CHFM study materials
CHFM study resources

CHFM study plan

CHFM · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Operations and Maintenance

  • Map every task area within Operations and Maintenance (maintenance strategies, work-order/CMMS workflow, utility systems, water management, HVAC, electrical, medical gas, elevators, grounds) onto a personal checklist and self-rate confidence 1-5 for each.

  • Define and contrast preventive, predictive, corrective, and reactive maintenance, and state the trigger that initiates each in a facility program.

  • Trace how a work request becomes a completed, documented, closed work order, naming the record created at each step.

  • Walk a familiar facility (or recall one) and record 15 observable O&M conditions, linking each to the specific program element that governs it.

Your checkpoint

A confidence-rated Domain 2 task-area map covering all listed areas plus a 15-item facility findings log with the governing program element named for each finding.

Week 2

Operations and Maintenance & Regulatory Compliance

  • Cross-map at least 20 O&M practices to the authority that requires them (CMS Conditions of Participation, Joint Commission standards, NFPA, EPA, OSHA, state and local codes).

  • Explain how a utility system risk assessment (criticality, redundancy, failure-mode consequence) sets maintenance frequency and spares strategy.

  • Compute MTBF, MTTR, and percentage of preventive maintenance completed from a sample work-order dataset, then state what each result implies for reliability.

  • Answer 40 practice items spanning Domains 2 and 4 and log every miss with the underlying concept rather than the question text.

Your checkpoint

A two-column crosswalk table of at least 20 rows (O&M practice to requiring authority) plus a written MTBF/MTTR/%PM calculation set with interpretation.

Week 3

Regulatory Compliance

  • Build a citation table for the standards most heavily tested, including NFPA 101, NFPA 99, NFPA 25, NFPA 72, NFPA 110, CMS Conditions of Participation, and Joint Commission environment-of-care and life-safety standards.

  • Differentiate survey and enforcement types (CMS survey with deemed status through accreditation, accreditation survey cycle, state licensure inspection) and identify who enforces each.

  • Outline the plan-of-correction workflow from citation through root cause, corrective action, and evidence of sustained compliance.

  • Solve 30 scenario items on documentation requirements, equivalency or waiver requests, and interim life safety measures.

Your checkpoint

A one-page citation table with at least 15 entries plus a complete sample plan of correction written against one mock citation.

Week 4

Planning, Design, and Construction

  • Sequence a healthcare construction project from programming through design, construction, commissioning, and closeout, naming the facility manager's specific deliverable at each stage.

  • Apply a pre-construction risk assessment to a mock unit renovation, covering infection control, utility interruption, life safety, noise and vibration, and staging.

  • Read a floor plan and verify egress paths, exit access, and rated construction against stated occupancy assumptions.

  • Distinguish interim life safety measures required during construction from measures required in normal operations.

Your checkpoint

A mock pre-construction risk assessment packet for a 10-bed unit renovation with a risk classification and a written mitigation for each identified hazard, submitted before the week-4 milestone.

Week 5

Planning, Design, and Construction & Risk Management and Life Safety

  • Assemble a commissioning and closeout checklist covering O&M manuals, as-built drawings, staff training, punch list resolution, warranty start dates, and life safety drawing updates.

  • Apply the defend-in-place concept by explaining compartmentation, smoke compartments, and how renovation work alters them.

  • Calculate occupant load and required egress capacity for two worked examples and verify each answer against the governing method.

  • List the conditions that trigger interim life safety measures and at least six common interim measures with the situation each addresses.

Your checkpoint

A completed commissioning/closeout checklist plus two worked egress-capacity calculations with the verification method shown.

Week 6

Financial Management

  • Classify 10 real facility expenditures as capital or operating and state the rule used for each classification.

  • Compute simple payback, return on investment, and a life-cycle cost comparison for two competing equipment replacement options.

  • Explain depreciation, cost of capital, and how a facility business case is presented to executive leadership for funding approval.

  • Interpret a departmental budget-versus-actual variance report and identify the three largest drivers with a proposed response for each.

Your checkpoint

A one-page business case for a major equipment replacement that includes payback, life-cycle cost comparison, and the recommendation requested of leadership.

Week 7

Risk Management and Life Safety

  • Build a hazard vulnerability analysis scoring matrix and apply it to eight hazards, ranking them by risk.

  • Map the four emergency management phases (mitigation, preparedness, response, recovery) to concrete facility actions and to elements of the emergency operations plan.

  • Describe how the facility manager participates in a root cause analysis or failure mode analysis after a safety event.

  • Answer 30 scenario items on risk management, interim life safety, and emergency management, then rewrite each miss as a rule statement.

Your checkpoint

A scored hazard vulnerability analysis for eight hazards plus an interim life safety trigger-and-action table.

Week 8

Planning, Design, and Construction & Operations and Maintenance & Financial Management & Regulatory Compliance & Risk Management and Life Safety

  • Complete two full-length timed practice exams under test-day conditions and record scores by domain.

  • Re-drill every missed item from weeks 1 through 7 grouped by concept, not by question, until each concept is explained aloud without notes.

  • Recite from memory the one-page summary for each of the five domains, including the standards and formulas most likely to be tested.

  • Finalize exam-day logistics: appointment time, identification, testing location or remote setup, and a written pacing plan per domain.

Your checkpoint

Two scored full-length practice exams at or above 80 percent overall with no domain below 70 percent, plus a one-page weak-spots sheet showing each weak area remediated.

Milestones

Week 2: Complete a timed 40-item set covering Domains 2 and 4 and score at least 70 percent, with every miss converted into a written concept note.

Week 4: Score at least 75 percent on a 40-item set drawn from Domains 1, 2, and 4, and submit the mock pre-construction risk assessment packet for self-review against a written checklist.

Week 6: Score at least 75 percent on a 30-item set covering Domains 3 and 5, and confirm the equipment business case can be explained in five minutes without notes.

Week 8: Complete two full-length timed practice exams at or above 80 percent overall with no single domain below 70 percent, and confirm every item missed across all eight weeks has been re-explained correctly.