EPA RRP flashcards
EPA RRP · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Pre-1978 target housing
- Housing constructed before January 1, 1978, excluding housing for the elderly or disabled unless a child under 6 resides there, and zero-bedroom dwellings where no child under 6 resides.
- Child-occupied facility
- A pre-1978 building or portion visited regularly by the same child under age 6 at least two days per week, three hours per visit, and 60 hours per year, such as a daycare or preschool.
- De minimis amount
- Less than 2 square feet of interior surface, less than 20 square feet of exterior surface, or 10% or less of a small component type's total surface area per room or exterior component.
- Regulated lead-based paint
- Paint or surface coating containing lead at 1.0 mg/cm2 or 0.5% by weight; disturbing more than the de minimis amount triggers the RRP Rule.
- Emergency renovation
- Work resulting from a sudden, unexpected event that, if not immediately attended to, presents a safety or public health hazard or threatens equipment; still requires a certified firm and lead-safe practices.
- Lead-based paint free exemption
- A property certified as lead-based paint free by a certified inspector or risk assessor is exempt from the RRP Rule for that property.
- Firm certification
- Firms performing regulated renovations must be EPA-certified or certified by an authorized state or Tribal program and must use certified renovators trained by EPA-accredited providers.
- Certified renovator training
- A certified renovator must complete an EPA-accredited initial course, typically 8 hours, and refresher training every 5 years to maintain certification.
- Non-certified worker supervision
- Non-certified workers may perform renovation tasks only when directed and supervised by a certified renovator who is responsible for on-site compliance and provides documented on-the-job training.
- Three-year record retention
- Firms must retain records for 3 years, including renovator certification, worker training documentation, occupant pamphlet delivery, and lead test kit results or clearance documentation.
- Renovate Right pamphlet
- The EPA pamphlet 'The Lead-Safe Certified Guide to Renovate Right' must be provided to owners and occupants before work begins, with acknowledgment or documented refusal.
- Containment requirements
- Isolate the work area with minimum 6-mil plastic sheeting, seal openings, doors, and HVAC registers, post warning signs, and restrict occupant access until cleaning verification or clearance.
- Prohibited work practices
- Open-flame burning, heat guns above 1,100°F, high-temperature power sanding, dry scraping except in limited cases, and power tools without HEPA exhaust are prohibited.
- Wet methods and HEPA tools
- Sanding, scraping, and demolition require wet methods and HEPA-equipped tools to control dust; mist surfaces before disturbing paint.
- Cleaning verification
- After final cleaning with HEPA vacuuming, wet wiping, and wet mopping, the certified renovator performs cleaning verification or clearance as required by the applicable program.
- Occupant reoccupancy
- Occupants must be kept out of the work area until cleaning verification or clearance is complete, and the certified renovator documents completion.
- Lead test kit use
- An EPA-recognized lead test kit may be used by a certified renovator per manufacturer instructions to determine whether a surface is coated with regulated lead-based paint.
- Positive test result
- A positive test kit result means the component must be treated as regulated lead-based paint, and the work must follow lead-safe work practices.
- Unreliable substrates
- Test kits are not reliable on some plastics, metals, or surfaces with multiple layers; in those cases, assume regulated paint is present or use a certified inspector.
- Test kit documentation
- The certified renovator must document test kit results, including component, location, result, and date, and retain the records for 3 years.
- Negative test limitation
- A negative test kit result does not equal a clearance or lead-free certification; only an inspection report by a certified professional can establish absence of lead-based paint for exemption.
- Landlord disclosure duty
- Landlords and property managers must disclose known lead-based paint hazards to tenants and provide the EPA pamphlet before renovation.
- Childcare operator duty
- Childcare facility operators must ensure pre-1978 child-occupied facilities are renovated by certified firms and provide the required pamphlet to parents or guardians.
- Real estate agent duty
- Real estate agents must disclose known lead-based paint and hazards, provide the EPA pamphlet, and include the lead warning statement in sales and lease contracts for pre-1978 housing.
- Property manager coordination
- Property managers must ensure hired renovation firms are EPA-certified, coordinate occupant notification and access, and maintain required records.
- Renovation versus abatement
- RRP disturbs paint and creates dust without permanently eliminating hazards, while abatement permanently eliminates lead-based paint or hazards and requires certified abatement workers and firms.
- Lead-based paint inspection
- An inspection determines the presence and location of lead-based paint on components using XRF or lab analysis and does not assess hazards.
- Risk assessment
- A risk assessment identifies lead-based paint hazards such as deteriorated paint, dust, and soil, and provides options for controlling them; it is performed by a certified risk assessor.
- Clearance examination
- A clearance examination is performed after abatement or renovation to confirm lead dust levels are below applicable standards; the federal RRP Rule uses cleaning verification instead.
- Authorized state program
- EPA may authorize a state or Tribal program to administer and enforce the RRP Rule; the program must be at least as protective as the federal rule.
- Tribal program coverage
- Tribal programs may be authorized for specific Tribes; work on Tribal lands may be subject to the Tribal program rather than the state program.
- Multi-jurisdiction compliance
- Firms working in multiple jurisdictions must verify whether each state or Tribe is authorized and comply with the applicable program's certification and work practice rules.