Transfer

  • Sensible heat: Q = m·c_p·ΔT; latent heat: Q = m·h_fg. Steam tables give h_fg = h_g − h_f at the saturation pressure.

  • Steam quality x = (h − h_f)/h_fg; for a throttling calorimeter, x = (h_2 − h_f1)/h_fg1 where state 2 is the superheated sample.

  • Rankine cycle efficiency = (h_1 − h_2) − (h_4 − h_3) divided by (h_1 − h_4), where 1 is turbine inlet, 2 turbine exhaust, 3 pump inlet, 4 pump discharge.

  • Conduction: q = kA·ΔT/L; cylindrical wall resistance R = ln(r_o/r_i)/(2πkL). Convection: q = hA·ΔT.

  • LMTD = (ΔT_1 − ΔT_2)/ln(ΔT_1/ΔT_2); counterflow is always equal to or better than parallel flow for the same terminal temperatures.

  • Overall heat transfer coefficient 1/U = 1/h_i + R_fouling,i + t/k + R_fouling,o + 1/h_o, referred to the same area.

  • Nozzle/steam flow: velocity increases and pressure falls in a converging-diverging nozzle once flow is choked at the throat (M = 1).

  • Second law: no cyclic device can convert all heat to work; Carnot efficiency = 1 − T_L/T_H with absolute temperatures.

  • Heat balance check: heat in (fuel × HHV + air enthalpy) minus stack loss, radiation loss, and blowdown loss equals useful steam output.

Quick reference

Mechanical Equipment and Components (Pumps, Compressors, Turbines, Engines)

  • Centrifugal pump affinity laws: Q ∝ N, H ∝ N², P ∝ N³; for impeller trim, Q ∝ D, H ∝ D², P ∝ D³.

  • NPSH available = (p_suction − p_vapor)/(ρg) + static head − friction losses; cavitation occurs when NPSH_a falls below NPSH_r.

  • Pump operating point is the intersection of the pump curve and the system curve; throttling moves the system curve, VFD changes the pump curve.

  • Reciprocating compressor volumetric efficiency drops with high clearance volume, high compression ratio, and low suction temperature.

  • Compressor clearance volumetric efficiency ≈ 1 + C − C·(P_discharge/P_suction)^(1/n).

  • Steam turbine stage efficiency = actual enthalpy drop / isentropic enthalpy drop; use the Mollier chart between inlet and exhaust conditions.

  • Critical speed is the shaft speed where operating speed equals a natural frequency; run through it quickly and avoid continuous operation near it.

  • Diesel engine indicated power = P_mep × L × A × N × cylinders, with N in power strokes per second; mechanical efficiency = brake/indicated.

  • Governor droop = (no-load speed − full-load speed)/full-load speed × 100; isochronous governors have zero droop.

Quick reference

High-Pressure Boilers and Combustion Systems

  • Theoretical air is the stoichiometric air for complete combustion; excess air = (actual air − theoretical air)/theoretical air × 100.

  • Flue gas CO₂ falls and O₂ rises as excess air increases; optimum excess air is the point where stack loss plus unburned loss is minimum.

  • Combustion air requirement: for a fuel with mass fractions C, H, S, O, air mass = 11.5C + 34.5(H − O/8) + 4.32S kg air per kg fuel (approx.).

  • Drum level shrink and swell occur on load increase and decrease respectively; low-water trip is a mandatory boiler safeguard.

  • Safety valve capacity must equal or exceed maximum boiler steaming capacity; set pressure is at or below design pressure.

  • Three-element feedwater control uses drum level, steam flow, and feedwater flow; it corrects level before the swell/swell transient misleads a single-element controller.

  • Boiler efficiency by the indirect method = 100 − (dry flue gas loss + moisture loss + unburned carbon + radiation + blowdown losses).

  • Furnace purge: prove airflow for the manufacturer's specified time before ignition, and prove flame by scanner before admitting fuel.

Quick reference

Instrumentation, Controls, and Safety Devices

  • 4–20 mA transmitter: measured span maps to 4 mA at zero and 20 mA at full scale; live zero allows open-circuit detection.

