CRES key terms
CRES · Get comfortable with the vocabulary.
- Thermal boundary
- Related: Thermal bridging, Insulation R-value
The continuous layer of insulation and air control that separates conditioned interior space from unconditioned or outdoor space; its location determines where heat loss is calculated in modeling and where field inspection focuses.
- Thermal bridging
- Related: Thermal boundary, Infrared thermography
Heat flow that bypasses insulation through framing, fasteners, or structural penetrations with higher conductance; it lowers effective assembly performance below the nominal cavity R-value and appears as cold stripes on infrared scans.
- Stack effect
- Related: Pressure boundary, Blower door test
Buoyancy-driven air movement caused by indoor-outdoor temperature and density differences, producing upward flow in tall buildings and drawing air in low and pushing it out high.
- Pressure boundary
- Related: Stack effect, Air barrier
The air control layer that resists air leakage between conditioned and unconditioned zones; it may coincide with the thermal boundary or be located elsewhere, and leakage at it drives moisture and energy problems.
- Sensible heat ratio
- Related: Latent load, Manual J load calculation
The fraction of total equipment cooling capacity used to remove sensible heat rather than latent heat; a mismatch with the building load leaves homes either humid or overcooled.
- R-value
- Related: U-factor, Thermal bridging
A measure of steady-state thermal resistance per unit area, expressed in ft2·h·°F/Btu in US practice; higher values mean slower conductive heat flow through a material or assembly.
- U-factor
- Related: R-value, Solar heat gain coefficient
The overall conductance of an assembly such as a window or wall, equal to the reciprocal of its total R-value; codes and programs set maximum U-factors for fenestration and envelope components.
- Solar heat gain coefficient
- Related: U-factor, Cooling load
The fraction of incident solar radiation admitted through fenestration as heat, combining directly transmitted and absorbed-then-inward-released energy; lower values reduce cooling loads in sunny orientations.
- Blower door test
- Related: Air changes per hour at 50 pascals, Pressure boundary
A diagnostic procedure using a calibrated fan in a temporary doorway panel to depressurize or pressurize a building while measuring airflow, yielding envelope leakage at a reference pressure.
- Air changes per hour at 50 pascals (ACH50)
- Related: Blower door test, Equivalent leakage area
Leakage airflow measured at a 50-pascal pressure difference, divided by conditioned volume; it normalizes blower door results so homes of different sizes can be compared against program thresholds.
- Equivalent leakage area
- Related: Air changes per hour at 50 pascals (ACH50), Blower door test
The hypothetical open area that would produce the same leakage as the measured envelope at a specified reference pressure; it is often reported alongside ACH50 to convey hole size in familiar units.
- Infrared thermography
- Related: Thermal bridging, Delta-T
Use of a thermal camera to visualize surface temperature differences that reveal insulation gaps, thermal bridging, air leakage paths, and hidden moisture, always interpreted with knowledge of interior and exterior conditions.
- Delta-T
- Related: Infrared thermography, Duct leakage testing
The temperature difference between two environments, such as indoors and outdoors or supply and return air; adequate delta-T is required for meaningful blower door, duct leakage, and infrared diagnostics.
- Duct leakage testing
- Related: Delta-T, Duct sealing
A procedure that pressurizes the duct system with a calibrated fan and measures leakage to outside or to unconditioned space, typically reported as cubic feet per minute at 25 pascals.
- Duct sealing
- Related: Duct leakage testing, Pressure imbalance
Permanent closure of duct joints, seams, and penetrations using mastic, mesh, or listed tape to reduce conditioned air loss and prevent pressure imbalances between rooms.
- Pressure imbalance
- Related: Backdrafting, Duct sealing
A sustained difference between supply and return airflow in a zone or between indoors and outdoors, which can drive backdrafting, moisture migration, and comfort complaints.
- Air barrier
- Related: Pressure boundary, Air sealing
The continuous material system that controls unintended air movement through the envelope; it must be sealed at joints, penetrations, and transitions to be effective.
- Air sealing
- Related: Air barrier, Infiltration
Field work that closes gaps, cracks, and penetrations in the building envelope and interior pressure boundary with caulk, foam, gaskets, or weatherstripping to cut infiltration and exfiltration.
