Red Seal CCW cheat sheet
Red Seal CCW · Keep the key ideas within reach.
Occupational Health and Safety
Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.
Four classes of fall protection: guardrails, personal fall-arrest systems, safety nets, and travel-restraint systems; fall arrest requires a rescue plan before work starts.
Fall-arrest anchor strength: 22 kN (5,000 lbf) per worker for engineered anchors; free-fall distance kept under 1.8 m (6 ft) where practicable.
Respirable crystalline silica: workplace exposure limit commonly 0.025 mg/m3 (8-hour TWA) in Ontario; wet cutting and local exhaust ventilation are primary controls.
Confined-space entry requires a hazard assessment, entry permit, atmospheric testing (oxygen 19.5-23%), attendant, and rescue provisions before entry.
Hazardous energy control (lockout/tagout): isolate, lock, tag, verify zero energy by test, and confirm stored energy is released before work.
Noise: hearing protection required at 85 dBA Lex 8-hour; exposure limit 85 dBA in most Canadian jurisdictions; double protection above 105 dBA.
WHMIS 2016: pictograms, supplier labels, and safety data sheets with 16 sections; worker training required before handling a controlled product.
Incident reporting: report serious injuries and critical injuries to the regulator immediately; preserve the scene unless rescue or safety requires changes.
Environmental Protection
Erosion and sediment controls: silt fence, straw bale barriers, sediment traps, and check dams installed before grading; inspect after every rain event.
Silt fence placement: on the contour, keyed into the ground, with the fabric on the uphill side; not used in concentrated flow channels.
Spill response sequence: stop the source, contain with absorbent or berm, protect drains and watercourses, notify, and dispose of waste per regulation.
Designated substances and asbestos: suspect materials tested before disturbance; asbestos work follows jurisdiction-specific licensing and notification rules.
Waste segregation: separate clean fill, recyclable metals, wood, gypsum, and hazardous waste (paints, solvents, fuels) to meet diversion requirements.
Fuel storage: secondary containment sized to at least 110% of the largest container; drip trays under refuelling points.
Dust suppression: water carts or applied water on unpaved haul roads; visible dust from a site boundary is a common compliance trigger.
Protected trees: establish a tree protection zone at the drip line or per arborist plan; no storage, parking, or excavation inside it.
Site Preparation, Layout, and Surveying Support
Benchmark (BM) is a fixed elevation reference; a temporary benchmark (TBM) is established on site and tied to the BM.
Differential levelling: HI = backsight reading + known elevation; unknown elevation = HI minus foresight reading. Arithmetic check: sum BS - sum FS = last RL - first RL.
3-4-5 method: a triangle with sides 3, 4, and 5 units has a 90-degree angle between the 3 and 4 sides; scale to 6-8-10 or 9-12-15 for larger layouts.
Building layout: set batter boards beyond excavation limits, stretch string lines, and transfer corners with a plumb bob or laser; confirm diagonals are equal for squareness.
Slope expressed as percent grade = (rise / run) x 100; a 2% slope drops 0.02 m per 1 m of horizontal run.
Station and offset notation: station is distance along a baseline, offset is perpendicular distance left or right; used to set utilities and structures.
Total station setup: occupy a known point, backsight a second known point, then check a third known point to verify angular closure before staking.
Site stripping: topsoil removed to a defined depth and stockpiled separately for later reuse in landscaping and restoration.
Excavation, Trenching, and Shoring
Trench definition: depth greater than width, and width at the bottom 2 m (6 ft) or less; deeper than 1.2 m (4 ft) requires a protective system in most Canadian jurisdictions.
Soil types: Type 1 (hard, stable), Type 2 (stiff, cohesive), Type 3 (soft, disturbed), Type 4 (running, submerged); each type sets maximum slope angles and shoring requirements.
Sloping for protection: Type 1 about 3/4:1, Type 2 about 1:1, Type 3 about 1.5:1, Type 4 requires engineering; verify against the local regulation table.
Spoil and equipment kept back at least 1 m (3 ft) from the trench edge; ladders within 7.5 m (25 ft) of travel for worker access and egress.
Locate buried utilities before digging by calling the provincial one-call service and hand exposing within the tolerance zone; never machine dig near marked lines.
Daily and post-rain inspection by a competent person: check for tension cracks, sloughing, water accumulation, and spoil loading at the crest.
Trench boxes: installed so the top is above grade and the bottom is within 0.6 m (2 ft) of the trench bottom; workers stay inside the box during hoisting.
Atmospheric testing before entry: oxygen 19.5-23%, combustible gas below 10% LEL, and toxic gases below exposure limits; continue monitoring while occupied.
