CRES flashcards
CRES · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Stack effect
- Buoyancy-driven air movement caused by indoor-outdoor temperature difference; warm air rises and exits high in the building while outdoor air enters low, driving winter infiltration and exfiltration.
- Dew point temperature
- The temperature at which air reaches saturation and water vapor begins to condense; surfaces at or below dew point collect moisture, which is why cold surfaces in humid spaces condense.
- Thermal bridge
- A localized path of higher thermal conductance through an assembly, such as framing, rim joists, or slab edges, that lowers the assembly's effective R-value below its nominal cavity value.
- Latent versus sensible heat
- Sensible heat changes dry-bulb temperature, while latent heat is energy absorbed or released during a phase change without a temperature change; dehumidification removes latent heat.
- ACH50 calculation
- Air changes per hour at 50 pascals equals CFM50 multiplied by 60, divided by conditioned volume in cubic feet; it normalizes blower door leakage across house sizes.
- Blower door test purpose
- Depressurizes the house to a reference pressure, typically 50 pascals, to quantify envelope air leakage and, with zonal pressure diagnostics, to locate the dominant leakage paths.
- Pressure pan testing
- With the house depressurized by a blower door, a pressure pan placed over a register reads the pressure difference; higher readings indicate a stronger leakage connection between the duct and an unconditioned zone.
- Infrared thermography limits
- Thermal imaging shows surface temperature differences only; it needs an adequate indoor-outdoor temperature difference and must be interpreted with emissivity, air leakage, and solar gain effects in mind.
- Effective versus nominal R-value
- Nominal R-value is the labeled product value; effective R-value is the installed performance after accounting for compression, gaps, convection within cavities, and thermal bridging.
- Vapor retarder classes
- Class I is 0.1 perm or less, Class II is 0.1 to 1.0 perm, and Class III is 1.0 to 10 perm; class selection depends on climate and assembly drying direction.
- Window U-factor and SHGC
- U-factor measures whole-window heat conductance, where lower is better; SHGC is the fraction of solar heat admitted, where lower values reduce cooling loads in warm climates.
- Grade I insulation
- A RESNET installation grade in which the cavity is completely filled, insulation contacts the air barrier on all six sides, and gaps and compression are minimal, allowing near-rated performance.
- Manual J load calculation
- A room-by-room heating and cooling load calculation using design conditions, envelope areas, and internal gains; equipment must be selected from this load, not from square footage rules of thumb.
- External static pressure
- The total resistance of the duct system and components measured at the air handler; it must stay within the blower's rated range or airflow drops and coils may ice or limits trip.
- CFM per ton
- The airflow delivered per ton of cooling capacity, typically targeted near 350 to 400 CFM per ton; too little airflow causes coil icing and low sensible capacity.
- Heat pump balance point
- The outdoor temperature at which heat pump capacity equals the building heating load; below this point, supplementary resistance heat operates to maintain indoor temperature.
- Superheat and subcooling
- Field measurements used to verify refrigerant charge; superheat is checked on fixed-orifice systems and subcooling on TXV systems, following the manufacturer's specified method and target values.
- Air barrier continuity
- The air barrier must be continuous, durable, and in contact with insulation across the entire envelope; gaps at rim joists, chases, and penetrations defeat the assembly.
- Attic air sealing priority
- The attic plane at the top of the house is a first-priority air sealing target because warm, moist indoor air rising into a cold attic can condense and cause decay.
- Crawlspace encapsulation
- Converting a vented crawlspace into a sealed, conditioned space by covering the ground with a vapor barrier, sealing foundation vents, and controlling humidity with a dehumidifier or conditioned air supply.
- Bulk water management
- Control of liquid water through roofing, flashing, drainage, and grading; it is the first defense in moisture management and takes priority over vapor control and air sealing.
- Exhaust fan termination
- Bath and kitchen exhaust must discharge outdoors through short, smooth duct with a backdraft damper; terminating into an attic or crawlspace adds moisture and can cause mold and decay.
- Carbon monoxide hazards
- CO is a colorless, odorless product of incomplete combustion; exposure causes headache, nausea, dizziness, and can be fatal, so CO testing and alarms are life-safety measures.
- Combustion appliance zone test
- A test that operates exhaust fans and the air handler to see whether the combustion appliance zone depressurizes enough to backdraft natural-draft appliances, causing spillage of flue gases.
- Flue gas spillage
- Combustion products escaping from the draft hood or flue connector into the living space rather than venting outdoors; it is a fail condition that requires correction before other work.
- Radon entry and mitigation
- Radon is a radioactive soil gas that enters through foundation cracks and openings; testing is required, and mitigation typically uses sub-slab depressurization with a vented fan.
- HERS Index
- A score where 100 represents a reference new home of the same size and shape; lower scores mean greater efficiency, and a score of zero indicates a net-zero-energy home.
- Model calibration
- Adjusting energy model inputs so predicted annual consumption matches actual utility bills, commonly aiming to be within about ten percent of measured annual use.
- Degree-day method
- An estimation technique that integrates the difference between a base temperature and outdoor temperature over a season to approximate heating or cooling energy use.
- IECC performance path
- A code compliance route that uses whole-building energy modeling to demonstrate the proposed design meets or beats the prescriptive package, allowing trade-offs among measures.
- Simple payback
- Installed measure cost divided by annual energy savings, expressed in years; it is a screening metric that ignores measure life, financing, and non-energy benefits.
- Scope of work elements
- A written scope lists each measure, quantity, location, expected outcome, exclusions, assumptions, and who obtains permits, so the customer and contractor share the same expectations.