Registered Environmental Protection Engineer study materials
Registered Environmental Protection Engineer study resources

Registered Environmental Protection Engineer cheat sheet

Registered Environmental Protection Engineer · Keep the key ideas within reach.

Quick reference

Environmental Laws, Regulations, and Standards

  • China's Environmental Protection Law (2014 revision, effective 2015-01-01) establishes daily continuous penalties (按日计罚), public interest litigation, and environmental information disclosure obligations.

  • The Environmental Impact Assessment Law (2002, amended 2016 and 2018) requires EIA for planned projects; construction may not start before EIA approval, and unapproved construction triggers stop-work orders plus fines of 1-5% of total investment.

  • Pollutant discharge permitting under the 2021 Regulations on Administration of Pollutant Discharge Permits (排污许可管理条例) makes the permit the sole legal basis for discharge; operating without a permit is punishable by fines of 200,000-1,000,000 CNY and possible closure.

  • The Water Pollution Prevention and Control Law (2017 amendment) sets the total-load control system and drinking water source protection zones divided into first-grade (no discharge, no new construction) and second-grade (restricted discharge).

  • The Air Pollution Prevention and Control Law (2018 amendment) mandates ultra-low emission limits for key industries and joint regional prevention and control in key areas such as Beijing-Tianjin-Hebei.

  • The Solid Waste Law (2020 revision) bans imports of solid waste, requires a hazardous waste transfer manifest (转移联单), and imposes operator licensing for collection, storage, and disposal.

  • The Environmental Noise Pollution Prevention and Control Law (2021) classifies acoustic environment functional zones and sets night-time construction bans except for emergency or continuous-process work with approval.

  • The Soil Pollution Prevention and Control Law (2018) establishes soil pollution status surveys, risk screening and control, and the principle that the land-use right holder bears remediation responsibility.

Quick reference

Water Pollution Control and Wastewater Treatment

  • BOD5 removal efficiency = (S0 - Se) / S0 × 100%, where S0 and Se are influent and effluent BOD5 concentrations (mg/L).

  • The activated sludge process is controlled by sludge retention time (SRT), food-to-microorganism ratio (F/M), and mixed liquor suspended solids (MLSS); typical F/M for conventional aeration is 0.2-0.4 kg BOD5/(kg MLSS·d).

  • Hydraulic retention time HRT = V / Q; solids retention time SRT = (V·X) / (Qw·Xr + Qe·Xe) for a complete-mix system with wasting.

  • The sludge volume index SVI = (SV30 × 1000) / MLSS (mL/g); SVI of 80-150 mL/g indicates good settling, while SVI > 200 mL/g signals bulking.

  • A/O and A2/O processes remove nitrogen and phosphorus biologically; nitrification requires SRT long enough for slow-growing nitrifiers (typically >10-15 d at 15 °C) and dissolved oxygen ≥ 2 mg/L.

  • The Monod equation μ = μmax·S/(Ks + S) describes specific growth rate as a function of substrate concentration; Ks is the half-saturation constant.

  • Disinfection contact time is governed by CT = C × t (concentration × contact time); typical chlorine CT requirements for coliform inactivation are specified in discharge standards such as GB 18918-2002.

  • The discharge standard GB 18918-2002 Class 1-A limits: COD ≤ 50 mg/L, BOD5 ≤ 10 mg/L, SS ≤ 10 mg/L, NH3-N ≤ 5 mg/L, TP ≤ 0.5 mg/L.

Quick reference

Air Pollution Control and Air Quality Management

  • Particulate removal efficiency of a control device η = (Cin - Cout) / Cin × 100%; overall efficiency of series devices η_total = 1 - (1 - η1)(1 - η2)...

  • Cyclone collection efficiency increases with particle size, inlet velocity, and cyclone diameter reduction; cut diameter d50 scales approximately with the square root of gas flow per unit area.

  • Electrostatic precipitator (ESP) collection efficiency follows the Deutsch-Anderson equation η = 1 - exp(-A·ω/Q), where A is plate area, ω is migration velocity, and Q is gas flow.

