Ruankao System Planning and Management Engineer (Senior) flashcards
Ruankao System Planning and Management Engineer (Senior) · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- McFarlan strategic grid
- A portfolio tool plotting applications by current and future strategic impact, yielding Support, Factory, Turnaround, and Strategic quadrants that guide funding priority and governance rigor.
- TOGAF ADM
- A cyclic architecture development method with a preliminary phase and phases A through H, centered on continuous requirements management, producing architecture deliverables per iteration.
- Zachman framework
- A six-by-six classification matrix intersecting interrogatives such as what, how, and why with stakeholder perspectives from planner to functioning enterprise. It organizes artifacts but prescribes no process.
- Value chain analysis
- A method dividing the firm into primary and support activities to locate where IT investment can reduce cost or add differentiation within a specific activity.
- ITIL 4 service value chain
- Six connected activities: plan, improve, engage, design and transition, obtain or build, and deliver and support. Practices are combined into value streams that traverse these activities.
- Four dimensions of service management
- Organizations and people; information and technology; partners and suppliers; value streams and processes. Every practice is assessed across all four to avoid one-sided design.
- ISO/IEC 20000-1
- The certifiable international requirement standard for a service management system, covering service lifecycle requirements. Part 2 provides guidance but is not itself certifiable.
- COBIT governance and management domains
- Governance comprises Evaluate, Direct, Monitor. Management comprises APO, BAI, DSS, and MEA. The split clarifies board accountability versus executive execution.
- Service design package
- The documented output of service design covering requirements, architecture, capacity, availability, continuity, security, and acceptance criteria, used as the transition baseline.
- RTO versus RPO
- Recovery time objective is the maximum acceptable outage duration; recovery point objective is the maximum acceptable data loss measured in time. Both derive from business impact analysis.
- Service catalogue business view
- The user-facing list of services and requestable items described in business language, distinct from the technical view that maps supporting services and configuration items.
- Impact and urgency matrix
- A documented grid combining business impact with urgency to derive priority, preventing priority inflation driven by caller seniority or persistence.
- Known error record
- A problem record with a documented root cause or working hypothesis and a workaround, linked to affected configuration items and published knowledge articles for support staff.
- Standard change
- A pre-authorized, low-risk, repeatable change with a defined procedure and acceptance criteria, requiring no per-instance approval from the change authority.
- Emergency change
- A change needed to restore service or address a critical risk, approved through an expedited path by designated authority and reviewed retrospectively for lessons.
- First-contact resolution rate
- The percentage of incidents resolved during the initial contact without escalation or callback. It should be read alongside reopen rate to detect premature closure.
- Unit cost per service
- Total cost attributable to a service divided by a defined volume driver such as transactions or users, enabling trend analysis and external benchmarking across periods.
- Showback versus chargeback
- Showback reports service consumption costs to business units without moving money; chargeback posts actual internal charges. Chargeback influences demand more strongly but requires accurate cost allocation.
- Payback period
- The time required for cumulative net cash inflows to equal the initial investment, computed as investment divided by annual net inflow. It ignores returns after breakeven.
- Balanced scorecard perspectives
- Four linked views: financial, customer, internal process, and learning and growth. Each perspective carries a small set of measures with targets and named owners.
- Three lines model
- First line owns and manages risk; second line provides oversight, frameworks, and challenge; third line is independent internal audit giving assurance to the governing body.
- Risk appetite versus tolerance
- Risk appetite is the amount of risk the organization chooses to pursue in pursuit of objectives; tolerance is the acceptable variation around a specific objective before escalation.
- Segregation of duties
- A control ensuring no single person can initiate, approve, and record the same transaction. Where staffing prevents it, compensating monitoring controls must be documented.
- Business impact analysis
- A study identifying critical business functions and their dependencies, quantifying outage impact over time, and deriving recovery time and recovery point objectives.
- Defense in depth
- Layering preventive, detective, and corrective controls so that failure of one layer does not expose the asset. Each layer has an owner and monitoring method.
- Least privilege
- Granting each identity only the access needed for its current tasks, with periodic recertification and stronger controls plus session logging for privileged accounts.
- Data classification
- Assigning data to tiers such as public, internal, confidential, and restricted, which then determine handling rules for encryption, access, sharing, and disposal.
- Chain of custody
- Documented, unbroken record of who handled evidence, when, and how, from collection through analysis and storage, required for the evidence to be admissible and credible.
- Tuckman stages
- Forming, storming, norming, performing, and adjourning describe team development. Leadership style shifts from directing during forming to delegating at performing.
- ADKAR model
- Awareness, desire, knowledge, ability, and reinforcement describe individual change readiness. A gap at any single element blocks the change regardless of project status.
- Power-interest grid
- A stakeholder map plotting influence against interest, prescribing close management for high-high, keep satisfied for high power and low interest, and keep informed for the inverse.
- Kotter eight steps
- Urgency, guiding coalition, vision, communication, empowerment, short-term wins, consolidation, and cultural anchoring. Skipping early steps is the most common cause of failed change.