Quick reference

Work planning and measurement

  • Confirm the current approved documents and actual equipment identity.

  • Isolate and verify relevant energy sources, including stored energy.

  • Record pressure reference, test point and operating load.

  • Select instrument range and resolution for the measurement.

  • Input rate = volume flow × heating value on matching bases.

  • Efficiency = useful output / input.

  • Use units to detect an inverted conversion or missing factor.

Quick reference

Fuel delivery and components

  • Size each section for its downstream loads using the applicable method.

  • Use the table and assumptions for the actual fuel and piping system.

  • Consider fitting and route resistance, not straight length alone.

  • Match materials, ratings and approvals as well as thread size.

  • A cracked flare or kinked tube needs approved correction.

  • Check regulator flow direction, vent condition and specified operation.

  • Compare no-flow behaviour with performance under connected load.

Quick reference

Combustion and venting

  • Complete methane combustion principally forms carbon dioxide and water.

  • Total air and local mixing both influence combustion completeness.

  • Flame colour alone cannot quantify carbon monoxide.

  • Venting depends on driving pressure, resistance and building conditions.

  • Distinguish combustion air from downstream dilution air.

  • Use the approved vent system for pressure, temperature and condensate.

  • Effective free area = gross opening × stated free-area fraction.

Quick reference

Controls and circuits

  • Trace demand, proving, purge, ignition, run and shutdown in order.

  • A normally open symbol describes the specified reference state.

  • Voltage is measured across points; inline current is measured in the path.

  • Resistance testing normally requires isolation and verification.

  • Thermostat demand does not prove flame.

  • Flame-rectification grounding forms part of the sensing circuit.

  • A permanent jumper is not a repair for a protective control.

Quick reference

Commissioning and service

  • A successful ignition is not a complete commissioning test.

  • Distinguish piping pressure tests, connection leak checks and operating tests.

  • Account for other loads when measuring input through a shared meter.

  • Heat transfer depends on flow and temperature rise.

  • Investigate the cause of repeated safety trips.

  • Verify actual shutdown and the affected post-repair safety functions.

  • Document restrictions and leave decommissioned branches safely identified.