- Arc flash boundary
- The distance from exposed live parts where incident energy equals 1.2 cal/cm², the level that causes second-degree burns; used to set barricades and PPE requirements.
- Minimum approach distance
- The closest a qualified worker may bring any part of the body or uninsulated tool to an exposed energized part; it depends on voltage, altitude, and the work method used.
- Equipotential grounding
- A worker protection method that bonds all conductive parts the worker may contact to the same potential, so no hazardous voltage appears across the body during a fault.
- Three-phase power formula
- P equals the square root of three times line-to-line voltage times line current times power factor; used to compute feeder loading and transformer capacity.
- Per-unit impedance conversion
- New per-unit impedance equals old per-unit impedance times the ratio of new to old kVA base times the square of the ratio of old to new kV base.
- Skin effect
- At AC, current crowds toward the conductor surface, raising effective resistance above the DC value; it grows with frequency and conductor size.
- Pole setting depth
- A common rule sets burial depth at ten percent of pole length plus about 0.6 m (2 ft), adjusted for soil conditions and the loads the pole carries.
- NESC Grade B
- The higher-strength construction grade required at railroad and highway crossings, using greater safety factors on poles, guys, and conductors than Grade C.
- Guy lead angle
- The angle between the guy wire and the pole; about 45 degrees balances load, and leads flatter than 2:1 horizontal-to-vertical put excessive strain on the anchor.
- Pin versus suspension insulator
- Pin insulators are typically used up to about 33 kV; suspension strings are used at higher voltages, and each bell adds roughly 10 kV of wet flashover.
- Primary cable burial depth
- Typical minimum cover is about 1.05 m (3.5 ft) under roadways and 0.75 m (2.5 ft) in private rights-of-way, with greater depth at crossings.
- Stress cone
- A termination or splice component that shapes the electric field at the point where the cable shield is cut, preventing concentrated stress and insulation breakdown.
- Time-domain reflectometry
- A fault-locating method that sends a pulse down a cable and times the reflection; distance equals half the travel time times the propagation velocity.
- Cable pulling tension limit
- Manufacturer limits, often around 2,700 N (600 lbf) for jacketed primary cable, protect the insulation and shield from damage during installation.
- Transformer turns ratio
- The ratio of primary to secondary voltage equals the ratio of primary to secondary current; a 14.4 kV to 240 V unit has a 60:1 ratio.
- Open-delta bank capacity
- Two single-phase transformers in open delta deliver three-phase power at about 58 percent of the sum of their two nameplate ratings.
- Recloser versus sectionalizer
- A recloser interrupts fault current and recloses on a set sequence; a sectionalizer counts fault-current interruptions and opens only during a dead time.
- Voltage regulator step
- A step voltage regulator changes voltage in increments, commonly 0.625 percent per step over 32 steps, giving about plus or minus 10 percent control range.
- Fuse coordination
- The downstream fuse's minimum melting curve must lie below the upstream protective device's trip curve across the full range of fault currents.
- Class 2 rubber gloves
- Gloves rated for proof testing at 17 kV AC; they are used on circuits up to that voltage class with insulating cover installed and leather protectors worn.
- Leather protectors
- Worn over rubber insulating gloves to resist cuts, abrasion, and punctures; they add mechanical protection but no electrical insulation.
- Glove cover-up sequence
- Install insulating cover on conductors and insulators before contact, working from the nearest live part outward, so no exposed energized surface remains within reach.
- Hot stick distance
- Live-line tool work requires a minimum tool length between the worker and the energized part, commonly about 0.3 m per 100 kV plus a base distance.
- One-shot reclosing
- Setting the recloser to a single trip and reclose during energized work so a fault cannot repeatedly re-energize the line while workers are in contact.
- Faulted circuit indicator
- A device that senses and latches on fault current, letting crews narrow an outage to a section without patrolling the entire feeder.
- Cold-load pickup
- The inrush current when a feeder is re-energized and motors, heaters, and transformers draw above normal current; it can trip instantaneous protection.
- Blown fuse on three-phase bank
- A single blown fuse in a three-phase transformer bank causes voltage imbalance on the secondary and can overheat three-phase motors on the service.
- Voltage complaint isolation
- Measure voltage at the meter and at the transformer; low at the transformer means a supply problem, normal there means a service or customer-side fault.
- Bridle sling tension
- For two legs at angle theta from vertical, each leg tension equals half the load divided by the cosine of theta; flatter legs carry more tension.
- Insulating boom test
- The insulating section of an aerial device is dielectric-tested at intervals, commonly annually, and must pass before the device is used on energized lines.
- Load chart radius
- Lifting capacity is read at the actual boom radius and angle; capacity falls sharply as radius increases, so the chart must be consulted at the working position.
- Knot efficiency
- A knot reduces rope strength; a bowline retains roughly 60 to 70 percent of the rope's rated strength, so knots are avoided in critical lifts.