CESSWI key terms
CESSWI · Get comfortable with the vocabulary.
- Inspection Report
- Related: Photo Documentation, Notice of Deficiency, Field Notes
A written record of a site walk that lists conditions observed, the date and location of each finding, whether each required control was working, and the corrective actions and deadlines assigned.
- Field Notes
- Related: Inspection Report, Photo Documentation
Handwritten or electronic notes taken during site visits that capture time, weather, locations, observations, and conversations, forming the raw evidence later used to write formal reports.
- Photo Documentation
- Related: Geotag, Inspection Report
A dated series of photographs taken from consistent reference points to show site conditions before, during, and after construction, used to verify compliance and support enforcement decisions.
- Geotag
- Related: Photo Documentation
Location data automatically attached to a digital photo or file that records where and when it was captured, helping confirm that images match the correct site feature.
- Site Plan
- Related: As-Built Drawing, SWPPP
A scaled drawing showing property boundaries, buildings, drainage patterns, and the location of planned and installed stormwater controls, used to compare actual conditions with the approved design.
- As-Built Drawing
- Related: Site Plan
A drawing revised after construction to show the actual dimensions, locations, and elevations of installed features, including any stormwater controls that differ from the original design.
- Notice of Deficiency
- Related: Inspection Report, Escalation
A written notice telling the responsible party that a specific control is missing, damaged, or failing, and stating what must be fixed and by when.
- Pre-construction Meeting
- Related: SWPPP, Toolbox Talk
A meeting before earthwork begins where the owner, contractor, and inspector review the stormwater plan, inspection schedule, responsibilities, and procedures for reporting and correcting problems.
- Toolbox Talk
- Related: Pre-construction Meeting
A short, informal safety or compliance briefing held with the crew at the start of a shift to cover a single topic such as inlet protection or working near traffic.
- Notice of Violation
- Related: Escalation, Notice of Deficiency
A formal written document issued by a regulator stating that a permit condition has been broken, identifying the required corrective action and any penalties that may follow.
- Escalation
- Related: Notice of Violation, Notice of Deficiency
The documented process of moving an unresolved problem to a higher level of authority, such as a supervisor, owner, or permitting agency, when site personnel do not correct it.
- Active Listening
- Related: Toolbox Talk, Escalation
A communication technique of giving full attention, restating what the other person said, and asking clarifying questions so that instructions and concerns are understood correctly.
- PPE
- Related: Safety Data Sheet, Heat Stress
Personal protective equipment such as hard hats, safety glasses, gloves, boots, high-visibility vests, and hearing protection worn to reduce exposure to workplace hazards.
- Safety Data Sheet
- Related: PPE
A standardized document from a product manufacturer that lists a chemical's hazards, safe handling practices, first-aid measures, and spill response steps.
- Poison Ivy
- Related: Tick-borne Illness, PPE
A climbing or trailing plant with three glossy leaflets that causes an itchy rash on contact with its oil; inspectors should avoid touching it and wash exposed skin.
- Tick-borne Illness
- Related: Poison Ivy, PPE
Diseases such as Lyme disease spread by tick bites received in tall grass and brush; prevention includes repellent, long clothing, and full-body checks after field work.
- Heat Stress
- Related: PPE
A range of conditions from heat cramps to heat stroke caused by working in hot weather; prevention includes water, rest breaks, shade, and watching coworkers for symptoms.
- BMP
- Related: Silt Fence, Sediment Basin, SWPPP
A practice, structure, or device used to prevent pollutants from leaving a site, either by keeping soil in place or by capturing sediment before runoff leaves the property.
- Silt Fence
- Related: Inlet Protection, BMP
A temporary barrier of fabric supported by posts, installed along a level contour to slow sheet flow and pond muddy water so sediment settles out before discharge.
- Sediment Basin
- Related: Check Dam, Turbidity
A constructed pond that holds runoff long enough for soil particles to settle, with a controlled outlet that releases clearer water downstream.
- Check Dam
- Related: Diversion Swale, Sediment Basin
A small barrier of rock, wood, or fabric placed across a swale or ditch to reduce flow velocity, prevent channel erosion, and allow sediment to settle behind it.
- Inlet Protection
- Related: Silt Fence, Stabilized Construction Entrance
A temporary filter of gravel, fabric, or block placed around or over a storm drain inlet to keep sediment out of the drainage system during construction.
- Erosion Control Blanket
- Related: Hydroseeding, Final Stabilization
A manufactured mat of straw, wood, or synthetic fibers laid over bare soil to shield it from rain and wind while vegetation becomes established.
- Hydroseeding
- Related: Erosion Control Blanket, Final Stabilization
Applying a wet mixture of seed, mulch, fertilizer, and binder through a spray nozzle to establish vegetation quickly on slopes and disturbed ground.
- Stabilized Construction Entrance
- Related: Inlet Protection, BMP
A pad of coarse aggregate at the site exit where vehicle tires are shaken clean so mud and sediment are not tracked onto public roads.
- Diversion Swale
- Related: Check Dam, Riprap
A shallow channel or berm built upslope of disturbed areas to intercept and carry clean runoff around the work area, reducing the water that must be managed.
- Riprap
- Related: Diversion Swale, Outfall
A layer of durable rock placed on slopes, channels, or outfalls to absorb energy from flowing water and prevent soil erosion.
- Final Stabilization
- Related: Hydroseeding, Erosion Control Blanket
The condition in which a disturbed area is permanently covered with vegetation or another approved cover, so that erosion is controlled and the site no longer needs routine maintenance.
- SWPPP
- Related: BMP, NPDES, Inspection Report
A site-specific plan describing the pollution sources, the controls that will be installed and maintained, inspection schedules, and the individuals responsible for carrying out the plan.
- NPDES
- Related: SWPPP, MS4
The federal permitting program that regulates point-source discharges of pollutants to waters of the United States, including stormwater from construction sites above a size threshold.
- MS4
- Related: Illicit Discharge, Outfall
A municipal separate storm sewer system: a publicly owned network of gutters, pipes, and ditches that carries stormwater and is regulated under a permit.
- Illicit Discharge
- Related: Outfall, MS4
Any flow into a storm sewer that is not composed entirely of stormwater, such as wash water, sewage, or chemical spills, and that is not covered by a permit.
- Outfall
- Related: Illicit Discharge, Turbidity
The point where a storm sewer, ditch, or basin discharges into a stream, wetland, or other receiving water, often a focus of inspection and sampling.
- Detention Basin
- Related: Infiltration, Turbidity
A basin that temporarily stores stormwater and releases it slowly through an outlet, reducing peak flows and allowing sediment to settle after a storm.
- Infiltration
- Related: Detention Basin, Final Stabilization
The downward movement of water into soil, which can be promoted by porous pavement, trenches, or basins to reduce runoff volume and recharge groundwater.
- Turbidity
- Related: Sediment Basin, Outfall
A measure of how cloudy water is due to suspended soil or other particles; high readings at a discharge point indicate that sediment controls are not working.