PASMA Towers for Users study materials
PASMA Towers for Users study resources

PASMA Towers for Users cheat sheet

PASMA Towers for Users · Keep the key ideas within reach.

Quick reference

Product Standards and Tower Standards

  • EN 1004 is the European product standard for mobile access and working towers; it classifies towers by duty (Class 1, 2, 3) and by maximum platform height above the base.

  • EN 1004 Class 3 towers are rated for light duty only; they are not designed for heavy trades, stored materials, or high imposed loads.

  • A tower to EN 1004 is limited to a maximum platform height of 8 m outdoors and 12 m indoors; beyond that, the tower is outside the standard's scope.

  • BS 1139-6 is the British standard for mobile towers not covered by EN 1004; it permits taller configurations when designed and checked accordingly.

  • EN 1004 requires a platform duty load declaration; typical Class 3 working load is around 150 kg per platform, spread over the platform area.

  • Tower components must be used only with the system they were designed for; mixing parts from different manufacturers voids conformity and stability assumptions.

  • A tower must carry a manufacturer's instruction manual, and assembly must follow it exactly; deviations are outside the standard.

  • Tower standards require guardrails on all working platforms and at intermediate levels where a person could fall; toe boards are required where objects could fall.

Quick reference

Buying and Hiring Safe Towers

  • When hiring, specify EN 1004 compliance, the duty class, the required platform height, and whether use is indoor or outdoor.

  • A tower supplied without the manufacturer's instruction manual is not compliant; do not accept it.

  • Inspect on delivery: check for bent braces, cracked welds, damaged threads, missing locking pins, and deformed platform hooks.

  • Confirm the hire period, transport, and who is responsible for assembly, inspection, and dismantling.

  • Check that stabilisers and ballast (if required by the manual) are included in the hire package, not optional extras.

  • Verify the tower's rated platform height against the task; do not hire a tower that must be extended beyond its manual's limit.

  • Castors must be the correct type for the surface and must have working brakes; swivel castors with locking devices are typical.

  • Record the hire company's inspection regime and insist on pre-hire inspection evidence for second-hand or long-term hired towers.

Quick reference

Safe Use of a Scaffold Tower

  • Never move a mobile tower with people or materials on the platform; clear the platform, then push at the base only.

  • Do not use a tower outdoors in wind conditions above the manufacturer's stated limit; typical limits are around 12.5 m/s or as stated in the manual.

  • Never climb the outside of a tower; access must be by internal ladder or integral stairway.

  • Do not use ladders, steps, or boxes on a platform to gain extra height.

  • Keep the tower on firm, level ground; use spreader plates or sole boards on soft or uneven surfaces.

  • Do not attach sheets, netting, or signage to a tower; these increase wind loading and can destabilise it.

  • Never exceed the platform duty load; distribute loads evenly and never concentrate heavy items at one edge.

  • Barricade or guard the tower base where vehicles or pedestrians could strike it, and never use a tower as a support for other equipment.

Quick reference

Guardrails, Toe Boards and Platforms

  • Guardrail heights: top rail 950 mm to 1150 mm, intermediate rail at approximately 470 mm to 500 mm, with toe boards at least 150 mm high.

  • Guardrails must be fitted on all four sides of every working platform, including the side against a wall unless the gap is small enough to prevent a fall.

  • Toe boards must be fitted where there is a risk of objects falling from the platform, and must be secured to prevent displacement.

  • Platforms must be fully decked with no gaps through which a person or tools could fall; hatches must be closed when not in use.

  • Platform units must be secured with locking devices; check that hooks and catches are engaged before loading.

  • Guardrails must not be used as anchor points for harnesses or as supports for lifting equipment.

  • Intermediate guardrails and toe boards are required at any level where a person could fall from or through the platform.

  • Platforms should be kept clear of loose tools and materials; use tool lanyards or a closed container where falling objects are a risk.

Quick reference

Inspections and Assembly (3T and AGR)

  • The 3T method is Teach, Test, and Tell: a trained and competent person assembles, inspects, and instructs others in the tower's use.

  • AGR stands for Advanced Guardrail: a system where the guardrail is fitted from the platform below before the user steps onto the new level.