- Infiltration
- Related: Air sealing, Stack effect
Unintentional outdoor air entering a building through leaks driven by wind, stack effect, and mechanical pressure differences; it carries both energy and moisture consequences.
- Vapor retarder
- Related: Dew point, Condensation
A material class that slows diffusion of water vapor through an assembly; its placement and permeance must suit the climate so the assembly can dry rather than accumulate moisture.
- Dew point
- Related: Vapor retarder, Condensation
The temperature at which air reaches saturation and water vapor begins to condense; locating the dew point within an assembly identifies where wetting risk is greatest.
- Condensation
- Related: Dew point, Vapor retarder
Change of water vapor into liquid on a surface or within a material when vapor pressure and temperature conditions reach saturation, a common cause of hidden envelope damage.
- Combustion appliance zone
- Related: Backdrafting, Spillage
The space containing fuel-burning equipment and its combustion air supply; testing and sealing work must not create depressurization that starves appliances or reverses vent flow.
- Backdrafting
- Related: Combustion appliance zone, Spillage
Reversal of flue gas flow caused by depressurization, blocked flues, or poor vent design, allowing combustion byproducts to enter occupied space; it is a serious safety hazard requiring immediate action.
- Spillage
- Related: Backdrafting, Carbon monoxide
Combustion gases escaping from an appliance draft hood or flue connector into the room instead of venting outdoors, detected with a mirror, smoke, or electronic probe during safety inspection.
- Carbon monoxide
- Related: Spillage, Combustion appliance zone
A colorless, odorless gas produced by incomplete combustion that binds hemoglobin and can be fatal; assessment work includes testing, source identification, and installing alarms per standards.
- Manual J load calculation
- Related: Sensible heat ratio, Manual D duct design
An industry method for sizing heating and cooling equipment from room-by-room envelope and internal load estimates, forming the basis for correct equipment selection and distribution design.
- Manual D duct design
- Related: Manual J load calculation, Static pressure
An industry procedure for sizing ducts and selecting fittings based on airflow and available static pressure, ensuring each room receives its calculated airflow.
- Static pressure
- Related: Manual D duct design, Airflow
The resistance to airflow measured in a duct system or across equipment, expressed in inches of water column; excessive values indicate undersized ducts, restrictive filters, or coil problems.
- Airflow
- Related: Static pressure, Manual D duct design
The volume of air moved per unit time, usually cubic feet per minute; verifying it at equipment and registers confirms whether delivered capacity matches design intent.
- Cooling load
- Related: Manual J load calculation, Solar heat gain coefficient
The rate of heat that must be removed to maintain design indoor conditions, combining envelope gains, internal gains, and solar and latent contributions.
- Latent load
- Related: Sensible heat ratio, Cooling load
The portion of a load associated with removing moisture from air through dehumidification; it is driven by infiltration, occupancy, and vapor sources rather than temperature alone.
- Building air leakage model
- Related: Blower door test, Calibration
A mathematical representation of envelope leakage used in energy simulation, often derived from blower door data and combined with weather and pressure assumptions to estimate annual infiltration.
- Calibration
- Related: Building air leakage model, Baseline
Adjustment of model inputs so predicted energy use reasonably matches utility bills or monitored data, improving confidence in savings estimates for proposed measures.
- Baseline
- Related: Calibration, Measurement and verification
The documented pre-retrofit condition or reference case against which savings from proposed measures are measured; it must be defined consistently with the post-work conditions.
- Measurement and verification
- Related: Baseline, Calibration
A structured process for quantifying actual energy savings after an upgrade by comparing measured post-installation use with an adjusted baseline, reducing reliance on predictions.
- Work scope
- Related: Baseline, Change order
A written description of the specific measures, materials, quantities, and responsibilities agreed for a project; it defines boundaries so contractors and customers share the same expectations.
- Change order
- Related: Work scope, Baseline
A documented, mutually approved modification to the original work scope that records added or removed measures, cost adjustments, and schedule effects before the work proceeds.
- Health and safety inspection
- Related: Carbon monoxide, Backdrafting
A structured pre-work check of combustion appliances, venting, carbon monoxide, moisture, electrical hazards, and air quality conditions that must be resolved or addressed before weatherization proceeds.