Red Seal CCW flashcards
Red Seal CCW · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Hierarchy of controls
- Ranking of hazard controls from most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment as the last line of defence.
- Fall-arrest anchor strength
- An engineered anchor point for personal fall arrest must resist about 22 kN (5,000 lbf) per worker attached, and a rescue plan must exist before work begins.
- Confined space entry conditions
- Before entry: hazard assessment, entry permit, atmospheric test showing oxygen between 19.5 and 23 percent, attendant outside, and rescue provisions in place.
- Silt fence placement rule
- Install on the contour with fabric on the uphill side and the bottom keyed into soil; use only for sheet flow, never in concentrated channels or streams.
- Fuel storage containment
- Secondary containment around fuel containers must hold at least 110 percent of the largest container volume, with drip trays under refuelling connections.
- Spill response sequence
- Stop the source, contain the spill with absorbent or berms, protect drains and watercourses, notify the required parties, then dispose of contaminated material per regulation.
- Height of instrument formula
- HI equals the known elevation plus the backsight reading; an unknown elevation equals HI minus the foresight reading taken on that point.
- 3-4-5 square method
- A triangle with sides in ratio 3:4:5 has a 90-degree angle between the short sides; scale up to 6-8-10 for larger building layouts.
- Percent grade formula
- Percent grade equals rise divided by run, multiplied by 100. A 2 percent slope drops 0.02 metres for every 1 metre of horizontal distance.
- Trench protective system trigger
- A trench deeper than 1.2 metres (4 feet) generally requires a protective system such as sloping, shoring, or a trench box under Canadian occupational health and safety rules.
- Spoil pile setback
- Excavated spoil, materials, and equipment must be kept at least 1 metre (3 feet) back from the trench edge to reduce surcharge loading and collapse risk.
- Formwork removal strength
- Non-load-bearing side forms may be removed once concrete resists damage; soffit props stay until concrete reaches the specified strength, often 70 percent of design strength.
- Concrete slump test purpose
- The slump test measures fresh concrete workability and consistency; structural concrete commonly falls in a 75 to 125 millimetre slump range.
- Mortar type selection
- Type M is highest strength, S medium-high, N general purpose, and O low strength; Type S or N is typical for exterior load-bearing masonry walls.
- Weephole spacing
- Weepholes in a masonry veneer are spaced no more than 800 millimetres apart, reduced to 600 millimetres near lintels, to drain the cavity.
- Nominal versus actual lumber
- A nominal 2x4 measures 38 by 89 millimetres dressed; a 2x6 is 38 by 140 millimetres. Span tables use dressed dimensions, not nominal names.
- Joist notching limits
- Notches in the top of a floor joist are limited to one quarter of depth at the ends and one sixth of depth in the middle third of the span.
- Sling leg tension formula
- Tension per leg equals load divided by the number of legs times the sine of the angle to horizontal; flatter angles dramatically increase leg tension.
- Rigging hook rejection
- Remove hooks showing cracks, excessive wear, or throat opening deformation greater than 10 percent; never exceed the rated capacity marked on the tag.
- Crane stop hand signal
- The stop signal is one arm extended horizontally with palm down, moved side to side; only a designated signaller should direct the crane operator.
- Ladder 4-to-1 rule
- Set the ladder base one unit out for every four units of working height, and extend the top at least 1 metre (3 feet) above the landing surface.
- Circular saw riving knife
- The riving knife sits within 5 millimetres of the blade and no higher than the blade top, and the retracting guard must cover the blade automatically.
- Abrasive wheel ring test
- Tap a clean wheel lightly and listen for a clear ring; a dull thud indicates a crack. Match the wheel speed rating to the tool before mounting.
- Pre-demolition hazard survey
- Before demolition, identify asbestos, lead paint, PCBs, structural load paths, and utilities; disconnect and cap services and complete abatement before general demolition.
- Demolition sequence principle
- Demolish generally from the top down and from least to most stable elements; never undercut a wall or leave masonry unsupported above a work area.
- Change order versus RFI
- A request for information seeks clarification and does not change the contract; a change order is a signed written modification to scope, price, or schedule.
- Site diary content
- Record date, weather, crew and equipment on site, work performed, deliveries, visitors, delays, and instructions received, entered the same day as events occur.
- As-built drawing purpose
- As-built drawings record actual installed conditions and must be updated continuously during construction, not reconstructed after project completion.
- WHMIS 2016 information elements
- Controlled products carry pictograms, supplier labels, and a 16-section safety data sheet; workers need training before handling any controlled product.
- Trench box installation limits
- A trench box top sits above grade and its bottom within 0.6 metres (2 feet) of the trench bottom; workers stay inside while the box is moved.
- Roof pitch calculation
- Pitch is rise over run; a 4/12 roof rises 4 units for every 12 horizontal units, an angle of about 18.4 degrees, and rafter length equals run divided by cosine of that angle.
- Curing temperature and duration
- Concrete should stay moist and above 5 degrees Celsius for at least 7 days with Type 1 cement, or per specification, with cold-weather insulation and temperature records.