CPIM study materials
CPIM study resources

CPIM cheat sheet

CPIM · Keep the key ideas within reach.

Quick reference

Supply Chains and Strategy

  • Competitive priorities are cost, quality, delivery speed, delivery reliability, flexibility, and innovation; improving one usually trades off against another.

  • Order qualifiers are the minimum standards a firm must meet to be considered; order winners are the criteria that actually cause the customer to choose the firm.

  • SCOR level-1 processes are Plan, Source, Make, Deliver, Return, and Enable.

  • Porter's generic strategies are cost leadership, differentiation, and focus.

  • Strategy exists at three levels: corporate, business unit, and functional/operational.

  • Total cost of ownership covers acquisition, possession, and disposal costs, not just the purchase price.

  • Bullwhip effect causes: demand forecast updating, order batching, price fluctuation, and rationing/shortage gaming.

  • Little's Law: average inventory = throughput rate x average flow time.

Quick reference

Sales and Operations Planning (S&OP)

  • The S&OP horizon is typically 12-18 months in monthly buckets, reviewed and rolled forward each month.

  • Five steps: data gathering, demand planning, supply planning, pre-S&OP reconciliation, and the executive S&OP meeting.

  • The output is a single authorized consensus plan that balances demand and supply at the aggregate product-family level.

  • Level strategy holds output and workforce constant, letting inventory and backlogs absorb demand variation.

  • Chase strategy matches output to demand each period through hiring, layoff, overtime, and subcontracting.

  • Mixed (hybrid) plans combine level and chase elements and generally beat pure strategies on total cost.

  • The aggregate plan is disaggregated into the master production schedule, whose capacity feasibility is then tested by rough-cut capacity planning.

  • Demand-shaping options in S&OP include pricing, promotion, backorder acceptance, and new-market development.

Quick reference

Demand

  • Forecast components are base level, trend, seasonality, cyclical movement, promotional lift, and random variation.

  • Exponential smoothing: F(t+1) = alpha x A(t) + (1 - alpha) x F(t); a higher alpha increases responsiveness and nervousness.

  • MAD = sum of absolute errors / n; MSE squares errors and penalizes large misses; MAPE states error as a percentage of actual.

  • Bias is the running sum of forecast errors (RSFE); a persistent sign signals systematic over- or under-forecasting.

  • Tracking signal = RSFE / MAD; values outside roughly +/-4 trigger a forecast model review.

  • Forecasts are more accurate for aggregate items and short horizons; family-level forecasts beat item-level forecasts.

  • Qualitative methods include Delphi, market research, panel consensus, sales force composite, and historical analogy.

  • Seasonal index = average demand in that period / overall average demand across all periods.

Quick reference

Internal Supply

  • MRP inputs are the master production schedule, the bill of material, and inventory records; outputs are planned orders, order releases, and reschedule notices.

  • Net requirement = gross requirement + safety stock - scheduled receipts - projected available balance.

  • Planned order release = planned order receipt offset backwards by the item's lead time.

  • Time fences divide the MPS horizon into frozen (no changes), slushy (changes by exception), and liquid (any change) zones.

  • Low-level coding places each component at the deepest bill-of-material level where it appears and sets the MRP explosion sequence.

  • Lot-sizing rules include lot-for-lot, fixed order quantity, EOQ, periodic order quantity, and Wagner-Whitin.

  • Rough-cut capacity planning validates the MPS; capacity requirements planning validates MRP at the work-center level.

  • Backflushing deducts component inventory automatically at completion of the parent order rather than at issue.

Quick reference

External Supply and Key Support Functions

  • Purchasing cycle: requisition, supplier identification, RFQ/RFP, negotiation, purchase order, expediting, receipt, and payment.

  • Supplier selection criteria include quality capability, cost, delivery reliability, technical capability, financial stability, and capacity.

  • Kraljic matrix categories: strategic (high profit impact / high supply risk), leverage, bottleneck, and noncritical.

  • Landed cost equals unit price plus freight, duty, insurance, brokerage, and handling charges.

  • Incoterms allocate cost, risk, and responsibility between buyer and seller; EXW places the most cost on the buyer and DDP the most on the seller.

  • Relationship spectrum: transactional, arm's-length, single-source, partnership, strategic alliance, joint venture.

  • Early supplier involvement brings supplier design expertise into product development to cut cost and time to market.

  • Transportation cost per unit weight ranks lowest for water and pipeline, then rail, then truck, highest for air; speed ranks roughly in reverse.

