Allowable load per ASTM E1300
A design chart method giving the allowable uniform lateral load for a glass pane based on nominal thickness, pane dimensions and support condition (four-side, three-side, two-side or cantilever).
Heat-strength vs tempered glass
Heat-strengthened glass has about twice the strength of annealed glass and breaks into larger shards; fully tempered glass has about four times the strength and breaks into small dice-like particles.
Safety glazing hazardous locations
Glazing in doors, within 24 inches of a door edge, under 18 inches above the floor, and large panes in hazardous locations must be safety glazing meeting 16 CFR 1201.
Ionoplast interlayer
A stiff structural interlayer (SGP) used in laminated glass that provides much greater post-breakage stiffness and residual strength than standard PVB, common in overhead and blast glazing.
Setting block placement
Setting blocks support glass in a frame and are placed at the quarter points of the bottom edge, never at the corners, so the glass does not bear on the frame corners.
Polycarbonate vs acrylic glazing
Polycarbonate is far tougher than acrylic but yellows under UV unless coated; acrylic is about half the weight of glass and clearer but scratches easily.
Spandrel glass
Opaque-backed glass used to hide floor slabs and structure; heat-treated glass is often required because the opaque coating raises thermal stress, and ceramic frit is the durable option.
Structural silicone bite formula
Bite equals the shortest glass dimension times design wind pressure, divided by two times the allowable silicone stress; typical allowable stress is about 20 psi for wind load.
SSG mechanical retention
Two-sided structural silicone glazing must include a mechanical retainer such as edge blocks or a channel that holds the glass if the structural silicone bond fails.
Curtain wall drift accommodation
Curtain wall systems must accommodate inter-story drift of roughly L/100 to L/200 plus 0.5 inch through slotted connections, gaskets and joint design.
Pressure-equalized rain screen
A drained and vented cavity behind the outer seal that equalizes air pressure across the rain screen, so water is drained out through weeps rather than forced inward.
AAMA 501 mock-up tests
A series of tests on a full-size mock-up covering air infiltration (ASTM E283), static and dynamic water penetration (ASTM E331, AAMA 501.1) and structural performance (ASTM E330).
Aluminum thermal expansion
Aluminum expands about 13 × 10⁻⁶ per °F (23 × 10⁻⁶ per °C); a 10-foot mullion moves roughly 0.16 inch over a 100°F temperature swing.
Storefront height limit
Storefront framing is generally limited to about 12 to 14 feet in height and depends on the building structure for lateral support, unlike floor-to-floor curtain wall.
SSG field adhesion test
A peel test performed on the actual glass and metal substrates before installation to confirm that the structural silicone bonds properly and is compatible with tapes and spacers.
Skylight glazing requirement
Sloped glazing and skylights generally require laminated glass, tempered glass or a combination, and often a screen or guard beneath for fall protection.
Minimum skylight slope
Shingle-type sloped glazing systems typically require a minimum slope of about 3 in 12 (roughly 14 degrees); lower slopes need special gasketed or sealed systems.
Skylight condensation drainage
Skylights need a thermal-broken frame, warm-edge spacers and an interior gutter that drains condensation to the exterior through a weep path.
NFRC label values
The NFRC label reports whole-assembly U-factor, solar heat gain coefficient and visible transmittance, allowing comparison of window thermal and solar performance.
Soft-coat vs hard-coat low-e
Soft-coat low-e has lower emissivity and better U-value but must be protected on an interior surface; hard-coat low-e is durable and can be exposed to the weather.
Standard door leaf thickness
A standard commercial door leaf is 1¾ inches thick, with typical height 7 feet 0 inches, and requires hinge and closer reinforcement specified in the hardware schedule.
Door sidelight glazing
Glass in door leaves and in sidelights within 24 inches of the door edge must be safety glazing and must carry a visible safety glazing label.
Window air and water tests
Window performance is verified by ASTM E283 air leakage, ASTM E547 or E331 water penetration, and ASTM E330 structural pressure testing.
Skylight fall protection
Skylights in roof areas often require impact-rated glazing or a guard screen beneath, because the glazing must resist a 200-pound impact or be protected.
Shower door safety glazing
Shower doors and tub enclosures require tempered or laminated safety glazing; framed units typically use 3/16 to 3/8 inch glass, frameless units 3/8 to 1/2 inch.
Frameless shower hole spacing
Holes for hinges and clamps must be drilled before tempering, are commonly 1/2 inch diameter, and must be at least 1½ times the hole diameter from any edge.
Mirror edge sealing
Mirror edges should be sealed and the back allowed to breathe, because trapped moisture causes black-edge corrosion and silvering failure at the edges.
Mirror safety backing
Mirrors in hazardous locations such as doors and gyms must be safety-backed or laminated so broken pieces stay adhered to the backing.
Glass guardrail loading
Glass guard infill must resist a 200-pound concentrated load in any direction and 50 pounds per linear foot at the top rail, and panels are usually laminated.
Leaded glass support
Leaded and copper-foil panels need saddle bars or rebar for support over spans of roughly 2 to 3 feet to prevent sagging of the lead came.
Obscure glass privacy limit
Patterned or obscure glass reduces visibility but does not guarantee privacy at night, when a lit interior makes the glass transparent from outside.
Tempered glass label
Tempered safety glazing must carry a permanent, visible label identifying it as safety glazing; the label must remain after installation.