  • Control modes: proportional output = K_p·error; integral removes offset; derivative anticipates rate of change and amplifies noise.

  • PID tuning rules: Ziegler-Nichols ultimate gain method uses K_u and P_u; PID settings are K_p = 0.6K_u, T_i = P_u/2, T_d = P_u/8.

  • A control valve fails closed, open, or last position depending on actuator/spring arrangement; select fail-safe direction to match process hazard.

  • Three-way valve: mixing valve has two inlets and one outlet; diverting valve has one inlet and two outlets.

  • RTD resistance rises with temperature; thermocouple output is a small millivolt EMF and requires cold-junction compensation.

  • Interlocks must be proof-tested at defined intervals; a bypassed trip must be logged, time-limited, and approved by the responsible authority.

  • Flame scanner must discriminate between burner flame and hot refractory; a flame-out trip closes the fuel valve within the proven response time.

Quick reference

Electrical Systems and Motors

  • Three-phase power P = √3 × V_L × I_L × power factor for a balanced load; single-phase P = V × I × PF.

  • Synchronous speed N_s = 120f/P; induction motor slip = (N_s − N)/N_s and rises with load.

  • Motor full-load current is taken from the nameplate; conductor and overload sizing uses the applicable code percentage of FLC.

  • Star-delta starting reduces starting current and torque to one third of the direct-on-line values.

  • A VFD controls motor speed by varying frequency and voltage; below base speed it maintains constant V/f ratio to hold flux.

  • Motor protection: overload relay protects against sustained overcurrent, while short-circuit protection is provided by fuses or a circuit breaker.

  • Insulation resistance testing uses a megohmmeter; a falling trend across periodic tests is more meaningful than a single reading.

  • Lockout/tagout must isolate and prove de-energized every energy source, including control circuits and stored energy such as capacitors.

Quick reference

Water Treatment, Corrosion, and Chemistry

  • pH scale: below 7 acidic, above 7 alkaline; boiler water is held alkaline to protect steel, typically with coordinated phosphate/pH control.

  • Conductivity is used to estimate dissolved solids; blowdown rate is set to hold boiler water TDS within the manufacturer's limit.

  • Scale-forming ions (Ca, Mg) are removed by softening (ion exchange) or demineralization; hardness is expressed as mg/L as CaCO₃.

  • Oxygen pitting is controlled by mechanical deaeration plus chemical oxygen scavenger; the scavenger residual is measured and held in the specified range.

  • Caustic embrittlement (stress corrosion cracking) is avoided by maintaining a protective phosphate-to-alkalinity ratio and avoiding concentrated caustic in crevices.

  • Corrosion rate is often expressed in mils per year (mpy); 1 mpy equals 0.001 inch per year of metal loss.

  • Condensate return corrosion is usually caused by carbonic acid from CO₂; neutralizing amines or filming amines are used to control it.

  • Silica carryover into steam is limited by boiler pressure and steam purity; high-purity steam requires low silica and low carryover.

Quick reference

Refrigeration, Air Conditioning, and Compressed Air

  • Refrigeration capacity: 1 ton = 12,000 Btu/h = 200 Btu/min = 3.517 kW.

  • Coefficient of performance, COP = refrigeration effect / work input; for a Carnot refrigerator COP = T_L/(T_H − T_L) with absolute temperatures.

  • Vapor-compression cycle: evaporation at low pressure absorbs heat; the compressor raises pressure and temperature; the condenser rejects heat.

  • Superheat at the evaporator outlet protects the compressor from liquid slugging; subcooling at the condenser outlet increases refrigeration effect.

  • High discharge pressure causes: high condensing temperature, fouled condenser, non-condensable gases, or overcharge.

  • Compressed air: free air delivery is measured at standard intake conditions; pressure drop in piping wastes energy because compressor power rises with discharge pressure.

  • Air dryer dew point must be below the lowest ambient temperature of the piping to prevent condensate; refrigerated dryers give about 2–10 °C dew point.

