Special Equipment Inspector · Give each week a clear focus.
8 weeks · About 7 hours per week
Laws, Regulations, and Safety Supervision System for Special Equipment & General Inspection Principles, Methods, and Quality Control
Build a one-page map of the special equipment safety supervision system: identify which equipment categories are covered, the roles of the regulator, inspection bodies, and user units, and the lifecycle obligations from design through scrapping.
List, from memory, the categories of administrative measures that apply to special equipment (production licensing, use registration, periodic inspection, operator certification) and match each to the responsible party.
Explain the difference between supervisory inspection and statutory periodic inspection, and state who may perform each.
Practice 30 recall questions on domain 1 topics and log every wrong answer with the specific rule you confused.
Your checkpoint
A one-page regulatory map plus a 30-item error log with each miss traced to a named rule or obligation.
Boilers & General Inspection Principles, Methods, and Quality Control
Trace the boiler water-and-steam path on a blank diagram, labeling economizer, drum, furnace, superheater, and safety valves, and state the inspection point at each.
Calculate the required safety valve set pressure relationship and explain how to verify it during an internal inspection.
Describe the external and internal inspection routines for a fire-tube and a water-tube boiler, including what you look for at each stay, tube sheet, and ligament.
Apply the general inspection sequence (document review, preparation, visual, measurement, NDT, conclusion) to a boiler case and write the sequence you would follow.
Your checkpoint
A labeled boiler diagram plus a written 10-step inspection sequence for one boiler type with the acceptance check at each step.
Pressure Vessels & Materials, Welding, Nondestructive Testing, and Failure Analysis
Classify pressure vessels by pressure level and by intended function, and state how classification changes the inspection frequency and NDT scope.
Identify the failure modes most relevant to pressure vessels (corrosion thinning, hydrogen blistering, brittle fracture, fatigue cracking) and name the NDT method that detects each.
Explain the purpose and limits of hydrostatic versus pneumatic testing and state when pneumatic testing is permitted.
Describe weld joint types and the inspection implications of joint efficiency, and match common weld defects to their radiographic or ultrasonic signatures.
Your checkpoint
A two-column table mapping eight vessel degradation mechanisms to the detection method and the acceptance criterion you would cite.
Pressure Piping and Pressure Pipeline Components & General Inspection Principles, Methods, and Quality Control
Identify the components of a pressure piping system (pipe, fittings, flanges, gaskets, supports, expansion joints) and state the inspection concern for each.
Explain how piping classes, service conditions, and material selection interact, and describe the walk-down checks for a pipeline before internal inspection.
Describe the thickness survey and corrosion-mapping approach for piping, including how to select measurement locations.
Complete a timed 40-question mixed set covering domains 1-5 and review every miss against the source rule.
Your checkpoint
A completed 40-question timed set with a scored breakdown by domain and a rewritten correction note for each miss.
Elevators, Escalators, and Moving Walks & Lifting Appliances and Rigging
List the safety components of an elevator (overspeed governor, safety gear, buffers, door interlocks, rope traction conditions) and state the test or check that verifies each.
Explain the inspection logic for escalators and moving walks: step and comb condition, handrail speed, skirt clearance, braking distance, and anti-reversal protection.
Identify the load-bearing elements of a lifting appliance (wire rope, chain, hook, brake, limit switch, overload protection) and state the rejection criterion for each.
Compute a rigging load estimate for a sling at an angle, and explain how sling angle changes tension.
Your checkpoint
A component-to-test checklist for one elevator and one lifting appliance, each with a stated rejection criterion.
Passenger Ropeways and Amusement Rides & Large-Scale Special Equipment and Field-Installed Equipment
Describe the safety envelope of a passenger ropeway: rope condition, grip force, braking, evacuation capability, and wind operating limits.
Explain the inspection focus for amusement rides: structural fatigue, restraint systems, control interlocks, and daily pre-operation checks.
Contrast field-installed and large-scale equipment inspection planning: site conditions, staged inspection, and documentation of concealed work.
Draft a pre-inspection plan for one field-installed installation listing documents to request, hold points, and safety controls.
Your checkpoint
A one-page pre-inspection plan for a field-installed installation with at least five hold points and the evidence required at each.
Inspection Records, Reports, and Defect Disposition & Professional Ethics, Safety, and Accident Investigation
Write three sample inspection records: one clean pass, one with a minor nonconformity, and one requiring suspension of use, each with a clear conclusion and disposition.
Explain how to classify a defect by severity and the escalation path when a defect is outside your authority to accept.
Outline the accident investigation sequence for special equipment: preserve the scene, gather records, identify the failure mode, and report findings.
State the ethics obligations of an inspector when pressured to alter a conclusion, and describe how to document the refusal.
Your checkpoint
Three complete sample inspection records with defect disposition, plus a one-page accident investigation outline.
Laws, Regulations, and Safety Supervision System for Special Equipment & General Inspection Principles, Methods, and Quality Control & Boilers & Pressure Vessels & Pressure Piping and Pressure Pipeline Components & Elevators, Escalators, and Moving Walks & Lifting Appliances and Rigging & Passenger Ropeways and Amusement Rides & Large-Scale Special Equipment and Field-Installed Equipment & Materials, Welding, Nondestructive Testing, and Failure Analysis & Inspection Records, Reports, and Defect Disposition & Professional Ethics, Safety, and Accident Investigation
Take two full-length timed mock exams and record the score and time per domain.
Re-drill every item missed in weeks 1-7 until each is answered correctly twice in a row.
Rewrite your weakest three domain summaries from memory and compare them to your notes.
Build a final one-page formula and criteria sheet covering set pressures, sling tension, and acceptance thresholds.
Your checkpoint
Two scored mock exams with a domain-by-domain trend line and a one-page final criteria sheet.
Milestones
Week 2: Can explain, without notes, the boiler inspection sequence and the safety valve verification method, scoring at least 80% on a 20-question domain 3 set.
Week 4: Scored at least 70% overall on the 40-question mixed set covering domains 1-5, with no domain below 60%.
Week 6: Can state the rejection criterion for five lifting components and the inspection focus for a ropeway and an amusement ride from memory.
Week 8: Averaged at least 75% across two full-length mocks with every domain at or above 65% and all week 1-7 error-log items cleared.