Quick reference

Inventory

  • EOQ = square root of (2DS/H), where D is annual demand, S is order cost, and H is annual holding cost per unit.

  • Total inventory cost = purchase cost + ordering cost + holding cost (+ shortage cost).

  • Reorder point = expected demand during lead time + safety stock; safety stock = Z x sigma-d x square root of L.

  • Carrying cost typically runs 15-25% of unit value per year, covering capital, storage, insurance, taxes, and obsolescence.

  • Inventory turnover = cost of goods sold / average inventory value; days of supply = average inventory / average daily demand.

  • ABC classification follows Pareto logic: roughly 20% of items account for about 80% of annual usage value.

  • Periodic review orders at fixed intervals up to a target level; perpetual review orders when stock reaches the reorder point.

  • Raising service level from 95% to 99% moves Z from 1.645 to 2.326, requiring about 41% more safety stock.

Quick reference

Detailed Schedules

  • Shortest processing time minimizes average flow time and average waiting time; earliest due date minimizes maximum lateness.

  • Critical ratio = (due date - now) / remaining processing time; a value below 1 means the job is behind schedule.

  • First-come-first-served is fair but generally poor on average flow time; slack per remaining operation prioritizes the least-slack job.

  • Forward scheduling starts at the release date; backward scheduling starts at the due date and works backwards.

  • Finite loading assigns work only up to capacity limits; infinite loading sets dates without regard to capacity.

  • Theory of constraints steps: identify the constraint, exploit it, subordinate everything else, elevate it, then repeat.

  • Drum-buffer-rope: the bottleneck sets the pace (drum), a time buffer protects it, and the rope ties material release to the drum.

  • Johnson's rule sequences two-machine jobs by repeatedly taking the shortest remaining time, front-loading machine-1 jobs and rear-loading machine-2 jobs.

Quick reference

Distribution

  • DRP is time-phased and pulls replenishment from the plant based on warehouse demand, scheduled receipts, and lead times.

  • Cross-docking moves goods from inbound to outbound vehicles without put-away, cutting handling cost and lead time.

  • Square root law: total safety stock across n stocking locations grows roughly with the square root of n, so consolidation reduces inventory.

  • Warehouse activities are receiving, put-away, storage, order picking, packing, and shipping; picking is usually the largest cost driver.

  • Centralized distribution lowers inventory and facility cost but raises outbound transportation cost and lengthens customer lead time.

  • The perfect order index combines on-time, in-full, damage-free, and correct-documentation performance.

  • 3PL providers supply warehousing and transportation services; 4PL providers additionally manage and integrate the whole network.

Quick reference

Quality

  • Cost of quality categories: prevention, appraisal, internal failure, and external failure; spending on prevention usually lowers failure costs.

  • Cp = (USL - LSL) / 6-sigma measures spread only; Cpk also accounts for how well the process is centered on the specification.

  • Six sigma quality equals 3.4 defects per million opportunities.

  • Control limits at +/-3 sigma are computed from process data; specification limits come from the customer and must never be plotted as control limits.

  • Common-cause variation is inherent to the process and needs management action; special-cause variation is assignable and must be investigated.

  • Acceptance sampling risks: producer's risk (alpha, rejecting a good lot) and consumer's risk (beta, accepting a bad lot), shown on the OC curve.

  • Seven basic quality tools: flowchart, check sheet, Pareto chart, cause-and-effect diagram, histogram, scatter diagram, and control chart.

  • DMAIC phases are Define, Measure, Analyze, Improve, Control; PDCA is Plan, Do, Check, Act.

Quick reference

Business Investments and Continuous Improvement

  • Payback period = initial investment / annual net cash flow; it ignores the time value of money and all cash flows after payback.

  • NPV discounts all project cash flows at the cost of capital; accept a project when NPV is greater than zero.

  • IRR is the discount rate that makes NPV equal zero; accept when IRR exceeds the hurdle rate.

  • WACC is the most common hurdle rate used for capital investment screening.

  • Takt time = available production time / customer demand rate; it sets the pace the process must run at to meet demand.

  • Seven wastes: overproduction, waiting, transportation, overprocessing, inventory, motion, and defects.

  • Lean tools include value stream mapping, 5S, kaizen, kanban, poka-yoke, jidoka, SMED, and standard work.

  • Balanced scorecard perspectives: financial, customer, internal business process, and learning and growth.