  • Baghouse filters operate at air-to-cloth ratios typically 0.6-1.2 m/min for pulse-jet cleaning; pressure drop rises as dust cake builds and is reset by cleaning cycles.

  • Wet flue gas desulfurization (limestone-gypsum) achieves >95% SO2 removal; the stoichiometric ratio of CaCO3 to SO2 is about 1.0-1.05.

  • Selective catalytic reduction (SCR) of NOx uses NH3 over V2O5/TiO2 catalyst at 300-400 °C; the reaction 4NO + 4NH3 + O2 → 4N2 + 6H2O gives a 1:1 molar NH3:NO ratio.

  • The Air Quality Index (AQI) in China (HJ 633-2012) classifies six pollutants (PM2.5, PM10, SO2, NO2, CO, O3); AQI > 200 triggers mandatory emergency response measures.

  • Gaussian plume dispersion model: C(x,y,z) = Q/(2π·u·σy·σz)·exp(-y²/2σy²)·[exp(-(z-H)²/2σz²) + exp(-(z+H)²/2σz²)], where H is effective stack height.

Quick reference

Solid Waste and Hazardous Waste Management

  • Hazardous waste identification in China follows the National Hazardous Waste List (2021) plus the identification standards GB 5085.1-GB 5085.7 for corrosivity, toxicity, flammability, reactivity, and infectivity.

  • The hazardous waste manifest (转移联单) must accompany every transfer; generators must retain copies for at least 5 years and use licensed transporters and disposal facilities.

  • Sanitary landfill design requires a composite liner (typically HDPE geomembrane plus compacted clay), leachate collection, and a final cover; leachate generation is estimated by the water balance method.

  • The 3T principle for incineration: Temperature (≥850 °C for municipal waste, ≥1100 °C for hazardous waste), Time (≥2 s residence), and Turbulence, plus excess air for complete combustion.

  • Dioxin emission limit for hazardous waste incinerators under GB 18484-2020 is 0.1 ng TEQ/Nm³; municipal waste incinerators under GB 18485-2014 also use 0.1 ng TEQ/Nm³.

  • Landfill gas generation can be estimated by the IPCC first-order decay model: L0 = MCF × DOC × DOCf × F × 16/12, with decay constant k typically 0.05-0.1/yr for temperate regions.

  • Composting requires a C:N ratio of about 25-35:1, moisture 50-60%, and temperature 55-65 °C for thermophilic pathogen destruction.

  • The Basel Convention controls transboundary movements of hazardous wastes; China's import ban on solid waste took full effect on 2021-01-01.

Quick reference

Environmental Impact Assessment and Permitting

  • China's EIA classification (建设项目环境影响评价分类管理名录) divides projects into three categories: EIA report (报告书), EIA form (报告表), and registration form (登记表), based on impact severity.

  • The EIA process includes screening, scoping, baseline monitoring, impact prediction, mitigation, and public participation; public participation is mandatory for report-level projects (环境影响评价公众参与办法).

  • The 'three simultaneous' rule (三同时) requires pollution control facilities to be designed, constructed, and commissioned simultaneously with the main project.

  • Strategic environmental assessment (规划环境影响评价) applies to plans for industry, agriculture, energy, water, transport, and urban construction; it precedes project-level EIA.

  • The pollutant discharge permit application must include production processes, discharge points, pollutant types, concentrations, and total quantities; permits are valid for 5 years.

  • Cumulative impact assessment considers the combined effects of the proposed action and other past, present, and reasonably foreseeable actions in the same area.

  • Matrices (Leopold matrix) and networks are common impact identification tools; each interaction is scored by magnitude and importance.

  • The environmental risk assessment for chemical projects follows HJ 169-2018, which requires source-term analysis, consequence modeling, and risk acceptance criteria (e.g., individual risk ≤ 1×10⁻⁵/yr for new projects).

Quick reference

Environmental Monitoring, Sampling, and Analysis

  • Representativeness requires sampling at the correct location, depth, and time; grab samples capture instantaneous conditions while composite samples (flow-proportional or time-proportional) capture averages.

  • Chain of custody (样品流转记录) must document every transfer of a sample: collector, date/time, preservation, and receiving laboratory.