Concrete and Formwork Support
Concrete mix ratio by volume for general work: 1 part cement, 2 parts sand, 3 parts coarse aggregate; water-cement ratio controls strength and durability.
Formwork design loads: concrete weight about 24 kN/m3 (150 lb/ft3), plus live load, impact, and lateral pressure from fresh concrete.
Formwork removal: sides of non-load-bearing forms after concrete is hard enough not to be damaged; soffits and props only after the specified strength is reached (commonly 70% of design strength for slabs).
Slump test measures workability; typical structural range 75-125 mm; test per CSA A23.2 on a sample from the middle of the load.
Curing: keep concrete moist and above 5 degrees C for at least 7 days (Type 1 cement) or per specification; cold weather requires insulation and temperature records.
Formwork ties and bracing: snap ties rated for the lateral pressure; vertical and diagonal bracing to resist wind and placement forces.
Control joints are sawn or formed to a depth of about 1/4 slab thickness to control random cracking; spacing typically 24-36 times slab thickness.
Concrete placement: free fall limited to about 1.5 m (5 ft) to prevent segregation; vibrate systematically without over-vibration.
Masonry and Bricklaying Support
Mortar types: M (high strength, 2500 psi), S (medium-high, 1800 psi), N (general purpose, 750 psi), O (low strength, 350 psi); S or N common for exterior load-bearing walls.
Standard modular brick: 90 mm x 57 mm x 190 mm face dimensions with 10 mm mortar joints; nominal module 200 mm x 67 mm x 200 mm.
Running bond: each course offset half a brick; common bond has header courses every fifth or sixth course; English bond alternates stretcher and header courses.
Wall ties: corrosion-resistant ties spaced at 600 mm horizontally and 400 mm vertically for cavity walls, with one tie per 0.25 m2 of wall area.
Flashing and weepholes: weepholes spaced at 800 mm (32 in) maximum and at 600 mm (24 in) near lintels; flashing lapped and terminated with a drip edge.
Lintel bearing: typically 100 mm (4 in) minimum bearing each side for masonry lintels; verify with the structural design.
Masonry grout: slump 200-275 mm for reinforced hollow block; consolidation by puddling or mechanical vibration to fill voids.
Scaffold for masonry: working platform width at least 500 mm (20 in), fully planked, with guardrails at 1 m and 2 m and toe boards.
Carpentry and Structural Support
Nominal to actual lumber: 2x4 is 38 x 89 mm, 2x6 is 38 x 140 mm, 2x10 is 38 x 235 mm; dressed dimensions govern spans and loads.
Floor joist spans are tabulated by species, grade, size, spacing, and live load; never overspan without checking the span table or engineer.
Bearing and notching: a notch in the top of a joist limited to 1/4 depth at the ends and 1/6 depth in the middle third; holes kept to the middle third of depth.
Stud spacing: 400 mm (16 in) or 600 mm (24 in) on centre; load-bearing walls require a double top plate and full bearing under headers.
Header sizing: opening width plus 75 mm (3 in) bearing each side; header depth increases with span and load; jack and king studs flank the opening.
Roof pitch = rise / run; a 4/12 pitch rises 4 units per 12 units of run, giving an angle of about 18.4 degrees.
Rafter length = run / cos(pitch angle); multiply the run by the pitch factor for the common rafter length.
Truss installation: follow the truss layout drawing, brace per the truss designer, and never cut or notch truss members without engineering approval.
Sheathing fastening: panel edges supported and nailed at 150 mm (6 in) on centre, field nails at 300 mm (12 in) on centre for subfloor, per the schedule.
Materials Handling, Rigging, and Hoisting
Sling angle effect: tension = load / (number of legs x sin of the angle to horizontal); at 30 degrees, each leg carries the full load, at 60 degrees about 0.58 of the load.
Load centre of gravity must be below the hook for a stable lift; tag lines control rotation and are never wrapped around hands or body.
Rigging inspection: remove slings with broken wires, kinks, cuts, or missing tags; wire rope removal criteria include 10 randomly distributed broken wires in one lay.
Rated capacity of a sling is reduced by the splice, hardware, and configuration; never exceed the manufacturer's tag rating.
Crane hand signals: standardized signals used by a designated signaller; stop signal is one arm extended palm down, moving arm side to side.
Outrigger setup: fully extended on stable bearing pads; verify ground bearing capacity and keep clear of excavations and underground services.
Rigging hardware: shackles, hooks, and swivels rated with a proof load and marked; hooks with cracks or more than 10% throat opening deformation are removed.
