- Fall protection threshold
- On construction sites, fall protection is required at 3 m (10 ft) or more above a lower level; systems include guardrails, personal fall arrest with 100% tie-off, or safety nets.
- Ladder slope rule
- Extension ladders are set at a 4:1 slope (one unit out for every four units up), extend at least 1 m (3 ft) above the landing, and are secured at the top.
- Kettle fill limit
- Asphalt kettles are never filled above about 75% of capacity, must have a working thermometer and lid, and are kept at least 5 m (16 ft) from combustible material.
- Roofing nail specification
- Asphalt shingles require 11- or 12-gauge galvanized nails with a minimum 9.5 mm (3/8 in) head and 25 mm (1 in) penetration into the deck or through the sheathing.
- Hot-air welder calibration
- TPO and PVC seams are welded with a hot-air welder set to the manufacturer's temperature and speed; seam quality is confirmed by peel and probe tests, not by visual inspection.
- Slope ratio to percent
- Convert slope ratio to percent by multiplying by 100: a 4:12 slope equals 33.3%. Convert to degrees using the arctangent of the ratio, giving 18.4 degrees.
- Low-slope definition
- Low-slope roofing is a roof slope less than 2:12 (16.7%). Steep-slope roofing is 2:12 or greater, and this threshold determines which membrane or shingle system applies.
- Specification hierarchy
- The written specification governs over the drawings, and the manufacturer's published installation instructions govern over both when the specification is silent on a detail.
- Sheathing gap requirement
- Wood roof sheathing panels are spaced about 3 mm (1/8 in) apart at the edges to allow expansion and prevent buckling, and sheathing must be dry before roofing.
- Eave ice-dam membrane
- In cold climates, a self-adhering waterproofing membrane runs from the eave to at least 900 mm (36 in) inside the exterior wall line, with a drip edge installed over it.
- Built-up roofing plies
- Built-up roofing alternates layers of bitumen and reinforcing felt; a 4-ply system is common, and the finished membrane must be fully adhered with no voids.
- Torch-applied membrane safety
- Torch work on modified bitumen requires a hot-work permit, a fire extinguisher within 3 m, a fire watch, and a separation layer over combustible substrates such as wood or insulation.
- Single-ply attachment methods
- Single-ply membranes are fully adhered, mechanically attached, or ballasted; wind uplift resistance depends on the attachment method and the perimeter zone width.
- Shingle exposure
- Exposure is the exposed height of each shingle course; a standard 3-tab shingle uses a 143 mm (5 5/8 in) exposure, set by the manufacturer and determining courses per square.
- Wood shingle spacing
- Wood shingles and shakes are spaced 6-10 mm (1/4-3/8 in) apart to allow expansion and drainage, and are fastened with stainless steel or hot-dip galvanized nails.
- Standing seam minimum slope
- Standing seam metal roofing can be installed on slopes as low as 1:12 with a sealed seam, while exposed-fastener panels typically require a 3:12 slope or steeper.
- Step flashing installation
- At sidewalls, each shingle course receives a 100 x 100 mm (4 x 4 in) L-shaped flashing piece, overlapped 50 mm (2 in) by the next piece and covered by the shingle above.
- Counterflashing reglet
- Counterflashing is set into a reglet cut 25 mm (1 in) deep in masonry, sealed with compatible sealant, and overlaps the base flashing by at least 100 mm (4 in).
- Chimney cricket
- A cricket is required on the high side of a chimney wider than 750 mm (30 in) to divert water around the chimney and prevent ponding against the flashing.
- Ventilation ratio
- Attic ventilation requires 1:300 net free vent area to ceiling area, reduced to 1:150 when the vapour retarder is inadequate; intake and exhaust vents are balanced equally.
- Vapour barrier perm rating
- A material with a perm rating of 0.1 or less is a vapour barrier; a perm rating between 0.1 and 1.0 is a vapour retarder, and placement is on the warm side.
- Tapered insulation purpose
- Tapered insulation boards create the minimum 1:50 (2%) slope to drains on low-slope roofs, preventing ponding water that can void membrane warranties.
- Reroof over existing
- Reroofing over existing shingles is allowed only with one existing layer, a sound deck, and total weight within structural capacity; two layers is the usual maximum.
- Leak tracing
- Water travels along the deck, so leaks are traced uphill from the stain; flashings, valleys, and penetrations are checked before the membrane is replaced.
- BUR blister repair
- A blister in built-up roofing is cut out to sound membrane, the area dried, and patched with a new ply of felt and bitumen extending 100 mm (4 in) beyond the repair.
- Silica dust control
- Cutting tile, concrete, or fibre-cement with a power saw requires wet cutting or a dust-collection shroud plus a respirator; dry sweeping is prohibited on most sites.
- Membrane incompatibility
- EPDM is incompatible with asphalt, polystyrene insulation, and most oils; TPO and PVC are incompatible with asphalt and with each other, requiring separation layers.
- Valley metal width
- Open valleys use a 600 mm (24 in) wide metal pan centered on the valley line, installed over the underlayment and under the shingles, trimmed 75-100 mm (3-4 in) from center.
- Rafter length calculation
- Rafter length equals the plan run divided by the cosine of the slope angle, or the plan run multiplied by the slope factor, which is 1.054 for a 4:12 slope.
- Steel deck fastener penetration
- Insulation fasteners on low-slope roofs must penetrate the steel deck by at least 25 mm (1 in), or 19 mm (3/4 in) into wood, to develop the required pull-out capacity.
- Tile underlayment rule
- Clay and concrete tile require a minimum 3:12 slope for standard installation and a double underlayment on slopes below 4:12, with two fasteners per tile at the perimeter.
- Secondary roof drain
- A secondary or emergency drain or scupper is set at least 50 mm (2 in) above the primary drain so the roof can drain if the primary drain becomes blocked.