  • Pre-use checks: castors locked, base plates on firm ground, braces in place, locking pins engaged, guardrails and toe boards complete.

  • Formal inspections of a tower in use are required at intervals not exceeding 7 days, and after any alteration, damage, or adverse weather.

  • A tower must be inspected by a competent person before first use and after any event that could affect its stability.

  • Assembly order: base and castors, first frame, braces, stabilisers, platform at low level, then progressively add frames and guardrails.

  • Never assemble a tower alone if the manual requires two people; many systems require two persons for safe erection at height.

  • Record inspection findings; tag out or dismantle any tower found defective, and do not return it to use until repaired.

Quick reference

Product Standards and Tower Standards

  • EN 1004 towers are marked with the standard, duty class, and maximum platform height; check the label before use.

  • Tower duty classes limit the number of persons and the load per platform; never assume a tower is rated for heavy trades.

  • Outdoor use of an EN 1004 tower is limited to 8 m platform height; indoor use is limited to 12 m.

  • A tower that exceeds the standard's height limits must be designed by a competent engineer, not simply extended.

  • Stabilisers are required above a manufacturer-specified height (often around 2 m platform height) and must be fitted as the manual states.

  • Ballast requirements are set by the manufacturer based on wind loading and tower height; never omit ballast to save time.

  • Tower standards require that all components be identifiable and traceable to the manufacturer's system.

  • Non-standard or home-made components must never be used to extend or repair a tower.

Quick reference

Buying and Hiring Safe Towers

  • Ask for the manufacturer's manual and the declaration of conformity with the hire.

  • Confirm the tower's duty class matches the task; Class 3 is light duty only.

  • Check that all components are present against the manual's parts list before signing for the hire.

  • Confirm who is responsible for pre-use inspection and for statutory inspections during the hire.

  • Ensure stabilisers, ballast, and toe boards are included in the hire, not charged as extras.

  • Reject towers with missing locking pins, bent frames, or damaged castors; do not accept 'it will be fine'.

  • For long-term hires, agree an inspection schedule and record-keeping responsibility with the hirer.

  • Check the tower's rated height against the intended work; do not hire a tower that needs extending beyond its limit.

Quick reference

Safe Use of a Scaffold Tower

  • Move a tower only by pushing at the base, with no persons or materials on the platform.

  • Do not use a tower in wind above the manufacturer's limit; check the forecast and secure or dismantle the tower if wind rises.

  • Access the platform only via the internal ladder or stairway; never climb the frame.

  • Do not stand on guardrails, toe boards, or any makeshift platform to reach higher.

  • Keep the base clear of debris and ensure castors are locked before climbing.

  • Never attach sheets, banners, or netting; wind loading can overturn the tower.

  • Keep the platform tidy and do not exceed the duty load; distribute loads evenly.

  • Do not use a tower near overhead power lines or as a support for other equipment.

Quick reference

Guardrails, Toe Boards and Platforms

  • Top guardrail: 950 mm to 1150 mm above the platform.

  • Intermediate guardrail: approximately 470 mm to 500 mm above the platform.

  • Toe board height: at least 150 mm, secured to prevent displacement.

  • Guardrails on all four sides of every platform, including the wall side where a fall gap exists.

  • Platforms fully decked with no gaps; hatches closed when not in use.

  • Platform units secured with locking devices before loading.

  • Guardrails never used as anchor points or lifting supports.

  • Keep platforms clear of loose tools; use lanyards or closed containers.

Quick reference

Inspections and Assembly (3T and AGR)

  • 3T: Teach, Test, Tell - the competent person trains, checks, and instructs users.

  • AGR: Advanced Guardrail - guardrail fitted from the level below before stepping onto the new platform.

  • Pre-use check: castors locked, ground firm, braces fitted, pins engaged, guardrails and toe boards complete.

  • Formal inspection at intervals not exceeding 7 days while in use.

  • Inspect after alteration, damage, or adverse weather.

  • Assembly order: base, castors, first frame, braces, stabilisers, low platform, then add frames and guardrails.

  • Two persons required where the manual specifies; never assemble alone if so.

  • Tag out or dismantle defective towers; do not return to use until repaired.