Load weight estimate: steel 7850 kg/m3, concrete 2400 kg/m3, wood (softwood) about 500 kg/m3; volume times density gives mass.
Tools, Equipment, and Maintenance
Guards on circular saws return to cover the blade automatically; the riving knife is set within 5 mm of the blade and no higher than the blade top.
Abrasive wheels: ring test before mounting; match wheel speed rating to the tool; guard covers at least half the wheel and the tool has a dead-man switch.
Powder-actuated tools: operator certified, eye and hearing protection, and the tool never loaded until immediately before use; misfire held down for 30 seconds.
Compressors and air tools: hose whip checks at every connection; never exceed the tool's rated pressure; drain receiver tanks regularly.
Ladder setup: 4:1 rule, one unit of horizontal distance for every four units of vertical height; extend 1 m (3 ft) above the landing for access.
Scaffold inspection: check sills, base plates, plumb, bracing, planks, guardrails, and ties before each shift and after alteration or high wind.
Fuel-powered equipment: never refuel a hot engine or in an enclosed space; store fuel in approved containers away from ignition sources.
Lockout applies to maintenance: de-energize, isolate, lock, tag, and verify the equipment cannot start before removing guards or clearing jams.
Demolition, Renovation, and Site Cleanup
Pre-demolition survey: identify hazardous materials (asbestos, lead paint, PCBs), structural load paths, and utilities; disconnect and cap services before demolition.
Demolition sequence generally works top-down and from the least to most stable elements; never undercut a wall or leave unsupported masonry above a work area.
Designated substance survey before renovation: test suspect materials for asbestos and lead; abatement by qualified workers with air monitoring before general demolition.
Lead paint removal from a building constructed before 1980 requires controls: containment, HEPA vacuum, wet methods, and personal exposure monitoring.
Chimney demolition: remove from the top down in sections; do not topple a chimney onto a structure, and brace it during removal.
Debris removal: chutes or covered openings for material above one storey; drop zones barricaded and controlled by a spotter.
Site cleanup: remove debris daily, keep walkways clear, and separate waste streams for recycling and disposal records.
Burning is prohibited on construction sites in most jurisdictions; debris is hauled to an approved disposal or recycling facility.
Documentation, Communication, and Professional Practice
Contract documents hierarchy: agreement, general conditions, supplementary conditions, specifications, drawings, and addenda; the order of precedence is stated in the contract.
A request for information (RFI) documents a clarification; a change order is a written, signed modification to scope, price, or schedule; never proceed on verbal direction alone.
Shop drawings are contractor-prepared detail drawings submitted for design review; approval does not relieve the contractor of contract compliance.
Site diary entries: date, weather, crew and equipment on site, work performed, visitors, delays, deliveries, and instructions received, recorded the same day.
Field instruction and site instruction records: written confirmation of verbal directions issued within 24-48 hours to preserve claims.
As-built drawings record actual installed conditions and must be updated throughout construction, not reconstructed at the end of the project.
Progress reporting: percent complete by cost or by quantity installed; compare against the baseline schedule and flag variance early.
Professional practice: only perform work within trade certification and scope; report unsafe conditions; keep client and employer information confidential.
Occupational Health and Safety
Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.
Four classes of fall protection: guardrails, personal fall-arrest systems, safety nets, and travel-restraint systems; fall arrest requires a rescue plan before work starts.
Fall-arrest anchor strength: 22 kN (5,000 lbf) per worker for engineered anchors; free-fall distance kept under 1.8 m (6 ft) where practicable.
Respirable crystalline silica: workplace exposure limit commonly 0.025 mg/m3 (8-hour TWA) in Ontario; wet cutting and local exhaust ventilation are primary controls.
Confined-space entry requires a hazard assessment, entry permit, atmospheric testing (oxygen 19.5-23%), attendant, and rescue provisions before entry.
Hazardous energy control (lockout/tagout): isolate, lock, tag, verify zero energy by test, and confirm stored energy is released before work.
Noise: hearing protection required at 85 dBA Lex 8-hour; exposure limit 85 dBA in most Canadian jurisdictions; double protection above 105 dBA.
WHMIS 2016: pictograms, supplier labels, and safety data sheets with 16 sections; worker training required before handling a controlled product.
Incident reporting: report serious injuries and critical injuries to the regulator immediately; preserve the scene unless rescue or safety requires changes.
Environmental Protection
Erosion and sediment controls: silt fence, straw bale barriers, sediment traps, and check dams installed before grading; inspect after every rain event.
Silt fence placement: on the contour, keyed into the ground, with the fabric on the uphill side; not used in concentrated flow channels.
