CPIM flashcards
CPIM · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Order winner versus order qualifier
- An order qualifier is the minimum standard a supplier must meet to be considered at all; an order winner is the characteristic that actually makes the customer choose one supplier over another.
- SCOR model processes
- SCOR defines six management processes: Plan, Source, Make, Deliver, Return, and Enable, giving a common language for describing, benchmarking, and improving supply chain activities.
- Bullwhip effect
- The amplification of demand variability as orders move upstream from customer to supplier, driven by forecast updating, order batching, price fluctuation, and shortage gaming.
- Strategic fit
- Matching supply chain responsiveness to the implied demand uncertainty of the products served: high-uncertainty products need responsive chains, while low-uncertainty products suit efficient chains.
- Executive S&OP meeting
- The final monthly S&OP step in which senior management reconciles demand and supply plans and authorizes a single balanced consensus plan for the whole business.
- Level production strategy
- An aggregate planning approach that holds the workforce and output rate constant, absorbing demand variation through inventory build and depletion or through backlogs.
- Chase production strategy
- An aggregate planning approach that matches output to demand in each period by hiring, laying off, using overtime, or subcontracting, keeping inventory low but labor cost volatile.
- Exponential smoothing formula
- F(t+1) = alpha x A(t) + (1 - alpha) x F(t), where alpha is the smoothing constant; a higher alpha makes the forecast more responsive to the most recent actual demand.
- Tracking signal
- The running sum of forecast errors divided by MAD; a value outside roughly plus or minus four signals persistent bias and the need to revise the forecast model.
- Mean absolute deviation
- The average of the absolute differences between actual demand and forecast demand, expressing forecast error in the same units as demand and avoiding offsetting of positive and negative errors.
- Delphi method
- A structured qualitative forecasting technique in which dispersed experts submit anonymous forecasts over several rounds until consensus emerges, preventing dominant personalities from skewing the result.
- MRP net requirement
- Net requirement equals gross requirement plus safety stock minus scheduled receipts and projected available balance; it drives planned order receipts and, after lead-time offset, planned order releases.
- MPS time fence
- A designated span in the master production schedule within which changes are restricted or need higher authorization, protecting execution from disruptive short-term order changes.
- Low-level code
- The deepest level in a bill of material at which a component appears; it determines the sequence in which items are exploded during material requirements planning.
- Kraljic matrix
- A purchasing portfolio model classifying items by profit impact and supply risk into strategic, leverage, bottleneck, and noncritical segments, each calling for a different sourcing strategy.
- Total cost of ownership
- A purchasing evaluation covering all costs of acquiring, using, and disposing of an item, including price, freight, duty, quality, inventory, and lifecycle costs rather than price alone.
- OTIF
- On-time in-full: a supplier performance measure counting deliveries that arrive by the promised date in the exact quantity ordered, expressed as a percentage of total deliveries.
- Economic order quantity
- EOQ equals the square root of (2DS/H), where D is annual demand, S is order cost, and H is annual holding cost per unit; it minimizes combined ordering and holding cost.
- Reorder point
- The inventory level that triggers a new replenishment order; it equals expected demand during the lead time plus the safety stock needed for the target service level.
- Safety stock formula
- Safety stock = Z x sigma-d x square root of L, where Z reflects the target service level, sigma-d is the standard deviation of demand per period, and L is lead time.
- ABC classification
- A Pareto-based ranking of inventory by annual usage value: A items are few but high value and tightly controlled, B items moderate, and C items numerous but low value.
- Shortest processing time rule
- A sequencing priority rule that runs the job with the shortest processing time first; it minimizes average flow time and average waiting time but can delay long jobs.
- Critical ratio
- Critical ratio = (due date - current date) / remaining processing time; a value below 1 means the job is behind schedule, while a value above 1 means it is ahead.
- Drum-buffer-rope
- A theory of constraints scheduling method in which the bottleneck sets the pace (drum), a time buffer protects it, and the rope communicates that pace back to the material release point.
- Distribution requirements planning
- A time-phased technique that explodes finished-good requirements from central supply through the distribution network to determine replenishment orders at each warehouse.
- Cross-docking
- A warehouse practice in which inbound shipments move directly across the dock to outbound vehicles with little or no storage, reducing handling cost and order cycle time.
- Square root law
- Total safety stock held across multiple stocking locations is roughly proportional to the square root of the number of locations, so consolidating locations reduces total inventory.
- Cost of quality
- The sum of prevention and appraisal costs plus internal and external failure costs; increasing prevention spending generally reduces total failure costs and total cost of quality.
- Process capability index
- Cpk = minimum of [(USL - mean)/(3 sigma)] and [(mean - LSL)/(3 sigma)]; it compares both process spread and centering to specification limits, with 1.33 often a minimum target.
- Control chart
- A statistical process control chart plotting a quality characteristic over time with upper and lower control limits at plus or minus three sigma, separating common-cause from special-cause variation.
- Net present value
- The sum of a project's future cash flows discounted at the cost of capital, minus the initial investment; a positive NPV means the project adds economic value.
- Takt time
- Takt time = available production time / customer demand rate; it sets the pace at which work must be completed to meet demand exactly without building excess inventory.