CHFM key terms
CHFM · Get comfortable with the vocabulary.
- Master Facility Plan
- Related: Capital Budget, Capital Replacement Plan
A long-range planning document that matches the organization's buildings, space, and infrastructure needs to its strategic and clinical goals, typically looking five to ten years ahead and guiding capital spending.
- Certificate of Need (CON)
- Related: Certificate of Occupancy, Master Facility Plan
A state regulatory approval required before certain healthcare construction projects or new services can proceed; it confirms demonstrated community need and may be tied to licensure.
- Pre-Construction Risk Assessment (PCRA)
- Related: Infection Control Risk Assessment (ICRA), Interim Life Safety Measures (ILSM)
A structured pre-construction review that identifies risks construction poses to patients, staff, and ongoing operations and sets controls such as utility shutdown plans, barriers, and noise limits.
- Infection Control Risk Assessment (ICRA)
- Related: Pre-Construction Risk Assessment (PCRA), Construction Containment Barrier
A multidisciplinary process that classifies construction work by infection risk and specifies containment, traffic routing, cleaning, and monitoring measures to protect patients during building activity.
- Construction Containment Barrier
- Related: Infection Control Risk Assessment (ICRA)
A temporary enclosure-often rigid walls, sealed openings, and negative air pressure-that prevents dust, debris, and airborne organisms from reaching patient care areas during construction.
- Commissioning
- Related: Substantial Completion, Punch List
The documented process of verifying that building systems are designed, installed, tested, and operate according to the owner's requirements before acceptance and patient occupancy.
- Substantial Completion
- Related: Punch List, Commissioning
The project stage when work is finished enough for the owner to use the space for its intended purpose, with only minor punch-list items outstanding.
- Punch List
- Related: Substantial Completion, Commissioning
A written roster of incomplete or defective work found during walkthroughs that the contractor must correct before final acceptance and final payment.
- Preventive Maintenance (PM)
- Related: Computerized Maintenance Management System (CMMS), Work Order
Scheduled servicing of equipment and systems based on manufacturer recommendations, code, or reliability data, intended to prevent failures rather than respond to them.
- Computerized Maintenance Management System (CMMS)
- Related: Work Order, Preventive Maintenance (PM)
Software that stores asset records, work orders, maintenance schedules, labor, and parts so facility staff can plan, dispatch, track, and report maintenance work.
- Work Order
- Related: Computerized Maintenance Management System (CMMS), Preventive Maintenance (PM)
A formal request and record authorizing maintenance or repair, capturing location, problem, labor, parts, and completion details for tracking and cost allocation.
- Deferred Maintenance
- Related: Capital Replacement Plan, Asset Register
Needed repairs or replacements postponed because of budget or scheduling limits; the backlog raises failure risk, energy costs, and compliance exposure over time.
- Asset Register
- Related: Computerized Maintenance Management System (CMMS), Deferred Maintenance
A maintained inventory of equipment and building components listing identifiers, location, age, condition, and maintenance history, used for planning replacements and budgeting.
- Water Management Plan
- Related: Preventive Maintenance (PM), Hazard Vulnerability Analysis (HVA)
A documented program to control waterborne pathogens such as Legionella through hazard assessment, monitoring, treatment, and response procedures for building water systems.
- Essential Electrical System
- Related: Emergency Power Testing, Downtime Procedure
The part of a hospital's electrical distribution that supplies life safety, critical, and equipment branches during a utility outage, backed by generators and automatic transfer switches.
- Downtime Procedure
- Related: Essential Electrical System, Emergency Operations Plan (EOP)
A prewritten plan telling staff how to operate when a utility or building system fails, including who to notify, workarounds, monitoring, and restoration steps.
- Operating Budget
- Related: Capital Budget, Variance Analysis
The annual plan for day-to-day revenue and expenses such as salaries, supplies, utilities, and contracted services, used to control spending within the fiscal year.
- Capital Budget
- Related: Operating Budget, Capital Replacement Plan
The approved plan for major purchases, construction, and equipment replacement that are usually depreciated over several years instead of expensed in one year.
- Capital Replacement Plan
- Related: Deferred Maintenance, Capital Budget
A multiyear forecast of when building systems and equipment should be replaced, with estimated costs, used to fund renewal before failures or code problems occur.
- Life Cycle Cost Analysis
- Related: Net Present Value (NPV), Capital Replacement Plan
A method of comparing options by adding acquisition, operating, maintenance, and disposal costs over an asset's useful life, often converted to present value.