  • Psychrometrics: relative humidity = partial pressure of water vapor / saturation pressure at the same dry-bulb temperature.

Quick reference

Plant Operations, Maintenance, and Troubleshooting

  • Root cause analysis tools: 5 Whys, fishbone (Ishikawa), and fault tree; the goal is the underlying cause, not the immediate symptom.

  • Vibration analysis: imbalance shows 1× running speed; misalignment shows 2× and axial 1×; bearing defects show high-frequency impacts.

  • Preventive maintenance is calendar/usage based; predictive maintenance is condition based (vibration, thermography, oil analysis, ultrasound).

  • Oil analysis reports wear metals, water content, viscosity, and particle count; rising iron with stable viscosity suggests wear, not contamination.

  • A pump that loses discharge pressure with rising vibration should be checked for cavitation, air ingress, and a closed suction valve before overhaul.

  • Alignment: dial indicator or laser alignment to the manufacturer's tolerance; thermal growth must be compensated when the machine is at operating temperature.

  • Permit-to-work systems require isolation, gas testing, and a signed handover before hot work or confined-space entry.

  • Trending is the primary diagnostic tool: compare current readings against baseline and alarm limits rather than judging a single value.

Quick reference

Codes, Standards, and Regulatory Compliance

  • Boiler and pressure vessel rules are typically enforced by the jurisdiction adopting a recognized code; the owner must know which edition is in force.

  • Periodic inspection intervals for boilers and pressure vessels are set by the jurisdiction and by the insurer; certificates must be current.

  • Safety valve set pressure, capacity, and testing records must be retained and traceable to the equipment file.

  • Relief valve discharge piping must be sized so that back pressure does not reduce valve capacity below the required flow.

  • Environmental permits define emission limits, monitoring methods, and reporting deadlines; exceedances require notification within the permitted time.

  • Refrigerant handling is regulated; technicians must hold the required certification and record recovery, leak checks, and disposal.

  • Confined-space entry requires atmospheric testing for oxygen, flammables, and toxics before entry and continuously during occupancy.

  • Management-of-change procedure: any alteration to equipment, process, or setpoints must be reviewed and approved before implementation.

Quick reference

Safety, Environmental Protection, and Emergency Response

  • Atmospheric hazards in confined spaces: oxygen below 19.5% or above 23.5%, flammable gas above 10% LEL, and toxic gas above exposure limit require entry prohibition.

  • Flash point is the lowest temperature at which a liquid gives off enough vapor to ignite; it is not the ignition temperature.

  • Flammable range is bounded by the lower and upper explosive limits (LEL/UEL); inerting or ventilation keeps the concentration outside that range.

  • Emergency shutdown sequence: trip fuel, isolate steam, maintain feedwater to protect the boiler, and alarm/evacuate per the site plan.

  • Spill response: stop the source, contain with booms or absorbent, notify per the plan, and prevent entry to drains and waterways.

  • Personal protective equipment is the last line of defense; engineering controls and administrative controls rank higher in the hierarchy of controls.

  • Fire classes: A ordinary combustibles, B flammable liquids, C electrical, D metals; the extinguishing agent must match the class.

  • Incident investigation: preserve the scene, record facts, interview witnesses separately, and report to the regulator within the required time.

Quick reference

Supervision, Administration, and Plant Management

  • Shift handover must record equipment status, open permits, abnormal conditions, and outstanding work orders; both parties sign.

  • Competency records for each operator must show training, authorization, and date; unqualified staff may not operate independently.

  • Key performance indicators for a plant include availability, heat rate, forced outage rate, and maintenance backlog.

  • Work order prioritization: safety-critical first, then production-critical, then planned maintenance; deferral requires documented risk acceptance.

  • Budget variance analysis compares actual against budget by cost center; labor, fuel, chemicals, and maintenance are typical line items.

  • Regulatory reporting calendar tracks inspection dates, emission reports, and certification renewals with assigned owners.

  • Effective toolbox talk covers the specific task hazard, the controls in place, and the stop-work authority of every worker.

  • Succession and cross-training plans reduce single-point dependency; each critical role should have a named backup.