Spill response sequence: stop the source, contain with absorbent or berm, protect drains and watercourses, notify, and dispose of waste per regulation.
Designated substances and asbestos: suspect materials tested before disturbance; asbestos work follows jurisdiction-specific licensing and notification rules.
Waste segregation: separate clean fill, recyclable metals, wood, gypsum, and hazardous waste (paints, solvents, fuels) to meet diversion requirements.
Fuel storage: secondary containment sized to at least 110% of the largest container; drip trays under refuelling points.
Dust suppression: water carts or applied water on unpaved haul roads; visible dust from a site boundary is a common compliance trigger.
Protected trees: establish a tree protection zone at the drip line or per arborist plan; no storage, parking, or excavation inside it.
Site Preparation, Layout, and Surveying Support
Benchmark (BM) is a fixed elevation reference; a temporary benchmark (TBM) is established on site and tied to the BM.
Differential levelling: HI = backsight reading + known elevation; unknown elevation = HI minus foresight reading. Arithmetic check: sum BS - sum FS = last RL - first RL.
3-4-5 method: a triangle with sides 3, 4, and 5 units has a 90-degree angle between the 3 and 4 sides; scale to 6-8-10 or 9-12-15 for larger layouts.
Building layout: set batter boards beyond excavation limits, stretch string lines, and transfer corners with a plumb bob or laser; confirm diagonals are equal for squareness.
Slope expressed as percent grade = (rise / run) x 100; a 2% slope drops 0.02 m per 1 m of horizontal run.
Station and offset notation: station is distance along a baseline, offset is perpendicular distance left or right; used to set utilities and structures.
Total station setup: occupy a known point, backsight a second known point, then check a third known point to verify angular closure before staking.
Site stripping: topsoil removed to a defined depth and stockpiled separately for later reuse in landscaping and restoration.
Excavation, Trenching, and Shoring
Trench definition: depth greater than width, and width at the bottom 2 m (6 ft) or less; deeper than 1.2 m (4 ft) requires a protective system in most Canadian jurisdictions.
Soil types: Type 1 (hard, stable), Type 2 (stiff, cohesive), Type 3 (soft, disturbed), Type 4 (running, submerged); each type sets maximum slope angles and shoring requirements.
Sloping for protection: Type 1 about 3/4:1, Type 2 about 1:1, Type 3 about 1.5:1, Type 4 requires engineering; verify against the local regulation table.
Spoil and equipment kept back at least 1 m (3 ft) from the trench edge; ladders within 7.5 m (25 ft) of travel for worker access and egress.
Locate buried utilities before digging by calling the provincial one-call service and hand exposing within the tolerance zone; never machine dig near marked lines.
Daily and post-rain inspection by a competent person: check for tension cracks, sloughing, water accumulation, and spoil loading at the crest.
Trench boxes: installed so the top is above grade and the bottom is within 0.6 m (2 ft) of the trench bottom; workers stay inside the box during hoisting.
Atmospheric testing before entry: oxygen 19.5-23%, combustible gas below 10% LEL, and toxic gases below exposure limits; continue monitoring while occupied.
Concrete and Formwork Support
Concrete mix ratio by volume for general work: 1 part cement, 2 parts sand, 3 parts coarse aggregate; water-cement ratio controls strength and durability.
Formwork design loads: concrete weight about 24 kN/m3 (150 lb/ft3), plus live load, impact, and lateral pressure from fresh concrete.
Formwork removal: sides of non-load-bearing forms after concrete is hard enough not to be damaged; soffits and props only after the specified strength is reached (commonly 70% of design strength for slabs).
Slump test measures workability; typical structural range 75-125 mm; test per CSA A23.2 on a sample from the middle of the load.
Curing: keep concrete moist and above 5 degrees C for at least 7 days (Type 1 cement) or per specification; cold weather requires insulation and temperature records.
Formwork ties and bracing: snap ties rated for the lateral pressure; vertical and diagonal bracing to resist wind and placement forces.
Control joints are sawn or formed to a depth of about 1/4 slab thickness to control random cracking; spacing typically 24-36 times slab thickness.
Concrete placement: free fall limited to about 1.5 m (5 ft) to prevent segregation; vibrate systematically without over-vibration.
Masonry and Bricklaying Support
Mortar types: M (high strength, 2500 psi), S (medium-high, 1800 psi), N (general purpose, 750 psi), O (low strength, 350 psi); S or N common for exterior load-bearing walls.
Standard modular brick: 90 mm x 57 mm x 190 mm face dimensions with 10 mm mortar joints; nominal module 200 mm x 67 mm x 200 mm.