- Net Present Value (NPV)
- Related: Life Cycle Cost Analysis, Return on Investment (ROI)
The current value of a project's future cash inflows and outflows after discounting them at a chosen rate; a positive result suggests the investment adds value.
- Return on Investment (ROI)
- Related: Net Present Value (NPV), Life Cycle Cost Analysis
A ratio that compares the financial benefit or savings an investment produces with its cost, used to rank competing facility projects.
- Variance Analysis
- Related: Operating Budget
Comparing actual financial results with the budget and explaining differences caused by volume, price, or spending so managers can take corrective action.
- Depreciation
- Related: Capital Budget, Capital Replacement Plan
The systematic allocation of an asset's cost as an expense over its useful life; it shapes replacement planning but is not a cash payment.
- Environment of Care (EOC)
- Related: Life Safety Code (NFPA 101), Statement of Conditions (SOC)
The Joint Commission framework of standards covering safety, security, hazardous materials, fire safety, medical equipment, utilities, and construction to keep the care environment safe.
- Conditions of Participation (CoPs)
- Related: Accreditation Survey, Plan of Correction
Federal requirements hospitals must meet to participate in Medicare and Medicaid; CMS surveys compliance, and serious deficiencies can threaten payment and licensure.
- Life Safety Code (NFPA 101)
- Related: Interim Life Safety Measures (ILSM), Statement of Conditions (SOC)
A model life safety code adopted in whole or part by authorities, setting requirements for egress, fire barriers, sprinklers, and construction features that protect occupants in healthcare buildings.
- NFPA 99 Health Care Facilities Code
- Related: Essential Electrical System, Environment of Care (EOC)
A model code with risk-based requirements for medical gas, electrical, HVAC, and other systems in healthcare facilities, including testing and maintenance obligations.
- Statement of Conditions (SOC)
- Related: Life Safety Code (NFPA 101), Plan of Correction
A Joint Commission tool where an organization records its Life Safety Code compliance and documents any deficiencies with plans for improvement and target completion dates.
- Plan of Correction
- Related: Accreditation Survey, Conditions of Participation (CoPs)
A written response to survey findings stating what will be fixed, who is responsible, when it will be done, and how recurrence will be prevented.
- Accreditation Survey
- Related: Environment of Care (EOC), Plan of Correction
An onsite evaluation by an accrediting body such as The Joint Commission to judge whether standards are met; results can support Medicare deemed status.
- Certificate of Occupancy
- Related: Substantial Completion, Certificate of Need (CON)
A local government document confirming that a building complies with applicable codes and may legally be occupied; new healthcare space needs it before patient use.
- Hazard Vulnerability Analysis (HVA)
- Related: Emergency Operations Plan (EOP), Water Management Plan
A structured assessment ranking natural, technological, and human-caused hazards by probability and impact so emergency planning can focus on the greatest risks.
- Emergency Operations Plan (EOP)
- Related: Hazard Vulnerability Analysis (HVA), Incident Command System (ICS)
The organization's written all-hazards plan describing roles, communication, resources, and response actions for emergencies, including evacuation, sheltering, and continuity of care.
- Incident Command System (ICS)
- Related: Emergency Operations Plan (EOP)
A standardized command structure with defined roles-incident commander, operations, planning, logistics, and finance-used to coordinate emergency response across departments and agencies.
- Interim Life Safety Measures (ILSM)
- Related: Life Safety Code (NFPA 101), Pre-Construction Risk Assessment (PCRA)
Temporary compensating actions such as extra fire patrols, signage, extinguishers, or staff training required when construction or a deficiency weakens normal fire protection.
- Defend in Place
- Related: Life Safety Code (NFPA 101), Interim Life Safety Measures (ILSM)
A healthcare fire strategy that keeps patients in their rooms or smoke compartments and moves them only when necessary, relying on fire barriers and staff response.
- Failure Mode and Effects Analysis (FMEA)
- Related: Root Cause Analysis (RCA), Hazard Vulnerability Analysis (HVA)
A proactive team method that lists how a process could fail, estimates severity and likelihood, and targets the highest-risk steps before harm occurs.
- Root Cause Analysis (RCA)
- Related: Failure Mode and Effects Analysis (FMEA)
A structured review after a serious event that traces contributing factors and system weaknesses to identify changes that reduce the chance of recurrence.
- Emergency Power Testing
- Related: Essential Electrical System, Downtime Procedure
Scheduled generator and transfer-switch tests, including monthly and annual load tests, that verify backup power will perform under real demand and meet code.