CHFM · Get comfortable with the vocabulary.

Master Facility Plan

A long-range planning document that matches the organization's buildings, space, and infrastructure needs to its strategic and clinical goals, typically looking five to ten years ahead and guiding capital spending.

Related: Capital Budget, Capital Replacement Plan
Certificate of Need (CON)

A state regulatory approval required before certain healthcare construction projects or new services can proceed; it confirms demonstrated community need and may be tied to licensure.

Related: Certificate of Occupancy, Master Facility Plan
Pre-Construction Risk Assessment (PCRA)

A structured pre-construction review that identifies risks construction poses to patients, staff, and ongoing operations and sets controls such as utility shutdown plans, barriers, and noise limits.

Related: Infection Control Risk Assessment (ICRA), Interim Life Safety Measures (ILSM)
Infection Control Risk Assessment (ICRA)

A multidisciplinary process that classifies construction work by infection risk and specifies containment, traffic routing, cleaning, and monitoring measures to protect patients during building activity.

Related: Pre-Construction Risk Assessment (PCRA), Construction Containment Barrier
Construction Containment Barrier

A temporary enclosure-often rigid walls, sealed openings, and negative air pressure-that prevents dust, debris, and airborne organisms from reaching patient care areas during construction.

Related: Infection Control Risk Assessment (ICRA)
Commissioning

The documented process of verifying that building systems are designed, installed, tested, and operate according to the owner's requirements before acceptance and patient occupancy.

Related: Substantial Completion, Punch List
Substantial Completion

The project stage when work is finished enough for the owner to use the space for its intended purpose, with only minor punch-list items outstanding.

Related: Punch List, Commissioning
Punch List

A written roster of incomplete or defective work found during walkthroughs that the contractor must correct before final acceptance and final payment.

Related: Substantial Completion, Commissioning
Preventive Maintenance (PM)

Scheduled servicing of equipment and systems based on manufacturer recommendations, code, or reliability data, intended to prevent failures rather than respond to them.

Related: Computerized Maintenance Management System (CMMS), Work Order
Computerized Maintenance Management System (CMMS)

Software that stores asset records, work orders, maintenance schedules, labor, and parts so facility staff can plan, dispatch, track, and report maintenance work.

Related: Work Order, Preventive Maintenance (PM)
Work Order

A formal request and record authorizing maintenance or repair, capturing location, problem, labor, parts, and completion details for tracking and cost allocation.

Related: Computerized Maintenance Management System (CMMS), Preventive Maintenance (PM)
Deferred Maintenance

Needed repairs or replacements postponed because of budget or scheduling limits; the backlog raises failure risk, energy costs, and compliance exposure over time.

Related: Capital Replacement Plan, Asset Register
Asset Register

A maintained inventory of equipment and building components listing identifiers, location, age, condition, and maintenance history, used for planning replacements and budgeting.

Related: Computerized Maintenance Management System (CMMS), Deferred Maintenance
Water Management Plan

A documented program to control waterborne pathogens such as Legionella through hazard assessment, monitoring, treatment, and response procedures for building water systems.

Related: Preventive Maintenance (PM), Hazard Vulnerability Analysis (HVA)
Essential Electrical System

The part of a hospital's electrical distribution that supplies life safety, critical, and equipment branches during a utility outage, backed by generators and automatic transfer switches.

Related: Emergency Power Testing, Downtime Procedure
Downtime Procedure

A prewritten plan telling staff how to operate when a utility or building system fails, including who to notify, workarounds, monitoring, and restoration steps.

Related: Essential Electrical System, Emergency Operations Plan (EOP)
Operating Budget

The annual plan for day-to-day revenue and expenses such as salaries, supplies, utilities, and contracted services, used to control spending within the fiscal year.

Related: Capital Budget, Variance Analysis
Capital Budget

The approved plan for major purchases, construction, and equipment replacement that are usually depreciated over several years instead of expensed in one year.

Related: Operating Budget, Capital Replacement Plan
Capital Replacement Plan

A multiyear forecast of when building systems and equipment should be replaced, with estimated costs, used to fund renewal before failures or code problems occur.

Related: Deferred Maintenance, Capital Budget
Life Cycle Cost Analysis

A method of comparing options by adding acquisition, operating, maintenance, and disposal costs over an asset's useful life, often converted to present value.