Running bond: each course offset half a brick; common bond has header courses every fifth or sixth course; English bond alternates stretcher and header courses.
Wall ties: corrosion-resistant ties spaced at 600 mm horizontally and 400 mm vertically for cavity walls, with one tie per 0.25 m2 of wall area.
Flashing and weepholes: weepholes spaced at 800 mm (32 in) maximum and at 600 mm (24 in) near lintels; flashing lapped and terminated with a drip edge.
Lintel bearing: typically 100 mm (4 in) minimum bearing each side for masonry lintels; verify with the structural design.
Masonry grout: slump 200-275 mm for reinforced hollow block; consolidation by puddling or mechanical vibration to fill voids.
Scaffold for masonry: working platform width at least 500 mm (20 in), fully planked, with guardrails at 1 m and 2 m and toe boards.
Carpentry and Structural Support
Nominal to actual lumber: 2x4 is 38 x 89 mm, 2x6 is 38 x 140 mm, 2x10 is 38 x 235 mm; dressed dimensions govern spans and loads.
Floor joist spans are tabulated by species, grade, size, spacing, and live load; never overspan without checking the span table or engineer.
Bearing and notching: a notch in the top of a joist limited to 1/4 depth at the ends and 1/6 depth in the middle third; holes kept to the middle third of depth.
Stud spacing: 400 mm (16 in) or 600 mm (24 in) on centre; load-bearing walls require a double top plate and full bearing under headers.
Header sizing: opening width plus 75 mm (3 in) bearing each side; header depth increases with span and load; jack and king studs flank the opening.
Roof pitch = rise / run; a 4/12 pitch rises 4 units per 12 units of run, giving an angle of about 18.4 degrees.
Rafter length = run / cos(pitch angle); multiply the run by the pitch factor for the common rafter length.
Truss installation: follow the truss layout drawing, brace per the truss designer, and never cut or notch truss members without engineering approval.
Sheathing fastening: panel edges supported and nailed at 150 mm (6 in) on centre, field nails at 300 mm (12 in) on centre for subfloor, per the schedule.
Materials Handling, Rigging, and Hoisting
Sling angle effect: tension = load / (number of legs x sin of the angle to horizontal); at 30 degrees, each leg carries the full load, at 60 degrees about 0.58 of the load.
Load centre of gravity must be below the hook for a stable lift; tag lines control rotation and are never wrapped around hands or body.
Rigging inspection: remove slings with broken wires, kinks, cuts, or missing tags; wire rope removal criteria include 10 randomly distributed broken wires in one lay.
Rated capacity of a sling is reduced by the splice, hardware, and configuration; never exceed the manufacturer's tag rating.
Crane hand signals: standardized signals used by a designated signaller; stop signal is one arm extended palm down, moving arm side to side.
Outrigger setup: fully extended on stable bearing pads; verify ground bearing capacity and keep clear of excavations and underground services.
Rigging hardware: shackles, hooks, and swivels rated with a proof load and marked; hooks with cracks or more than 10% throat opening deformation are removed.
Load weight estimate: steel 7850 kg/m3, concrete 2400 kg/m3, wood (softwood) about 500 kg/m3; volume times density gives mass.
Tools, Equipment, and Maintenance
Guards on circular saws return to cover the blade automatically; the riving knife is set within 5 mm of the blade and no higher than the blade top.
Abrasive wheels: ring test before mounting; match wheel speed rating to the tool; guard covers at least half the wheel and the tool has a dead-man switch.
Powder-actuated tools: operator certified, eye and hearing protection, and the tool never loaded until immediately before use; misfire held down for 30 seconds.
Compressors and air tools: hose whip checks at every connection; never exceed the tool's rated pressure; drain receiver tanks regularly.
Ladder setup: 4:1 rule, one unit of horizontal distance for every four units of vertical height; extend 1 m (3 ft) above the landing for access.
Scaffold inspection: check sills, base plates, plumb, bracing, planks, guardrails, and ties before each shift and after alteration or high wind.
Fuel-powered equipment: never refuel a hot engine or in an enclosed space; store fuel in approved containers away from ignition sources.
Lockout applies to maintenance: de-energize, isolate, lock, tag, and verify the equipment cannot start before removing guards or clearing jams.
Demolition, Renovation, and Site Cleanup
Pre-demolition survey: identify hazardous materials (asbestos, lead paint, PCBs), structural load paths, and utilities; disconnect and cap services before demolition.
Demolition sequence generally works top-down and from the least to most stable elements; never undercut a wall or leave unsupported masonry above a work area.
