CSI CCCA · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Quality Assurance
Planned and systematic activities that provide confidence the project will meet quality requirements; process-focused and typically performed by the owner or designer rather than the constructor.
Quality Control
Operational techniques and activities used to verify that work meets the specified requirements, including inspection, sampling, testing, and documentation of results by the performing party.
Three-Phase Control System
Preparatory, initial, and follow-up phases of field quality control; each phase includes a meeting, checklist, and documented sign-off before and during work in place.
Nonconformance Report
A record of work that fails to meet a requirement, stating location, specification reference, disposition such as rework, repair, use-as-is, or reject, and verification of closure.
Cost of Quality
Total quality cost equals prevention plus appraisal plus internal failure plus external failure; prevention and appraisal are conformance costs, failures are nonconformance costs.
Five Whys
A root cause technique that repeatedly asks why a problem occurred until the underlying process failure is identified, generally within five iterations.
Sealed Bidding
A competitive procurement method using firm fixed price, adequate competition, and public bid opening, with award to the lowest responsive and responsible bidder without negotiation.
Responsive Bid
A bid that conforms in all material respects to the invitation, including the bid form, required bid security, and acknowledgment of every issued addendum.
Responsible Bidder
A bidder demonstrating the capacity, financial resources, integrity, and past performance needed to perform the contract if awarded.
Competitive Range
The group of offerors whose proposals are considered most advantageous and therefore eligible for discussions and best-and-final offers in negotiated procurement.
Bid Shopping
An unethical practice in which a contractor discloses a competitor's price to obtain a lower price from another subcontractor, undermining the competitive bidding process.
Addendum
A written modification issued to all plan holders before bid opening that clarifies or changes the bidding documents; bidders must acknowledge it on the bid form.
Two-Envelope Bidding
A procurement method in which technical qualifications and price are submitted separately, with technical envelopes scored before any price envelope is opened.
Hold Point
A defined stage in the contractor's quality plan where work cannot proceed until the inspector has been notified and has documented acceptance.
Witness Point
A notification point in an inspection and test plan where the inspector may attend, but work may proceed without waiting if the inspector does not appear.
Punch List
A documented list of incomplete or deficient items identified near substantial completion that the contractor must correct before final completion and final payment.
Substantial Completion
The stage when the work is sufficiently complete for its intended use, triggering warranty start, retainage reduction, and liquidated damages cutoff.
Operating Characteristic Curve
A graph showing the probability of accepting a lot for various defect rates, used to evaluate the risk of a given sampling inspection plan.
First Article Inspection
A full verification of the first unit or first work in place to confirm that methods, materials, and workmanship meet the specification before full production.
Shop Drawing
A contractor-prepared drawing showing fabrication and installation details, submitted for review of conformance with the design concept and contract requirements.
Submittal Review Action
The reviewer's stamp indicating approved, approved as noted, revise and resubmit, or rejected, based on conformance with the design concept only.
Cash Allowance
A stated amount included in the contract sum for a specific item, adjusted by change order to reflect the actual cost plus the specified markup.
Substitution Request
A contractor's written proposal to use a product other than the specified one, submitted within the stated period with data demonstrating equivalent performance.
Record Documents
As-built drawings and specifications updated during construction to show actual installed conditions, submitted as a closeout requirement before final payment.
Baseline Schedule
The approved initial construction schedule showing activities, durations, logic, and milestones, against which progress and time extensions are measured.
Order of Precedence
The contract clause establishing which documents govern when conflicts exist, typically agreement, conditions, drawings, specifications, and addenda in stated order.
Differing Site Conditions
Subsurface or latent physical conditions materially different from those indicated, or unknown unusual conditions, entitling the contractor to notice and equitable adjustment.
Construction Change Directive
A written owner instruction directing a change before price and time are agreed, later converted into a change order with an adjusted contract sum or time.
Liquidated Damages
A pre-agreed sum per day charged to the contractor for late completion, enforceable only if it reasonably forecasts actual damages rather than serving as a penalty.
Retainage
A percentage withheld from each progress payment to secure performance, commonly five to ten percent, often reduced at substantial completion.
Guaranteed Maximum Price
A cost-plus contract feature capping the owner's price, with savings below the cap shared per a stated ratio and overruns borne by the contractor.
Performance Bond
A surety instrument, typically equal to one hundred percent of the contract sum, guaranteeing completion of the work if the contractor defaults.