Registered Electrical Engineer (G&T) study materials
Registered Electrical Engineer (G&T) study resources

Registered Electrical Engineer (G&T): Generation and Transmission Electrical Engineering Practice

Registered Electrical Engineer (G&T) · Work through your exam, one topic at a time.

All guide sections

Generation and Transmission Electrical Engineering Practice

The Generation and Transmission Electrical Engineering Practice domain tests how well you can operate, plan, and troubleshoot the high-voltage bulk-power path from generator terminals to the transmission grid. Expect generator capability, grid-code obligations, transmission-line models, substation equipment, protection, and contingency analysis. The Philippine setting matters: a 60 Hz system, NGCP as transmission concessionaire and system operator, TransCo asset ownership, WESM dispatch, and ERC/DOE regulation.

Grid operation and planning

  • The grid must survive the loss of any single major element (N-1). Studies check thermal ratings, voltage limits, transient and voltage stability, and short-circuit duty.
  • Ancillary services include frequency regulation, spinning reserve, voltage/reactive support, and black start. Frequency is a system-wide balance problem; voltage is local and controlled by excitation, tap changers, capacitors, reactors, and line charging.
  • Transmission lines are modeled by series impedance and shunt admittance; long lines need distributed parameters. Transformer tap and phase shift affect power flow.

Generation and protection

A synchronous generator's capability curve is bounded by armature heating, field heating, and end-region heating. Governor droop and AVR response determine frequency and voltage. Unit and line protection commonly uses differential, distance, overcurrent, breaker-failure, and autoreclose schemes; CT/VT ratios and zones must be coordinated.

Worked example

A 230 kV, 50 km line has positive-sequence reactance 0.40 Ω/km. On 100 MVA, 230 kV bases: Zbase = 230²/100 = 529 Ω; line X = 20 Ω = 0.0378 pu. For a bolted three-phase fault at the remote end, ignore resistance and source impedance: Ipu = 1/0.0378 = 26.5 pu. Ibase = 100,000/(√3×230) = 251 A, so I = 26.5×251 ≈ 6.65 kA. Check directly: 230,000/(√3×20) ≈ 6.64 kA. The agreement confirms the base conversion.

Traps that cost marks

Using line-to-neutral voltage with a three-phase formula; forgetting to change transformer impedance to the chosen MVA base; treating voltage support as a system-wide reserve; ignoring N-1 or relay coordination; and mixing subtransient, transient, and steady-state reactances.