Designated substance survey before renovation: test suspect materials for asbestos and lead; abatement by qualified workers with air monitoring before general demolition.
Lead paint removal from a building constructed before 1980 requires controls: containment, HEPA vacuum, wet methods, and personal exposure monitoring.
Chimney demolition: remove from the top down in sections; do not topple a chimney onto a structure, and brace it during removal.
Debris removal: chutes or covered openings for material above one storey; drop zones barricaded and controlled by a spotter.
Site cleanup: remove debris daily, keep walkways clear, and separate waste streams for recycling and disposal records.
Burning is prohibited on construction sites in most jurisdictions; debris is hauled to an approved disposal or recycling facility.
Documentation, Communication, and Professional Practice
Contract documents hierarchy: agreement, general conditions, supplementary conditions, specifications, drawings, and addenda; the order of precedence is stated in the contract.
A request for information (RFI) documents a clarification; a change order is a written, signed modification to scope, price, or schedule; never proceed on verbal direction alone.
Shop drawings are contractor-prepared detail drawings submitted for design review; approval does not relieve the contractor of contract compliance.
Site diary entries: date, weather, crew and equipment on site, work performed, visitors, delays, deliveries, and instructions received, recorded the same day.
Field instruction and site instruction records: written confirmation of verbal directions issued within 24-48 hours to preserve claims.
As-built drawings record actual installed conditions and must be updated throughout construction, not reconstructed at the end of the project.
Progress reporting: percent complete by cost or by quantity installed; compare against the baseline schedule and flag variance early.
Professional practice: only perform work within trade certification and scope; report unsafe conditions; keep client and employer information confidential.
Occupational Health and Safety
Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.
Four classes of fall protection: guardrails, personal fall-arrest systems, safety nets, and travel-restraint systems; fall arrest requires a rescue plan before work starts.
Fall-arrest anchor strength: 22 kN (5,000 lbf) per worker for engineered anchors; free-fall distance kept under 1.8 m (6 ft) where practicable.
Respirable crystalline silica: workplace exposure limit commonly 0.025 mg/m3 (8-hour TWA) in Ontario; wet cutting and local exhaust ventilation are primary controls.
Confined-space entry requires a hazard assessment, entry permit, atmospheric testing (oxygen 19.5-23%), attendant, and rescue provisions before entry.
Hazardous energy control (lockout/tagout): isolate, lock, tag, verify zero energy by test, and confirm stored energy is released before work.
Noise: hearing protection required at 85 dBA Lex 8-hour; exposure limit 85 dBA in most Canadian jurisdictions; double protection above 105 dBA.
WHMIS 2016: pictograms, supplier labels, and safety data sheets with 16 sections; worker training required before handling a controlled product.
Incident reporting: report serious injuries and critical injuries to the regulator immediately; preserve the scene unless rescue or safety requires changes.
Environmental Protection
Erosion and sediment controls: silt fence, straw bale barriers, sediment traps, and check dams installed before grading; inspect after every rain event.
Silt fence placement: on the contour, keyed into the ground, with the fabric on the uphill side; not used in concentrated flow channels.
Spill response sequence: stop the source, contain with absorbent or berm, protect drains and watercourses, notify, and dispose of waste per regulation.
Designated substances and asbestos: suspect materials tested before disturbance; asbestos work follows jurisdiction-specific licensing and notification rules.
Waste segregation: separate clean fill, recyclable metals, wood, gypsum, and hazardous waste (paints, solvents, fuels) to meet diversion requirements.
Fuel storage: secondary containment sized to at least 110% of the largest container; drip trays under refuelling points.
Dust suppression: water carts or applied water on unpaved haul roads; visible dust from a site boundary is a common compliance trigger.
Protected trees: establish a tree protection zone at the drip line or per arborist plan; no storage, parking, or excavation inside it.
Site Preparation, Layout, and Surveying Support
Benchmark (BM) is a fixed elevation reference; a temporary benchmark (TBM) is established on site and tied to the BM.
Differential levelling: HI = backsight reading + known elevation; unknown elevation = HI minus foresight reading. Arithmetic check: sum BS - sum FS = last RL - first RL.
3-4-5 method: a triangle with sides 3, 4, and 5 units has a 90-degree angle between the 3 and 4 sides; scale to 6-8-10 or 9-12-15 for larger layouts.
Building layout: set batter boards beyond excavation limits, stretch string lines, and transfer corners with a plumb bob or laser; confirm diagonals are equal for squareness.
Slope expressed as percent grade = (rise / run) x 100; a 2% slope drops 0.02 m per 1 m of horizontal run.
Station and offset notation: station is distance along a baseline, offset is perpendicular distance left or right; used to set utilities and structures.
