Inspection Report

A written record of a site walk that lists conditions observed, the date and location of each finding, whether each required control was working, and the corrective actions and deadlines assigned.

Related: Photo Documentation, Notice of Deficiency, Field Notes
Field Notes

Handwritten or electronic notes taken during site visits that capture time, weather, locations, observations, and conversations, forming the raw evidence later used to write formal reports.

Related: Inspection Report, Photo Documentation
Photo Documentation

A dated series of photographs taken from consistent reference points to show site conditions before, during, and after construction, used to verify compliance and support enforcement decisions.

Related: Geotag, Inspection Report
Geotag

Location data automatically attached to a digital photo or file that records where and when it was captured, helping confirm that images match the correct site feature.

Related: Photo Documentation
Site Plan

A scaled drawing showing property boundaries, buildings, drainage patterns, and the location of planned and installed stormwater controls, used to compare actual conditions with the approved design.

Related: As-Built Drawing, SWPPP
As-Built Drawing

A drawing revised after construction to show the actual dimensions, locations, and elevations of installed features, including any stormwater controls that differ from the original design.

Related: Site Plan
Notice of Deficiency

A written notice telling the responsible party that a specific control is missing, damaged, or failing, and stating what must be fixed and by when.

Related: Inspection Report, Escalation
Pre-construction Meeting

A meeting before earthwork begins where the owner, contractor, and inspector review the stormwater plan, inspection schedule, responsibilities, and procedures for reporting and correcting problems.

Related: SWPPP, Toolbox Talk
Toolbox Talk

A short, informal safety or compliance briefing held with the crew at the start of a shift to cover a single topic such as inlet protection or working near traffic.

Related: Pre-construction Meeting
Notice of Violation

A formal written document issued by a regulator stating that a permit condition has been broken, identifying the required corrective action and any penalties that may follow.

Related: Escalation, Notice of Deficiency
Escalation

The documented process of moving an unresolved problem to a higher level of authority, such as a supervisor, owner, or permitting agency, when site personnel do not correct it.

Related: Notice of Violation, Notice of Deficiency
Active Listening

A communication technique of giving full attention, restating what the other person said, and asking clarifying questions so that instructions and concerns are understood correctly.

Related: Toolbox Talk, Escalation
PPE

Personal protective equipment such as hard hats, safety glasses, gloves, boots, high-visibility vests, and hearing protection worn to reduce exposure to workplace hazards.

Related: Safety Data Sheet, Heat Stress
Safety Data Sheet

A standardized document from a product manufacturer that lists a chemical's hazards, safe handling practices, first-aid measures, and spill response steps.

Related: PPE
Poison Ivy

A climbing or trailing plant with three glossy leaflets that causes an itchy rash on contact with its oil; inspectors should avoid touching it and wash exposed skin.

Related: Tick-borne Illness, PPE
Tick-borne Illness

Diseases such as Lyme disease spread by tick bites received in tall grass and brush; prevention includes repellent, long clothing, and full-body checks after field work.

Related: Poison Ivy, PPE
Heat Stress

A range of conditions from heat cramps to heat stroke caused by working in hot weather; prevention includes water, rest breaks, shade, and watching coworkers for symptoms.

Related: PPE
BMP

A practice, structure, or device used to prevent pollutants from leaving a site, either by keeping soil in place or by capturing sediment before runoff leaves the property.

Related: Silt Fence, Sediment Basin, SWPPP
Silt Fence

A temporary barrier of fabric supported by posts, installed along a level contour to slow sheet flow and pond muddy water so sediment settles out before discharge.

Related: Inlet Protection, BMP
Sediment Basin

A constructed pond that holds runoff long enough for soil particles to settle, with a controlled outlet that releases clearer water downstream.

Related: Check Dam, Turbidity
Check Dam

A small barrier of rock, wood, or fabric placed across a swale or ditch to reduce flow velocity, prevent channel erosion, and allow sediment to settle behind it.

Related: Diversion Swale, Sediment Basin
Inlet Protection

A temporary filter of gravel, fabric, or block placed around or over a storm drain inlet to keep sediment out of the drainage system during construction.

Related: Silt Fence, Stabilized Construction Entrance
Erosion Control Blanket

A manufactured mat of straw, wood, or synthetic fibers laid over bare soil to shield it from rain and wind while vegetation becomes established.

Related: Hydroseeding, Final Stabilization
Hydroseeding

Applying a wet mixture of seed, mulch, fertilizer, and binder through a spray nozzle to establish vegetation quickly on slopes and disturbed ground.

Related: Erosion Control Blanket, Final Stabilization
Stabilized Construction Entrance

A pad of coarse aggregate at the site exit where vehicle tires are shaken clean so mud and sediment are not tracked onto public roads.

Related: Inlet Protection, BMP
Diversion Swale

A shallow channel or berm built upslope of disturbed areas to intercept and carry clean runoff around the work area, reducing the water that must be managed.

Related: Check Dam, Riprap
Riprap

A layer of durable rock placed on slopes, channels, or outfalls to absorb energy from flowing water and prevent soil erosion.

Related: Diversion Swale, Outfall
Final Stabilization

The condition in which a disturbed area is permanently covered with vegetation or another approved cover, so that erosion is controlled and the site no longer needs routine maintenance.

Related: Hydroseeding, Erosion Control Blanket
SWPPP

A site-specific plan describing the pollution sources, the controls that will be installed and maintained, inspection schedules, and the individuals responsible for carrying out the plan.

Related: BMP, NPDES, Inspection Report
NPDES

The federal permitting program that regulates point-source discharges of pollutants to waters of the United States, including stormwater from construction sites above a size threshold.

Related: SWPPP, MS4
MS4

A municipal separate storm sewer system: a publicly owned network of gutters, pipes, and ditches that carries stormwater and is regulated under a permit.

Related: Illicit Discharge, Outfall
Illicit Discharge

Any flow into a storm sewer that is not composed entirely of stormwater, such as wash water, sewage, or chemical spills, and that is not covered by a permit.

Related: Outfall, MS4
Outfall

The point where a storm sewer, ditch, or basin discharges into a stream, wetland, or other receiving water, often a focus of inspection and sampling.

Related: Illicit Discharge, Turbidity
Detention Basin

A basin that temporarily stores stormwater and releases it slowly through an outlet, reducing peak flows and allowing sediment to settle after a storm.

Related: Infiltration, Turbidity
Infiltration

The downward movement of water into soil, which can be promoted by porous pavement, trenches, or basins to reduce runoff volume and recharge groundwater.

Related: Detention Basin, Final Stabilization
Turbidity

A measure of how cloudy water is due to suspended soil or other particles; high readings at a discharge point indicate that sediment controls are not working.

Related: Sediment Basin, Outfall