  • Sample preservation: acidify to pH < 2 with HNO3 for metals; cool to 4 °C and analyze within holding times (e.g., 24 h for BOD, 48 h for COD, 6 months for metals).

  • Method detection limit (MDL) = t(n-1, 1-α=0.99) × S, where S is the standard deviation of replicate low-level spikes; typically 7 replicates.

  • Calibration curves require a minimum of 5 concentration levels with r ≥ 0.999 for most instrumental methods; blanks, duplicates, and matrix spikes are QC essentials.

  • The relative percent difference (RPD) for duplicates = |C1 - C2| / ((C1 + C2)/2) × 100%; acceptance is typically ≤ 20% for water and ≤ 30% for soil.

  • Percent recovery for matrix spikes = (Cspiked - Cnative) / Cadded × 100%; acceptance typically 75-125% depending on analyte and matrix.

  • Continuous emission monitoring (CEMS) for flue gas must meet HJ 75-2017 and HJ 76-2017 for installation, calibration, and data validity (≥ 75% valid hours per quarter).

Quick reference

Soil and Groundwater Contamination and Remediation

  • Soil contamination investigation in China follows HJ 25.1-2019 (technical guidelines for soil contamination investigation) and HJ 25.2-2019 (monitoring), HJ 25.3-2019 (risk assessment), and HJ 25.4-2019 (remediation).

  • The soil environmental quality standard GB 36600-2018 sets risk screening values and risk intervention values for construction land, with two land-use categories (first class: residential/school; second class: industrial/commercial).

  • Darcy's law governs groundwater flow: Q = K·i·A, where K is hydraulic conductivity, i is hydraulic gradient, and A is cross-sectional area.

  • The advection-dispersion equation for 1-D transport: ∂C/∂t = D·∂²C/∂x² - v·∂C/∂x - λC, where D is dispersion coefficient, v is seepage velocity, and λ is decay rate.

  • Retardation factor R = 1 + (ρb/θ)·Kd, where ρb is bulk density, θ is porosity, and Kd is the distribution coefficient; higher R means slower contaminant migration.

  • Pump-and-treat is limited by tailing and rebound; in-situ chemical oxidation (ISCO) with permanganate or persulfate destroys contaminants in place but requires oxidant demand testing.

  • Soil vapor extraction (SVE) is effective for volatile organic compounds in the unsaturated zone; effectiveness decreases with low permeability and high moisture.

  • Phytoremediation and bioremediation are applicable for low-concentration, large-area contamination; monitored natural attenuation (MNA) requires long-term monitoring and institutional controls.

Quick reference

Noise, Vibration, and Other Physical Pollution Control

  • Sound pressure level Lp = 20·log10(p/p0) dB, where p0 = 20 μPa; sound power level Lw = 10·log10(W/W0) dB, where W0 = 10⁻¹² W.

  • Sound level decreases with distance: for a point source in free field, Lp2 = Lp1 - 20·log10(r2/r1); for a line source, Lp2 = Lp1 - 10·log10(r2/r1).

  • Addition of incoherent sound levels: L_total = 10·log10(Σ10^(Li/10)); two equal sources add 3 dB, ten equal sources add 10 dB.

  • The equivalent continuous A-weighted level LAeq,T = 10·log10[(1/T)·∫10^(LA/10)dt] is the standard metric for environmental noise assessment.

  • China's acoustic environment quality standard GB 3096-2008 sets day/night limits by functional zone: Category 1 (residential) 55/45 dB(A), Category 2 (mixed) 60/50 dB(A), Category 3 (industrial) 65/55 dB(A), Category 4 (traffic) 70/55 dB(A).

  • The emission standard GB 12348-2008 sets boundary noise limits for industrial enterprises; night-time limits are 10 dB lower than day-time limits, with 15 dB reductions allowed when the background is much lower.

  • Noise control follows source-path-receiver hierarchy: reduce source sound power, attenuate along the path (barriers, enclosures, silencers), and protect the receiver.

  • Vibration is assessed by vibration acceleration level VAL = 20·log10(a/a0) dB, with a0 = 10⁻⁶ m/s²; ground-borne vibration from construction is regulated by GB 10070-88 and GB 10071-88.