Red Seal Glazier · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing

  • List the four glass types (annealed, heat-strengthened, tempered, laminated) and state one code-relevant property and typical application for each

  • Identify the five common glass substitutes (acrylic, polycarbonate, laminated safety glass, wire glass, fire-rated ceramic) and match each to an approved use

  • Explain the difference between safety glazing and security glazing and give one location where each is required

  • Describe the purpose of edge clearance and setting blocks in a commercial storefront installation

  • Outline the basic curtain wall load path from glass to mullion to anchor to structure

Your checkpoint

A one-page comparison table of glass types and substitutes with properties, typical uses, and one code reference each

Week 2

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing

  • Distinguish curtain wall, storefront, and window wall systems by span, anchorage, and water management strategy

  • Identify the components of a pressure-equalized curtain wall (rainscreen, air barrier, weep path) and explain how each controls water penetration

  • Describe the steps for structural silicone glazing (SSG) including surface preparation, primer, and cure verification

  • Explain the difference between two-sided and four-sided SSG and state one limitation of each

  • Calculate the required bite for a given SSG joint using a simplified wind-load and allowable-stress approach

Your checkpoint

A labeled sketch of a pressure-equalized curtain wall section with water path arrows and a written SSG bite calculation

Week 3

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing

  • Compare wet glazing, dry glazing, and tape glazing and state one commercial application for each

  • Describe how thermal movement is accommodated in a curtain wall with slotted connections and expansion joints

  • List the inspection points for a storefront installation before, during, and after glazing

  • Explain the role of the air/vapor barrier and how to avoid common continuity failures at transitions

  • Identify the safety glazing requirements for glass in doors, sidelights, and low-level glazing in public buildings

Your checkpoint

A 10-point pre-glazing inspection checklist for a commercial storefront, each point tied to a specific failure it prevents

Week 4

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing & Windows, Doors, Skylights and Sloped Glazing

  • Describe the differences between fixed windows, casement, awning, slider, and tilt-turn operating hardware

  • Explain the sequence for installing a window in a wood-frame wall with flashing, sill pan, and air sealing

  • Describe the requirements for sloped glazing including drainage, condensation control, and snow load

  • Identify the components of a skylight assembly and the difference between curb-mounted and deck-mounted units

  • Explain how door hardware (hinges, closers, thresholds) affects glass sizing and safety glazing requirements

Your checkpoint

A written installation sequence for one window type and one skylight type, each with five critical quality checkpoints

Week 5

Windows, Doors, Skylights and Sloped Glazing & Residential Specialty Glass, Mirrors and Shower Doors

  • Describe the steps to measure and template a shower door enclosure including out-of-square conditions

  • Explain the difference between framed, semi-frameless, and frameless shower doors and the hardware each requires

  • List the safety glazing requirements for shower and bath enclosures and how to verify the glass marking

  • Describe the process for cutting, edging, and drilling glass for shower door hardware without causing breakage

  • Explain how to install a mirror with mastic versus clips and the substrate requirements for each

Your checkpoint

A measurement and installation checklist for a frameless shower door, including out-of-square tolerance and hardware placement

Week 6

Windows, Doors, Skylights and Sloped Glazing & Residential Specialty Glass, Mirrors and Shower Doors

  • Describe the types of residential specialty glass (textured, tinted, low-E, reflective) and one performance trade-off for each

  • Explain the proper method for measuring and installing a mirror on a wall with adhesive and mechanical support

  • Identify the causes of mirror desilvering and how to prevent them during installation

  • Describe the installation of a sliding glass door including track leveling, rollers, and lock adjustment

  • Explain the requirements for glass in railings, stairwells, and other residential locations where safety glazing is required

Your checkpoint

A one-page guide comparing three residential specialty glass products with installation notes and one common defect for each

Week 7

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing & Windows, Doors, Skylights and Sloped Glazing & Residential Specialty Glass, Mirrors and Shower Doors

  • Review the code requirements for safety glazing in hazardous locations across all four domains

  • Practice calculating glass thickness and support requirements for a given wind load and opening size

  • Identify the causes of sealant failure in SSG and curtain wall joints and how to test adhesion

  • Describe the sequence for replacing a broken glass unit in a curtain wall without damaging adjacent units

  • Explain the documentation required for a commercial glazing project including shop drawings and submittals

Your checkpoint

A completed practice set of 20 mixed-domain questions with written explanations for each answer

Week 8

Industrial, Commercial, Institutional and Residential Glass and Glass Substitute Work & Curtain Wall, Storefront and Structural Silicone Glazing (SSG) Framing & Windows, Doors, Skylights and Sloped Glazing & Residential Specialty Glass, Mirrors and Shower Doors

  • Complete a timed 100-question practice exam covering all four domains and score at least 75%

  • Review every missed question and write a one-sentence correction for each

  • Re-state the key safety glazing locations and marking requirements from memory

  • Summarize the installation sequence for one curtain wall, one window, one skylight, and one shower door

  • Create a personal list of the five weakest topics and one action to address each before exam day

Your checkpoint

A scored practice exam with a written review log of every incorrect answer and a final one-page summary sheet

Milestones

Week 2: Can explain pressure-equalized curtain wall water management and SSG steps without notes, and correctly calculate a bite dimension for a sample joint

Week 4: Can describe the installation sequence for a window and a skylight and list the safety glazing requirements for doors and sidelights

Week 6: Can measure and plan a frameless shower door installation and explain mirror mounting methods and desilvering prevention

Week 8: Scores at least 75% on a timed 100-question practice exam and has a written review log of all missed items