- Transformational leadership four I's
- Idealized influence, inspirational motivation, intellectual stimulation, and individualized consideration. Transformational leaders raise followers' aspirations beyond self-interest, producing effort and performance beyond expectations.
- Herzberg two-factor theory
- Hygiene factors such as pay, policy, and working conditions prevent dissatisfaction but do not motivate. Motivators such as achievement, recognition, responsibility, and growth produce genuine satisfaction and sustained motivation.
- Lewin three-stage change model
- Unfreeze existing attitudes and behavior, introduce the change (transition), then refreeze the new state into norms and systems. Force-field analysis weighs driving against restraining forces before acting.
- Thomas-Kilmann conflict modes
- Five modes arrayed by assertiveness versus cooperativeness: competing, collaborating, compromising, avoiding, and accommodating. Collaborating seeks win-win and works best when the issue is important and time allows.
- Balanced Scorecard perspectives
- Four linked perspectives-financial, customer, internal business process, and learning and growth-that translate vision into objectives, measures, targets, and initiatives rather than relying on financial results alone.
- Hoshin Kanri policy deployment
- A Japanese strategic deployment method that cascades a few breakthrough annual objectives from top management to operating levels and returns results upward through catchball dialogue and periodic review.
- TOWS matrix
- A strategy-generation grid that pairs internal strengths and weaknesses with external opportunities and threats to produce SO, ST, WO, and WT strategic options for evaluation.
- SMART objectives
- Objectives that are specific, measurable, achievable, relevant, and time-bound. These five criteria make goals verifiable so that progress and completion can be assessed objectively.
- Juran trilogy
- Joseph Juran framed quality management as three universal processes: quality planning, quality control, and quality improvement, applied sequentially and repeatedly across the organization.
- Cost of poor quality
- Internal failure costs such as scrap and rework plus external failure costs such as returns, warranty, and liability. Prevention and appraisal spending is the cost of good quality.
- DMAIC cycle
- Six Sigma's five-phase improvement method: define the problem and critical-to-quality requirements, measure baseline performance, analyze root causes, improve the process, and control the gains.
- Seven wastes (TIMWOOD)
- Transport, inventory, motion, waiting, overproduction, over-processing, and defects. Lean improvement targets elimination of these non-value-adding activities from the process.
- Pareto principle
- Roughly 80 percent of effects come from 20 percent of causes. A Pareto chart ranks categories in descending frequency with a cumulative percentage line to direct improvement effort.
- Process capability index Cpk
- Cpk equals the smaller of (upper specification limit minus the mean) or (mean minus lower specification limit), divided by three sigma. It accounts for both spread and centering.
- Risk priority number (RPN)
- In failure mode and effects analysis, RPN equals severity times occurrence times detection, each rated from 1 to 10. Higher scores flag failure modes warranting priority corrective action.
- QFD house of quality
- A matrix converting voice-of-customer requirements into engineering characteristics, showing relationship strengths and competitive comparisons so design decisions are prioritized by customer importance.
- Kano model categories
- Customer requirements classed as must-be, performance, attractive, indifferent, or reverse. Must-be features cause dissatisfaction when absent; attractive features delight when present but are not expected.
- Critical-to-quality characteristics
- Measurable product or process attributes derived from customer needs that must meet specification for the customer to be satisfied; they anchor Six Sigma and QFD project selection.
- SERVQUAL five dimensions
- Reliability, assurance, tangibles, empathy, and responsiveness. Gaps between customer expectations and perceived service performance define where service quality falls short.
- Net Promoter Score
- Percentage of promoters rating 9 or 10 minus percentage of detractors rating 0 to 6 on a likelihood-to-recommend question. Passives rating 7 or 8 are excluded.
- Bullwhip effect
- Demand variability amplifies as orders move upstream in a supply chain. Sharing point-of-sale data, shortening lead times, and stabilizing order batching reduce the amplification.
- Dock-to-stock
- A program that receives supplier material directly into stock without incoming inspection, justified by a demonstrated supplier quality history and approved certification status.
- Supplier scorecard
- A periodic rating of suppliers on quality, delivery, cost, and responsiveness, used to drive corrective action, sourcing decisions, and long-term partnership development.
- Total cost of ownership
- All costs of acquiring and using a purchased item over its life-price, freight, inspection, inventory, defects, downtime, and disposal-rather than purchase price alone.
- ADDIE instructional model
- Five phases for training design: analysis, design, development, implementation, and evaluation. Evaluation results feed back into revision of the other four phases.
- Kirkpatrick four evaluation levels
- Reaction (participant satisfaction), learning (knowledge and skill gain), behavior (on-the-job application), and results (business impact). Higher levels are harder and costlier to measure.
- Training needs assessment levels
- Organizational analysis identifies where training is strategically needed, task analysis defines job requirements, and person analysis identifies which individuals need which specific instruction.
- Learning objective components
- A well-written objective states the condition under which performance occurs, the observable behavior or performance itself, and the criterion or standard for acceptable performance.
- Tuckman team stages
- Forming, storming, norming, performing, and adjourning. Teams typically pass through interpersonal conflict before establishing norms and reaching high performance.
- Nominal group technique
- A structured group method: members silently write ideas, take turns recording one idea each, clarify and discuss them, then rank or vote individually to select priorities.
- Consensus decision
- A decision everyone can support and commit to even when it is not each person's first choice; it differs from unanimity and from simple majority voting.
- Facilitator role
- The facilitator manages process-agenda, ground rules, participation, and time-while remaining neutral on content, so the team owns the decision and its outcome.