Red Seal Roofer study plan
Red Seal Roofer · Give each week a clear focus.
8 weeks · About 7 hours per week
Occupational Safety and Environmental Protection & Low-Slope Roofing Systems (Built-Up, Modified Bitumen, Single-Ply)
List the fall-protection hierarchy and state the trigger height and equipment checks for each control
Identify the six hazard classes on a roofing site (falls, ladders, electrical, heat/cold, chemical, housekeeping) and write one control per class
Explain safe handling and storage of asphalt, solvents, adhesives, and propane, including SDS use and WHMIS labels
Describe low-slope membrane families (built-up, modified bitumen, single-ply) and match each to its typical attachment method
Sequence a built-up roof laydown: deck prep, insulation, base sheet, plies, surfacing
Your checkpoint
One-page hazard-control sheet covering all six hazard classes plus a labeled sketch of built-up roof layer sequence
Low-Slope Roofing Systems (Built-Up, Modified Bitumen, Single-Ply) & Tools, Equipment, Materials, and Fasteners
Compare APP and SBS modified bitumen and state where each is preferred
Detail torch-applied safety: clearance, fire watch, extinguisher type, and membrane overlap widths
Identify TPO, PVC, and EPDM characteristics and their seaming methods (heat weld vs. adhesive)
Select fasteners and plates for a given deck type and explain pull-out and wind-uplift considerations
Demonstrate correct use and daily inspection of kettles, hot-air welders, and torches
Your checkpoint
Comparison table of five low-slope membrane systems with attachment, seaming, and safety notes
Low-Slope Roofing Systems (Built-Up, Modified Bitumen, Single-Ply) & Flashing, Drainage, and Waterproofing Details
Lay out membrane terminations at parapets, curbs, and drains with correct base and counterflashing heights
Explain the purpose and construction of a cant strip and fillet at inside corners
Describe drain, scupper, and overflow detailing and the role of a sump pan
Calculate required membrane overlap and end-lap stagger for a given roof area
Identify common low-slope leak paths at penetrations and describe the repair sequence
Your checkpoint
Annotated detail sheet with at least four hand-drawn flashing conditions (parapet, curb, drain, penetration)
Steep-Slope Roofing Systems (Asphalt Shingle, Wood Shingle/Shake, Tile, Metal) & Roofing Drawings, Specifications, and Layout
Interpret plan, elevation, and section views to locate ridges, valleys, and penetrations
Read a specification section and extract slope, underlayment, and fastener requirements
Explain asphalt shingle installation: starter course, exposure, nailing zone, and valley treatment
Describe ice-dam protection and underlayment requirements at eaves in cold climates
Perform a roof takeoff from a simple plan to estimate shingle bundles, underlayment, and fasteners
Your checkpoint
Completed takeoff with material quantities and a written justification citing the specification clauses used
Steep-Slope Roofing Systems (Asphalt Shingle, Wood Shingle/Shake, Tile, Metal) & Roof Deck and Substrate Preparation
Detail wood shingle and shake installation including exposure, spacing, and fastener type
Explain tile and slate installation: battens, fasteners, headlap, and load considerations
Describe metal roofing: panel types, clip spacing, thermal movement, and fastener placement
Evaluate deck and substrate readiness: sheathing thickness, spacing, nailing pattern, and flatness tolerances
Identify when a deck must be repaired or replaced before reroofing
Your checkpoint
Deck-readiness checklist plus a one-page summary comparing fastener and exposure rules across shingle, shake, tile, and metal
Flashing, Drainage, and Waterproofing Details & Roof Insulation, Ventilation, and Moisture Control
Detail step flashing at sidewalls and the correct shingle-to-flashing integration
Explain valley flashing types (open, woven, closed-cut) and when each applies
Describe ventilation math: net free area, intake-to-exhaust balance, and baffle placement
Explain vapor retarder placement and the difference between vented and unvented assemblies
Identify condensation risk conditions and describe how to correct them
Your checkpoint
Ventilation calculation worksheet for a sample attic with net free area, intake, and exhaust values plus a moisture-control summary
Repair, Maintenance, and Reroofing & Occupational Safety and Environmental Protection
Diagnose leaks from interior staining and map them to likely exterior sources
Write a repair procedure for a failed flashing, a torn membrane, and a lifted shingle
Plan a reroof: tear-off vs. overlay decision, disposal, and occupant protection
Apply environmental rules for asphalt waste, solvent disposal, and dust control
Build a preventive maintenance inspection checklist by roof type
Your checkpoint
Two-page reroof and repair plan covering diagnosis, procedure, disposal, and a maintenance checklist
Low-Slope Roofing Systems (Built-Up, Modified Bitumen, Single-Ply) & Steep-Slope Roofing Systems (Asphalt Shingle, Wood Shingle/Shake, Tile, Metal) & Flashing, Drainage, and Waterproofing Details
Review all weak areas flagged in earlier weeks and re-explain each from memory
Complete timed practice sets weighted to the 15% domains and log every error with its cause
Recite key numbers (overlaps, exposures, clearances, net free area) without notes
Walk through five full detail scenarios end to end as if explaining to an apprentice
Your checkpoint
Error log with at least 30 entries and a one-page personal cheat sheet of numbers and details
Milestones
Week 2: Score at least 70% on a 30-question self-quiz covering safety and low-slope systems, with no safety item missed twice
Week 4: Produce a takeoff and detail sheet that an experienced roofer would accept without correction on quantities or flashing heights
Week 6: Complete the ventilation worksheet and solve three flashing scenarios cold, scoring at least 80% on a mixed 40-question set
Week 8: Score at least 80% on a full-length timed mock exam weighted by domain percentage, with every missed item explained in the error log