Total station setup: occupy a known point, backsight a second known point, then check a third known point to verify angular closure before staking.
Site stripping: topsoil removed to a defined depth and stockpiled separately for later reuse in landscaping and restoration.
Excavation, Trenching, and Shoring
Trench definition: depth greater than width, and width at the bottom 2 m (6 ft) or less; deeper than 1.2 m (4 ft) requires a protective system in most Canadian jurisdictions.
Soil types: Type 1 (hard, stable), Type 2 (stiff, cohesive), Type 3 (soft, disturbed), Type 4 (running, submerged); each type sets maximum slope angles and shoring requirements.
Sloping for protection: Type 1 about 3/4:1, Type 2 about 1:1, Type 3 about 1.5:1, Type 4 requires engineering; verify against the local regulation table.
Spoil and equipment kept back at least 1 m (3 ft) from the trench edge; ladders within 7.5 m (25 ft) of travel for worker access and egress.
Locate buried utilities before digging by calling the provincial one-call service and hand exposing within the tolerance zone; never machine dig near marked lines.
Daily and post-rain inspection by a competent person: check for tension cracks, sloughing, water accumulation, and spoil loading at the crest.
Trench boxes: installed so the top is above grade and the bottom is within 0.6 m (2 ft) of the trench bottom; workers stay inside the box during hoisting.
Atmospheric testing before entry: oxygen 19.5-23%, combustible gas below 10% LEL, and toxic gases below exposure limits; continue monitoring while occupied.
Concrete and Formwork Support
Concrete mix ratio by volume for general work: 1 part cement, 2 parts sand, 3 parts coarse aggregate; water-cement ratio controls strength and durability.
Formwork design loads: concrete weight about 24 kN/m3 (150 lb/ft3), plus live load, impact, and lateral pressure from fresh concrete.
Formwork removal: sides of non-load-bearing forms after concrete is hard enough not to be damaged; soffits and props only after the specified strength is reached (commonly 70% of design strength for slabs).
Slump test measures workability; typical structural range 75-125 mm; test per CSA A23.2 on a sample from the middle of the load.
Curing: keep concrete moist and above 5 degrees C for at least 7 days (Type 1 cement) or per specification; cold weather requires insulation and temperature records.
Formwork ties and bracing: snap ties rated for the lateral pressure; vertical and diagonal bracing to resist wind and placement forces.
Control joints are sawn or formed to a depth of about 1/4 slab thickness to control random cracking; spacing typically 24-36 times slab thickness.
Concrete placement: free fall limited to about 1.5 m (5 ft) to prevent segregation; vibrate systematically without over-vibration.
Masonry and Bricklaying Support
Mortar types: M (high strength, 2500 psi), S (medium-high, 1800 psi), N (general purpose, 750 psi), O (low strength, 350 psi); S or N common for exterior load-bearing walls.
Standard modular brick: 90 mm x 57 mm x 190 mm face dimensions with 10 mm mortar joints; nominal module 200 mm x 67 mm x 200 mm.
Running bond: each course offset half a brick; common bond has header courses every fifth or sixth course; English bond alternates stretcher and header courses.
Wall ties: corrosion-resistant ties spaced at 600 mm horizontally and 400 mm vertically for cavity walls, with one tie per 0.25 m2 of wall area.
Flashing and weepholes: weepholes spaced at 800 mm (32 in) maximum and at 600 mm (24 in) near lintels; flashing lapped and terminated with a drip edge.
Lintel bearing: typically 100 mm (4 in) minimum bearing each side for masonry lintels; verify with the structural design.
Masonry grout: slump 200-275 mm for reinforced hollow block; consolidation by puddling or mechanical vibration to fill voids.
Scaffold for masonry: working platform width at least 500 mm (20 in), fully planked, with guardrails at 1 m and 2 m and toe boards.
Carpentry and Structural Support
Nominal to actual lumber: 2x4 is 38 x 89 mm, 2x6 is 38 x 140 mm, 2x10 is 38 x 235 mm; dressed dimensions govern spans and loads.
Floor joist spans are tabulated by species, grade, size, spacing, and live load; never overspan without checking the span table or engineer.
Bearing and notching: a notch in the top of a joist limited to 1/4 depth at the ends and 1/6 depth in the middle third; holes kept to the middle third of depth.
Stud spacing: 400 mm (16 in) or 600 mm (24 in) on centre; load-bearing walls require a double top plate and full bearing under headers.
Header sizing: opening width plus 75 mm (3 in) bearing each side; header depth increases with span and load; jack and king studs flank the opening.