Related: Net Present Value (NPV), Capital Replacement Plan
Net Present Value (NPV)

The current value of a project's future cash inflows and outflows after discounting them at a chosen rate; a positive result suggests the investment adds value.

Related: Life Cycle Cost Analysis, Return on Investment (ROI)
Return on Investment (ROI)

A ratio that compares the financial benefit or savings an investment produces with its cost, used to rank competing facility projects.

Related: Net Present Value (NPV), Life Cycle Cost Analysis
Variance Analysis

Comparing actual financial results with the budget and explaining differences caused by volume, price, or spending so managers can take corrective action.

Related: Operating Budget
Depreciation

The systematic allocation of an asset's cost as an expense over its useful life; it shapes replacement planning but is not a cash payment.

Related: Capital Budget, Capital Replacement Plan
Environment of Care (EOC)

The Joint Commission framework of standards covering safety, security, hazardous materials, fire safety, medical equipment, utilities, and construction to keep the care environment safe.

Related: Life Safety Code (NFPA 101), Statement of Conditions (SOC)
Conditions of Participation (CoPs)

Federal requirements hospitals must meet to participate in Medicare and Medicaid; CMS surveys compliance, and serious deficiencies can threaten payment and licensure.

Related: Accreditation Survey, Plan of Correction
Life Safety Code (NFPA 101)

A model life safety code adopted in whole or part by authorities, setting requirements for egress, fire barriers, sprinklers, and construction features that protect occupants in healthcare buildings.

Related: Interim Life Safety Measures (ILSM), Statement of Conditions (SOC)
NFPA 99 Health Care Facilities Code

A model code with risk-based requirements for medical gas, electrical, HVAC, and other systems in healthcare facilities, including testing and maintenance obligations.

Related: Essential Electrical System, Environment of Care (EOC)
Statement of Conditions (SOC)

A Joint Commission tool where an organization records its Life Safety Code compliance and documents any deficiencies with plans for improvement and target completion dates.

Related: Life Safety Code (NFPA 101), Plan of Correction
Plan of Correction

A written response to survey findings stating what will be fixed, who is responsible, when it will be done, and how recurrence will be prevented.

Related: Accreditation Survey, Conditions of Participation (CoPs)
Accreditation Survey

An onsite evaluation by an accrediting body such as The Joint Commission to judge whether standards are met; results can support Medicare deemed status.

Related: Environment of Care (EOC), Plan of Correction
Certificate of Occupancy

A local government document confirming that a building complies with applicable codes and may legally be occupied; new healthcare space needs it before patient use.

Related: Substantial Completion, Certificate of Need (CON)
Hazard Vulnerability Analysis (HVA)

A structured assessment ranking natural, technological, and human-caused hazards by probability and impact so emergency planning can focus on the greatest risks.

Related: Emergency Operations Plan (EOP), Water Management Plan
Emergency Operations Plan (EOP)

The organization's written all-hazards plan describing roles, communication, resources, and response actions for emergencies, including evacuation, sheltering, and continuity of care.

Related: Hazard Vulnerability Analysis (HVA), Incident Command System (ICS)
Incident Command System (ICS)

A standardized command structure with defined roles-incident commander, operations, planning, logistics, and finance-used to coordinate emergency response across departments and agencies.

Related: Emergency Operations Plan (EOP)
Interim Life Safety Measures (ILSM)

Temporary compensating actions such as extra fire patrols, signage, extinguishers, or staff training required when construction or a deficiency weakens normal fire protection.

Related: Life Safety Code (NFPA 101), Pre-Construction Risk Assessment (PCRA)
Defend in Place

A healthcare fire strategy that keeps patients in their rooms or smoke compartments and moves them only when necessary, relying on fire barriers and staff response.

Related: Life Safety Code (NFPA 101), Interim Life Safety Measures (ILSM)
Failure Mode and Effects Analysis (FMEA)

A proactive team method that lists how a process could fail, estimates severity and likelihood, and targets the highest-risk steps before harm occurs.

Related: Root Cause Analysis (RCA), Hazard Vulnerability Analysis (HVA)
Root Cause Analysis (RCA)

A structured review after a serious event that traces contributing factors and system weaknesses to identify changes that reduce the chance of recurrence.

Related: Failure Mode and Effects Analysis (FMEA)
Emergency Power Testing

Scheduled generator and transfer-switch tests, including monthly and annual load tests, that verify backup power will perform under real demand and meet code.

Related: Essential Electrical System, Downtime Procedure