Red Seal CCW study materials
Red Seal CCW study resources

Red Seal CCW study plan

Red Seal CCW · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Occupational Health and Safety, and Environmental Protection & Excavation, Trenching, and Shoring

  • List the hierarchy of hazard controls and match at least 10 construction-site hazards to the correct control level

  • Identify the sections of the occupational health and safety regulation that govern excavations, and state the minimum shoring and sloping requirements for a 2.4 m deep trench in your jurisdiction

  • Explain confined-space entry procedures, atmospheric testing order, and rescue requirements well enough to teach them to a co-worker

  • Describe the emergency response sequence for a utility strike, including gas, electrical, and water line contacts

Your checkpoint

A one-page hazard-and-controls reference sheet for trenching and confined-space work, with at least 10 hazards mapped to controls and the applicable regulatory limits cited

Week 2

Occupational Health and Safety, and Environmental Protection & Excavation, Trenching, and Shoring

  • Calculate soil types by visual and manual tests and select the correct slope ratio for each

  • Size and lay out shoring, shielding, and trench-box systems for a given trench depth and width

  • Sequence the steps for locating and hand-exposing underground utilities before digging

  • Draft the inspection and monitoring routine for an open excavation, including spoil-pile setback and access/egress spacing

Your checkpoint

A written trench-safety plan for a sample 3 m deep, 15 m long utility trench, covering soil classification, protective system choice, access, and inspection frequency

Week 3

Concrete and Formwork Support & Site Preparation, Layout, and Surveying Support

  • Interpret a set of formwork drawings and identify dimensions, elevations, and embedded items

  • Set up and check batter boards and string lines to establish building corners square within tolerance

  • Select and inspect formwork materials, release agents, and tie systems for a wall pour

  • Describe the curing and stripping timeline for typical foundation and wall formwork

Your checkpoint

A layout sketch and formwork takeoff for a simple rectangular foundation, with corner-square checks shown and a materials list

Week 4

Concrete and Formwork Support & Carpentry and Structural Support

  • Build or simulate a small wall form with bracing and verify plumb and alignment

  • Explain the load path in light-frame construction from roof to foundation

  • Identify the correct fasteners, connectors, and hangers for common framing connections

  • Describe how to check level, plumb, and square on a framed wall assembly

Your checkpoint

A framing-and-formwork connection diagram set showing at least six connections with the correct hardware named, plus a self-check of plumb and square on a practice assembly

Week 5

Materials Handling, Rigging, and Hoisting & Tools, Equipment, and Maintenance

  • Determine load weight and centre of gravity for at least three sample loads and select slings accordingly

  • Identify sling types, inspection rejection criteria, and the correct hitch for given loads

  • Demonstrate the standard hand signals and describe pre-lift planning and lift-zone control

  • Set up a preventive maintenance schedule for the hand and power tools most used on site

Your checkpoint

A rigging plan for a sample lift, including load weight calculation, sling selection, hitch type, and a pre-lift checklist, plus a one-page tool maintenance log template

Week 6

Masonry and Bricklaying Support & Demolition, Renovation, and Site Cleanup

  • Prepare mortar to a specified mix ratio and describe the effect of water content on workability

  • Lay out a running bond and a corner lead for a small practice wall

  • Sequence a demolition or renovation job from survey through debris removal, including hazardous-material screening

  • Explain salvage, separation, and disposal requirements for common demolition waste streams

Your checkpoint

A short renovation scope sheet listing the demolition sequence, hazardous-material checks, and waste-separation plan for a sample interior strip-out

Week 7

Carpentry and Structural Support & Documentation, Communication, and Professional Practice

  • Read a set of working drawings and extract the information needed for a small framing task

  • Write a clear daily report and a short tool-box talk on a safety topic

  • Describe the chain of communication for a field change or a safety concern

  • Explain the professional and legal responsibilities of a construction craft worker on site

Your checkpoint

A complete daily field report and a one-page tool-box talk script, both written from a sample site scenario

Week 8

Occupational Health and Safety, and Environmental Protection & Excavation, Trenching, and Shoring & Concrete and Formwork Support & Materials Handling, Rigging, and Hoisting

  • Complete a timed mixed practice set covering the four heaviest domains and review every wrong answer

  • Re-state the key regulatory limits and safety procedures from memory without notes

  • Work through at least two scenario questions per heavy domain and justify each answer

  • Identify remaining weak areas and write a short review list for each

Your checkpoint

A scored practice test with a written error log showing every missed question, the correct reasoning, and a targeted review plan for the final days

Milestones

Week 2: Can explain trench protective-system selection and confined-space entry from memory, and score at least 75% on a self-made safety quiz

Week 4: Can lay out a square building corner and describe a formwork build sequence without referring to notes

Week 6: Can calculate a load weight, select a sling, and name the standard hand signals, and can sequence a renovation strip-out

Week 8: Scores at least 80% on the mixed practice set and has an error log with a review plan for every weak area