CQIA flashcards
CQIA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Quality (ASQ definition)
- The totality of features and characteristics of a product or service that bear on its ability to satisfy stated or implied needs; quality is judged by the customer rather than the producer.
- Cost of poor quality
- The sum of internal and external failure costs, such as scrap, rework, warranty claims, returns, and complaint handling, representing money spent because defects occurred.
- Prevention cost
- A cost of good quality incurred to keep defects from happening, including training, process design, supplier qualification, and preventive maintenance; it is the least expensive cost-of-quality category.
- External failure cost
- Costs arising after a defective product reaches the customer, including warranty, returns, recalls, field service, liability, and lost goodwill; the most expensive cost-of-quality category.
- Deming's 14 points
- A management philosophy for improvement stressing constancy of purpose, eliminating fear, and abolishing numerical quotas and merit ratings; Deming held management responsible for roughly 85% of problems.
- Juran quality trilogy
- Joseph Juran's framework of three managerial processes: quality planning, quality control, and quality improvement, combined with the Pareto principle that a vital few causes produce most problems.
- Crosby zero defects
- Philip Crosby's doctrine that quality means conformance to requirements, that defects are preventable, and that quality is free because prevention costs less than rework.
- ISO 9001
- The international standard for quality management systems, built on seven principles including customer focus, leadership, process approach, improvement, and evidence-based decision making.
- Forming stage
- The first stage of team development, in which members are polite, dependent on the leader, and unclear about roles and goals while orienting themselves to the task and each other.
- Storming stage
- The second team stage, marked by conflict over roles, methods, and influence; the leader must clarify goals, ground rules, and decision processes to move the team forward.
- Norming stage
- The third team stage, in which agreement forms around roles, procedures, and behavior norms; cohesion and trust grow and members begin cooperating on the shared task.
- Performing stage
- The fourth team stage, where the group is productive and self-managing; roles are clear, problems are solved collaboratively, and energy focuses on achieving the team's objectives.
- Consensus decision
- A decision all members can support and commit to even when it is not each person's first choice; it requires open discussion of objections rather than unanimity or simple majority rule.
- Nominal group technique
- A structured group method in which members silently write ideas, each idea is posted and clarified, and members privately rank the ideas to set priorities and prevent domination by one personality.
- Team charter
- A written document defining a team's purpose, scope, customers, deliverables, authority, resources, milestones, roles, and operating ground rules, aligning the team with its sponsor.
- Cross-functional team
- A team whose members come from different departments or disciplines, such as operations, engineering, and quality, assembled to solve a problem that crosses organizational boundaries.
- PDCA cycle
- The Plan-Do-Check-Act cycle, also called the Deming or Shewhart cycle: plan a change, run it small, check results against the objective, then standardize or adjust and repeat.
- DMAIC
- The Six Sigma improvement roadmap: Define the problem and customer requirements, Measure current performance, Analyze root causes, Improve the process, and Control the gains.
- Kaizen
- A Japanese term meaning continuous incremental improvement made by everyone every day at low cost; it relies on small team-based changes and standardization rather than large capital projects.
- Takt time
- The pace at which a process must complete one unit to meet customer demand, calculated as available production time divided by customer demand over the same period.
- 5S
- A workplace organization method with five steps: sort, set in order, shine, standardize, and sustain; it removes clutter, makes abnormalities visible, and supports standardized work.
- Poka-yoke
- A mistake-proofing device or design that prevents an error from being made or makes it immediately obvious, such as a fixture that accepts a part in only one orientation.
- Value stream map
- A visual map of all material and information flows required to deliver a product, used to separate value-adding from non-value-adding steps and target waste reduction.
- Six sigma defect level
- A process performance level of 3.4 defects per million opportunities, representing statistical capability of about six standard deviations between the process mean and the nearest specification limit.
- Pareto chart
- A bar chart of problem categories ordered largest to smallest with a cumulative percentage line; it applies the 80/20 rule to separate vital few causes from trivial many.
- Cause-and-effect diagram
- Also called a fishbone or Ishikawa diagram, it organizes possible causes of a problem into branches such as manpower, machine, material, method, measurement, and environment.
- Control chart
- A time-ordered plot of a process statistic with a center line and upper and lower control limits, usually at three standard deviations, separating common from special cause variation.
- Histogram
- A bar graph of the frequency of measurements grouped into intervals; it reveals the shape, center, spread, gaps, and outliers of a data distribution.
- Scatter diagram
- A plot of paired values of two variables, one on each axis, used to see whether they are related, the direction of the relationship, and how strong it is.
- Check sheet
- A prepared form on which data are tallied as events occur, allowing consistent collection of defect types, locations, or frequencies before charting and analysis.
- FMEA risk priority number
- In failure mode and effects analysis, the risk priority number equals severity multiplied by occurrence multiplied by detection; higher values identify failure modes that should be addressed first.
- Run chart
- A line graph of a measure plotted in time order with a median line; it shows trends, shifts, cycles, and unusual patterns before formal control limits are applied.