Roof pitch = rise / run; a 4/12 pitch rises 4 units per 12 units of run, giving an angle of about 18.4 degrees.
Rafter length = run / cos(pitch angle); multiply the run by the pitch factor for the common rafter length.
Truss installation: follow the truss layout drawing, brace per the truss designer, and never cut or notch truss members without engineering approval.
Sheathing fastening: panel edges supported and nailed at 150 mm (6 in) on centre, field nails at 300 mm (12 in) on centre for subfloor, per the schedule.
Materials Handling, Rigging, and Hoisting
Sling angle effect: tension = load / (number of legs x sin of the angle to horizontal); at 30 degrees, each leg carries the full load, at 60 degrees about 0.58 of the load.
Load centre of gravity must be below the hook for a stable lift; tag lines control rotation and are never wrapped around hands or body.
Rigging inspection: remove slings with broken wires, kinks, cuts, or missing tags; wire rope removal criteria include 10 randomly distributed broken wires in one lay.
Rated capacity of a sling is reduced by the splice, hardware, and configuration; never exceed the manufacturer's tag rating.
Crane hand signals: standardized signals used by a designated signaller; stop signal is one arm extended palm down, moving arm side to side.
Outrigger setup: fully extended on stable bearing pads; verify ground bearing capacity and keep clear of excavations and underground services.
Rigging hardware: shackles, hooks, and swivels rated with a proof load and marked; hooks with cracks or more than 10% throat opening deformation are removed.
Load weight estimate: steel 7850 kg/m3, concrete 2400 kg/m3, wood (softwood) about 500 kg/m3; volume times density gives mass.
Tools, Equipment, and Maintenance
Guards on circular saws return to cover the blade automatically; the riving knife is set within 5 mm of the blade and no higher than the blade top.
Abrasive wheels: ring test before mounting; match wheel speed rating to the tool; guard covers at least half the wheel and the tool has a dead-man switch.
Powder-actuated tools: operator certified, eye and hearing protection, and the tool never loaded until immediately before use; misfire held down for 30 seconds.
Compressors and air tools: hose whip checks at every connection; never exceed the tool's rated pressure; drain receiver tanks regularly.
Ladder setup: 4:1 rule, one unit of horizontal distance for every four units of vertical height; extend 1 m (3 ft) above the landing for access.
Scaffold inspection: check sills, base plates, plumb, bracing, planks, guardrails, and ties before each shift and after alteration or high wind.
Fuel-powered equipment: never refuel a hot engine or in an enclosed space; store fuel in approved containers away from ignition sources.
Lockout applies to maintenance: de-energize, isolate, lock, tag, and verify the equipment cannot start before removing guards or clearing jams.
Demolition, Renovation, and Site Cleanup
Pre-demolition survey: identify hazardous materials (asbestos, lead paint, PCBs), structural load paths, and utilities; disconnect and cap services before demolition.
Demolition sequence generally works top-down and from the least to most stable elements; never undercut a wall or leave unsupported masonry above a work area.
Designated substance survey before renovation: test suspect materials for asbestos and lead; abatement by qualified workers with air monitoring before general demolition.
Lead paint removal from a building constructed before 1980 requires controls: containment, HEPA vacuum, wet methods, and personal exposure monitoring.
Chimney demolition: remove from the top down in sections; do not topple a chimney onto a structure, and brace it during removal.
Debris removal: chutes or covered openings for material above one storey; drop zones barricaded and controlled by a spotter.
Site cleanup: remove debris daily, keep walkways clear, and separate waste streams for recycling and disposal records.
Burning is prohibited on construction sites in most jurisdictions; debris is hauled to an approved disposal or recycling facility.
Documentation, Communication, and Professional Practice
Contract documents hierarchy: agreement, general conditions, supplementary conditions, specifications, drawings, and addenda; the order of precedence is stated in the contract.
A request for information (RFI) documents a clarification; a change order is a written, signed modification to scope, price, or schedule; never proceed on verbal direction alone.
Shop drawings are contractor-prepared detail drawings submitted for design review; approval does not relieve the contractor of contract compliance.
Site diary entries: date, weather, crew and equipment on site, work performed, visitors, delays, deliveries, and instructions received, recorded the same day.
Field instruction and site instruction records: written confirmation of verbal directions issued within 24-48 hours to preserve claims.
As-built drawings record actual installed conditions and must be updated throughout construction, not reconstructed at the end of the project.
Progress reporting: percent complete by cost or by quantity installed; compare against the baseline schedule and flag variance early.
Professional practice: only perform work within trade certification and scope; report unsafe conditions; keep client and employer information confidential.