CO Plumber study materials
CO Plumber study resources

CO Plumber study plan

CO Plumber · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

General Plumbing Knowledge and Safety

  • Define the basic plumbing system flow path - service, meter, distribution, fixture supply, drain, vent, building drain - and sketch it from memory

  • Identify the safety hazards and required PPE for common tasks: soldering, solvent cementing, trenching, and working in confined spaces

  • Explain the difference between potable water, gray water, and black water, and state the cross-connection risk for each

  • Calculate simple pipe volume, pressure/head, and fixture-unit counts using the formulas provided in study material

  • List the hand and power tools used for cutting, reaming, bending, and joining pipe and state one safe-use rule for each

Your checkpoint

A one-page hand-drawn system diagram plus a 20-item tool/safety flashcard set, both self-quizzed to 100% recall

Week 2

General Plumbing Knowledge and Safety & Piping Systems, Materials, and Joints

  • Identify copper, PEX, CPVC, PVC, ABS, cast iron, and galvanized steel by appearance, marking, and typical application

  • Match each material to its approved joining method and the fittings commonly used with it

  • Explain water distribution sizing concepts - fixture units, developed length, pressure loss - and work three sample sizing problems

  • Describe drain/waste/vent sizing and slope requirements and compute slope drop over a given run

  • Distinguish trap, vent, and cleanout functions and locate them correctly on a sample layout

Your checkpoint

A material-to-joint comparison matrix covering 7 pipe materials and their fittings, scored against study notes with all gaps corrected

Week 3

Piping Systems, Materials, and Joints

  • Demonstrate (or narrate step-by-step) the soldering process for copper, including fluxing, heat control, and leak-check

  • Sequence the solvent-cementing procedure for PVC and ABS, including primer, cure times, and temperature adjustments

  • Install or describe correctly three PEX connection types: crimp, clamp, and expansion

  • Specify hanger and support spacing and required support types for horizontal and vertical runs of each material

  • Diagnose six common joint failures (cold solder joint, insufficient primer, over-crimped ring, etc.) and state the correction for each

Your checkpoint

A written 10-step procedure card per joining method (copper, PVC/ABS, PEX) that a helper could follow with no further instructions

Week 4

Piping Systems, Materials, and Joints & Colorado Plumbing Code, Permits, and Inspection

  • Locate and read the code chapters governing materials, joints, and support, and summarize the approval and prohibitions for each material

  • Compare a sample installation list against code requirements and mark every non-compliant item with the rule violated

  • Explain the permit process for piping work: when a permit is required, who may pull it, and what inspections follow

  • Practice 40 mixed questions on piping systems and materials under timed conditions

  • Re-teach the three concepts missed most often in your practice set, in writing

Your checkpoint

A timed 40-question practice set scored at 80% or higher, with a written correction log for every missed item

Week 5

Fixtures, Appliances, and Water Heaters

  • Identify the components and installation requirements for water closets, lavatories, sinks, tubs, and shower valves

  • Explain fixture clearances, minimum fixture counts, and accessible-fixture requirements for a typical dwelling

  • Describe water heater types (tank, tankless, electric, gas) and their venting, combustion-air, and relief-valve requirements

  • Trace the function of the T&P relief valve, expansion tank, and drain pan, and state the consequence of each failing

  • Diagnose five fixture/appliance symptoms (low hot-water volume, sewer odor, running toilet, scald risk, relief-valve discharge) and name the likely cause

Your checkpoint

A symptom-to-cause troubleshooting table with at least 15 entries, each with a stated corrective action

Week 6

Fixtures, Appliances, and Water Heaters & Colorado Plumbing Code, Permits, and Inspection

  • Summarize the code requirements for fixture installation, water heater installation, and relief-valve discharge piping

  • Compare a sample water heater installation scenario against code and list every correction needed

  • Explain the inspection sequence for a fixture or water heater replacement, from permit to final

  • Answer 40 mixed fixture/appliance and code questions under timed conditions

  • Rewrite in your own words the five code provisions you find hardest to remember

Your checkpoint

A scored 40-question practice set at 80% or higher plus a corrected code-scenario worksheet with zero unresolved items

Week 7

Colorado Plumbing Code, Permits, and Inspection

  • Outline the Colorado plumbing licensure structure - apprentice, journeyman, master - and the scope of work allowed at each level

  • Describe the permit application, inspection request, and final approval workflow for a residential project

  • List the most commonly cited inspection failures and the code provision behind each

  • Explain the adopted code edition and how local amendments can differ from the state baseline

  • Walk through a mock rough-in and final inspection, stating what an inspector checks at each stage

Your checkpoint

A one-page permit-and-inspection flow chart plus a 15-item 'top inspection failures' list with the governing rule for each

Week 8

General Plumbing Knowledge and Safety & Piping Systems, Materials, and Joints & Fixtures, Appliances, and Water Heaters & Colorado Plumbing Code, Permits, and Inspection

  • Complete two full-length timed practice exams covering all four domains

  • Score each exam by domain and rank your three weakest areas

  • Re-study only the ranked weak areas, using the correction logs from weeks 1-7

  • Re-drill previously missed questions until each is answered correctly twice

  • Write a final one-page formula, sizing, and code-number reference sheet from memory

Your checkpoint

Two full-length practice exams both scored at 80% or higher, with a final weak-area list reduced to zero open items

Milestones

Week 2: Can name all 7 pipe materials, their joining methods, and their typical applications without notes; scoring 70%+ on an untimed Domain 2 warm-up set

Week 4: Timed 40-question mixed set at 80%+; correction log complete; can explain the permit trigger rules from memory

Week 6: Scored 80%+ on fixture/appliance and code mixed set; water heater installation scenario fully corrected with no unresolved code items

Week 8: Two full-length practice exams at 80%+ overall with no single domain below 70%