Mistake 1

When a question describes a job on a de-energized line, the candidate jumps straight to the work steps and never states the isolation, test, and ground sequence (identify, disconnect, test for absence of voltage, apply personal grounds at the work site, install tags/locks).

Most study material presents procedures as a list of steps to memorize, and candidates rehearse the physical work because that feels like the 'real' trade. The safety sequence is treated as preamble rather than the part of the answer the exam is scoring, so it gets skipped under time pressure.

What to do instead

For every isolation-style question, write the answer as a fixed five-line skeleton before adding any task detail: isolate, lock/tag, test for absence of voltage with a proven tester, apply personal protective grounds at the point of work, confirm bonding/equipotential. Rehearse this skeleton on 20 practice scenarios until it is automatic, and check the answer contains a test and a ground step every time.

Mistake 2

Treating voltage drop and conductor ampacity as the same check: sizing a conductor or transformer from load current alone, or checking drop alone, and never verifying both against the limit the question states.

In the field, experienced workers often use rules of thumb and one dominant check. On the exam, both limits are usually embedded in the same scenario, and candidates answer the half they are most comfortable with, then pick the distractor that matches that single check.

What to do instead

Adopt a two-pass habit: pass one computes current and checks ampacity/overcurrent coordination; pass two computes voltage drop (using resistance and reactance for the conductor and length given) and compares it to the stated limit. Only after both passes choose the answer, and if the options include a value that satisfies one check but not the other, eliminate it explicitly.

Mistake 3

Confusing primary and secondary voltages, or phase-to-phase and phase-to-neutral values, when reading a scenario: for example applying a 7.2 kV line-to-neutral value as if it were the 12.5 kV line-to-line value, or reversing the ratio direction when calculating transformer output.

Distribution systems are described in both line-to-line and line-to-neutral terms, and candidates memorize numbers without anchoring which quantity each number represents. Ratio direction errors come from calculating 'up' when the question asks for the low side.

What to do instead

Before any calculation, write down the given values with their labels (line-to-line, line-to-neutral, primary, secondary) and the unknown with its label. Use the square root of three relationship explicitly rather than from memory. For transformer ratios, state in words 'high side to low side' or 'low side to high side' before dividing, and sanity-check that the answer is on the side the question asked about.

Mistake 4

Answering pole-setting and guying questions with a single number or a single rule, ignoring soil class, guy lead-to-height ratio, anchor type, and whether the load is balanced or the pole is an angle or dead-end structure.

Candidates memorize a few typical depths and a standard guy ratio and apply them everywhere. Exam items deliberately vary soil, load, and structure type so that the memorized default is one of the wrong options.

What to do instead

For each structure question, list the controlling variables first: soil classification, pole class and length, load per conductor, angle or dead-end condition, and anchor holding capacity. Then apply the rule to those variables. Practice deriving guy tension from lead and height rather than recalling a ratio, and check whether the question is asking for a minimum, a design value, or a field verification.

Mistake 5

Mixing up the purpose and sequence of cable pulling, duct integrity, and faulted-circuit locating steps in underground work: for example describing pulling tension limits without mentioning sidewall pressure, or omitting the mandrel and proof test before pulling.

Underground work is less visible in daily field experience for many candidates, so procedures are learned as vocabulary rather than as a sequence. The exam tests the sequence and the reason for each step, and candidates supply the term without the order or the purpose.

What to do instead

Build a one-page sequence for each underground task (duct proofing, pulling, terminating, testing, locating) with the reason beside each step. For pulling, always state both maximum pulling tension and maximum sidewall pressure, and note that the lower limit governs. When a question asks 'why', answer with the failure the step prevents, not just the name of the step.

Mistake 6

On transformer connection and bank questions, giving the connection name (for example delta-wye) without stating the voltage and phase relationships it produces, or ignoring the effect of a missing or reversed polarity lead when paralleling units.

Candidates learn connection diagrams visually and can name them, but exam items ask what the connection does to secondary voltage, neutral availability, and circulating current. Polarity and additive/subtractive marking is a common blind spot because it is rarely used in routine work.

What to do instead

For every connection question, write the three consequences: secondary line-to-line voltage, secondary line-to-neutral voltage and neutral availability, and behavior under unbalanced load or a fault. For paralleling, always check polarity markings, voltage ratio, impedance, and phase sequence before closing. Practice identifying additive versus subtractive polarity from terminal markings.

Mistake 7

Describing live-line work without stating the minimum approach distance, the rubber glove class and test currency, and the cover-up sequence; or treating cover-up as optional when the task could be done de-energized.

Candidates focus on the physical technique and forget that the exam scores the protective envelope: distance for the voltage, glove class and inspection, and the order in which covers go on and come off. Time pressure pushes them to the 'how' and skips the 'what protects you'.

What to do instead

Answer live-line items in a fixed order: voltage and resulting minimum approach distance, glove class and test date, cover-up sequence (cover what you must contact first and remove in reverse), then the work method. Always include the alternative of de-energizing and grounding where the question implies a choice, and state that live work is chosen only when justified.

Mistake 8

Jumping to a component replacement when a troubleshooting scenario gives symptoms: naming a failed transformer or blown fuse without first narrowing by the pattern of affected customers, the presence of voltage on one side, and the operation of protective devices.

Field experience rewards fast pattern recognition, and candidates answer with the most common cause rather than the cause consistent with all the evidence given. Exam scenarios include at least one detail that rules out the obvious answer.

What to do instead

Use a written narrowing sequence: define the boundary of the outage (one customer, one transformer, one feeder), check which protective device operated, then test at the boundary to split the circuit in half. Eliminate options that contradict any given symptom, and state the confirming test you would perform before naming the failed component.

Mistake 9

Ignoring rigging capacity and configuration in aerial device and specialty equipment questions: using a rope or sling without accounting for the sling angle, or answering about an aerial device without mentioning setup, outriggers, load limits, and approach distances.

Candidates treat rigging as a practical skill and answer from habit, using the working load limit of the hardware alone. The exam tests the effect of sling angle on tension and the stability requirements of the device, which are easy to overlook.

What to do instead

For every rigging item, calculate or state the tension increase caused by the sling angle and compare to the working load limit, not the breaking strength. For aerial device items, list setup (firm level ground, outriggers, wheel chocks), platform load limit, and minimum approach distance to energized conductors before describing the task.

Mistake 10

Answering switching and voltage-control questions as if a single operation restores normal conditions: omitting the check for backfeed, the order of opening and closing, and the effect on voltage regulators, capacitors, and reclosers downstream.

Candidates memorize switching terms but not the system response. Exam items ask what happens to voltage and protection after the switch is operated, and candidates answer only the immediate mechanical result.

What to do instead

For each switching question, write the before and after state of the circuit: sources, backfeed paths, regulator and capacitor status, and protective device settings. State the operation order and the verification step (voltage check, tag, communication with the control authority). Practice tracing a feeder one line at a time and naming what changes at each open point.