CMP study plan
CMP · Give each week a clear focus.
8 weeks · About 7 hours per week
Strategic Planning & Risk Management
Define the strategic planning cycle (mission, vision, goals, SMART objectives, SWOT) in your own words without notes
Classify 20 sample event risks as strategic, operational, financial, or hazard
Match each of the five risk response strategies (avoid, mitigate, transfer, accept, exploit) to two concrete meeting-industry examples
Rate your confidence 1-5 on all 10 domains and rank your three weakest
Your checkpoint
A one-page domain confidence heat map for all 10 domains plus a scored 15-question baseline quiz with the score recorded
Financial Management & Project Management
Build a program budget separating fixed, variable, and indirect cost lines
Calculate break-even attendance and cost per attendee from that budget
Decompose a 200-attendee conference into a WBS with at least 30 work packages
Identify the critical path and list two schedule risks that could consume float
Your checkpoint
A single-page budget and critical-path schedule for a mock 200-attendee conference, with break-even attendance computed
Event Design & Site Management
Map each session in a one-day program to a stated learning objective and audience need
Assemble a 25-item site inspection checklist covering capacity, accessibility, life safety, AV, and F&B
Evaluate one real venue against the checklist and record pass/fail per item
Outline an emergency action plan naming roles, triggers, and evacuation routes
Your checkpoint
A completed 25-item site inspection scorecard for one venue with a written book-or-reject recommendation
Human Resources & Stakeholder Management
Plot 12 stakeholders on an influence/interest grid and assign one engagement tactic to each
Construct a RACI matrix for a 6-person event team across 10 tasks
Draft four behavioral interview questions tied to specific event roles
Compare three conflict-resolution approaches and select one for a described team scenario
Your checkpoint
A stakeholder influence/interest grid plus a RACI matrix covering at least 12 stakeholders and 6 roles
Marketing & Communication
Write a one-page marketing plan stating positioning, target segments, channel mix, and budget split
Build a promotional calendar counting backwards from the event date with at least three touchpoints per segment
Draft a 10-row communication matrix naming audience, message, channel, owner, and timing
Write a 200-word crisis holding statement for a plausible event disruption
Your checkpoint
A one-page marketing plan and a 10-row communication matrix for a mock event, both with pre-event and on-site timelines
Strategic Planning & Financial Management
Convert three vague event objectives into SMART objectives with measurable targets
Run a forecast-to-actual variance analysis on the week 2 budget and flag every variance above 5%
Compute ROI, ROO, and cost per attendee from supplied figures and explain which metric each audience needs
Answer 30 scenario questions on strategic planning and financial management and correct every miss
Your checkpoint
A variance report comparing forecast to actual for the week 2 mock budget, plus an error log of at least 15 corrected items
Project Management & Risk Management
Re-sequence the 200-attendee conference under three new constraints and re-derive the critical path
Score 15 risks on a likelihood-by-impact matrix and assign an owner and trigger to the top five
Select and justify in one line the response strategy for each of the top five risks
Complete 30 timed scenario questions on project and risk management and correct every miss
Your checkpoint
A 15-line risk register with scores, owners, triggers, and a written response plan for the top five risks
Strategic Planning & Financial Management
Sit a full-length 150-question timed mock exam under exam conditions with no interruptions
Score the mock by domain and name the three lowest-scoring domains
Re-teach each weak area by rewriting the missed concept in your own words
Build a one-page exam-day strategy sheet covering time per question, flag-and-return rules, and guessing policy
Your checkpoint
A scored full-length mock exam with a domain-by-domain error analysis and a one-page exam-day strategy sheet
Milestones
Week 2: Mock budget and critical-path schedule complete with all arithmetic verified and at least 90% of line items traceable to a stated assumption
Week 4: Score 70% or higher on a 40-question mixed quiz covering Domains 1-8, with every miss tagged to its domain
Week 6: Score 75% or higher on a 30-question timed set for Domains 1 and 4, and finish the forecast-to-actual variance report
Week 8: Score 75% or higher overall on the full-length timed mock with no domain below 65%