Trench Entry Beside an Active Sidewalk

Red Seal CCW · Put your knowledge to work in context.

All case studies

Trench Entry Beside an Active Sidewalk

A crew is excavating an 18 m long, 0.9 m wide service trench to a specified invert depth of 2.4 m in firm clay with sand seams. Locate marks show a 200 mm water main crossing at about 1.5 m depth. The trench runs parallel to a public sidewalk, with only 0.8 m between the trench edge and the sidewalk. Spoil is piled 0.6 m back from the opposite edge, and groundwater is seeping from one wall. A 2.4 m steel trench box is on site, but one of its four spreader pins is missing. The foreman wants two workers to enter and hand-dig around the water main before the end of the shift. Pedestrians are still using the sidewalk, and there is no ladder in the trench. The utility locate ticket expires tomorrow.

1. What must be in place before either worker enters the trench? Explain the reasoning behind each control.

Read the worked answer

Stop entry. A 2.4 m trench is a high-hazard excavation, and the controls must answer four questions: will the walls stay up, can the workers get out, will they be struck by something, and will they be overcome by an atmosphere?

  • Support and soil: A competent person must classify the soil and inspect the trench. Firm clay with sand seams and seepage is not a reason to assume it will stand. The sidewalk is within the zone of influence, so the excavation cannot be sloped or benched as if it were open ground; the support system must be designed for the sidewalk surcharge, the water main, and the seepage.
  • Trench box: The box is not usable with a missing spreader pin. It must be assembled per the manufacturer, have all pins and connections, be rated for the depth, and be placed so workers are inside it and not working below its bottom edge. It also must not be used to support the sidewalk or spoil.
  • Access: A ladder within 3 m of each worker and extending above grade, or another approved means, is required before entry.
  • Utilities: The locate ticket must be valid; treat the water main as live until proven otherwise.
  • Atmosphere and water: Test for oxygen, flammable gas, and toxic gas where a confined-space hazard may exist; control the seepage so the bottom is stable and workers are not standing in water.
  • Surface controls: Barricade the sidewalk and trench, keep spoil and equipment at least 1 m back, and have a rescue plan and a spotter.

2. How should the water main be exposed, and what makes the available trench box unsuitable as it sits?

Read the worked answer

Expose the water main by hand digging or vacuum excavation within the utility's tolerance zone, using a blunt tool and a spotter; do not use a mechanical excavator bucket near the main. The purpose is to see the utility before placing the box or support. The trench box is unsuitable as it sits for three reasons: it is missing a spreader pin, so its structural capacity is unknown; a 2.4 m box cannot protect a 2.4 m deep trench if the excavation is deeper than the box bottom or if the box is not rated for the surcharge and soil; and the water main crossing may prevent the box from being set evenly. Replace the pin, verify the certification and depth rating, and get a support layout that accounts for the crossing. If the box cannot be placed without exposing workers, use an engineered shoring system or shore the utility crossing first.

3. The foreman proposes to leave the sidewalk open and skip barricades because the work is 'only for a few hours.' What do you do, and what do you document?

Read the worked answer

Refuse to leave the sidewalk open. Pedestrians are members of the public and are not protected by the workers' PPE; a 2.4 m open trench beside a 0.8 m walkway is a fall and struck-by hazard. The response is to stop work, install hard barricades and signage, close or detour the sidewalk with an accessible pedestrian route, and keep the trench covered or guarded when unattended. Notify the supervisor in writing, record the condition with photos, and note the stop-work in the daily log. If the foreman insists, escalate to the site safety officer or general contractor; a verbal 'few hours' does not override the hazard. Document the instruction, the refusal, and the corrective action so there is a record if an incident occurs.