CA Water Operator · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Source Water and Water Quality & Treatment Processes (Coagulation, Flocculation, Sedimentation, Filtration)

  • Diagram the source-to-tap flow for one surface water and one groundwater system, labeling every treatment barrier and the regulatory driver behind each.

  • Build a one-page reference table of California primary and secondary MCLs for the 15 most commonly tested contaminants, including the monitoring frequency for each.

  • Classify 10 given contaminants as point-source or nonpoint-source, and state which treatment process is most effective against each.

  • Solve 15 mass-balance and blending problems where two source waters are combined to meet an MCL, showing units at every step.

Your checkpoint

Completed MCL/contaminant reference sheet plus a 15-problem worked calculation set scored at 80% or higher.

Week 2

Treatment Processes (Coagulation, Flocculation, Sedimentation, Filtration)

  • Draw and label the coagulation-flocculation-sedimentation-filtration train, stating the percent removal target for turbidity and TOC at each unit.

  • Given raw turbidity, pH, alkalinity, and TOC, select a coagulant and justify dose and pH adjustments using jar-test logic.

  • Calculate surface overflow rate, weir loading, detention time, and filter loading rate (gpm/ft2) across 12 practice problems.

  • Interpret an actual filter run curve to identify breakthrough, terminal headloss, and the trigger point for filter-to-waste.

  • State the backwash rate, bed expansion, and duration parameters for a mixed-media filter and explain the causes of mudballs and air binding.

Your checkpoint

A labeled process-train diagram with unit-by-unit removal targets and a 12-problem treatment calculations packet, all correct within rounding.

Week 3

Disinfection and Disinfection Byproducts

  • Compare free chlorine, chloramine, ozone, chlorine dioxide, and UV on CT credit, DBP formation potential, and log-credit for Giardia and viruses.

  • Calculate CT required versus CT achieved for 10 scenarios varying pH, temperature, and residual, and state compliance in each case.

  • Compute the locational running annual average for TTHM and HAA5 from four quarters of data at four monitoring sites and identify any exceedance.

  • Outline the TOC removal ratio requirement and list three operational precursor-control strategies for a conventional plant.

  • Describe nitrification in a chloraminated system: leading indicators, monitoring locations, and three corrective actions in order of preference.

Your checkpoint

A 10-scenario CT compliance worksheet plus a completed 4-site x 4-quarter LRAA table with exceedance findings written up.

Week 4

Distribution System Operations, Storage, and Cross-Connection Control

  • Diagram a distribution system with pressure zones, storage, and booster pumping, and label the minimum and maximum operating pressure limits.

  • Build a device-selection matrix distinguishing backsiphonage from backpressure, and place RPZ, DCVA, PVB, and AVB assemblies in the applications where each is permitted.

  • Calculate chlorine residual decay and water age across a service area, then prescribe a flushing sequence with target residual endpoints.

  • Compute required storage volume, fire flow, and equalization capacity for a stated demand scenario, showing the peaking factor used.

  • Walk a mock sanitary survey and record at least 15 potential contamination pathways or defects with the corrective action for each.

Your checkpoint

A 15-scenario cross-connection device-selection matrix plus a completed sanitary survey defect checklist with corrective actions.

Week 5

Distribution System Operations, Storage, and Cross-Connection Control & Pumps, Motors, Meters, and Instrumentation

  • Solve 15 pump problems covering total dynamic head, brake horsepower, wire-to-water efficiency, and motor loading, keeping units explicit.

  • Plot a system curve against a pump curve to locate the operating point, then predict the new operating point after an impeller trim or VFD speed change.

  • Diagnose cavitation, air binding, and insufficient NPSH margin from three given symptom sets, and recommend a fix for each.

  • Compare magnetic, ultrasonic, venturi, and positive-displacement meters on accuracy, installation requirements, and calibration method.

  • Trace a full instrument loop from sensor to transmitter to controller to SCADA, and state the calibration interval and field-verification method for each device type.

Your checkpoint

A 15-problem pump and motor calculation packet plus a pump-curve worksheet showing the original and shifted operating points.

Week 6

Pumps, Motors, Meters, and Instrumentation & Regulations, Monitoring, Reporting, and Safety

  • Solve 10 electrical problems covering amperage, voltage unbalance, power factor correction, and energy cost per acre-foot pumped.

  • Specify the field calibration procedure and acceptance criteria for a turbidimeter, pH probe, residual chlorine analyzer, and level sensor.

  • Build a 12-month compliance calendar listing every bacteriological, DBP, lead and copper, and CCR deadline with the responsible party and the sample count.

  • Map the Tier 1, Tier 2, and Tier 3 public notice triggers and the required delivery timeframe and content for each tier.

  • List the permit-required confined space entry steps and the chlorine gas emergency response sequence, including the concentration thresholds that drive evacuation.

Your checkpoint

A 12-month compliance calendar plus a Tier 1/2/3 public notice decision flowchart with required timeframes marked.

Week 7

Regulations, Monitoring, Reporting, and Safety & Source Water and Water Quality

  • Complete a full-length 100-question practice exam under timed conditions and log every miss by domain and by cause (knowledge gap, misread, math error).

  • Re-teach the two lowest-scoring domains using the error log, rewriting each missed concept in your own words.

  • Rehearse three safety scenarios (chlorine leak, confined space rescue, trench excavation) and write the required notifications and shutdown steps for each.

  • Explain the reporting chain from sample collection through chain of custody to the state database, including holding times and preservation for three sample types.

Your checkpoint

A scored practice exam at 75% or higher with a written error log that categorizes every miss by domain and cause, plus a remediation summary for the two weakest domains.

Week 8

Source Water and Water Quality & Treatment Processes (Coagulation, Flocculation, Sedimentation, Filtration) & Disinfection and Disinfection Byproducts & Distribution System Operations, Storage, and Cross-Connection Control & Pumps, Motors, Meters, and Instrumentation & Regulations, Monitoring, Reporting, and Safety

  • Retake every previously missed item and take a second full-length exam, targeting 85% or higher.

  • Write the complete formula sheet from memory, then check it against notes and correct gaps.

  • Run three timed 20-minute calculation drills covering dosage, CT, filter loading, and pump horsepower.

  • Recite from memory the MCL values, public notice tiers, and cross-connection device applications without notes.

Your checkpoint

Second full-length exam scored at 85% or higher plus a one-page formula and mnemonic sheet written from memory.

Milestones

Week 2: Can complete the 12 treatment-calculation problems with correct units and no formula sheet; process-train diagram is reproducible from memory.

Week 4: Score 80% or higher on a self-made 40-question mixed quiz drawn from Domains 1 through 4 only.

Week 6: Compliance calendar and public notice flowchart are complete enough to answer any reporting-deadline question without notes.

Week 8: Second full-length practice exam at 85% or higher, with no domain scoring below 75%.