PASMA Towers for Users study materials
PASMA Towers for Users study resources

PASMA Towers for Users flashcards

PASMA Towers for Users · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

EN 1004
European product standard for mobile access and working towers, classifying towers by duty class and maximum platform height, and requiring a manufacturer's manual.
EN 1004 height limits
Maximum platform height of 8 m outdoors and 12 m indoors for towers to EN 1004; beyond these limits the tower is outside the standard's scope.
BS 1139-6
British standard for mobile towers not covered by EN 1004, permitting taller configurations when designed and checked accordingly.
Duty class
EN 1004 classification of a tower's rated load and use, such as light duty Class 3, which limits the number of persons and imposed load per platform.
Stabilisers
Outrigger components fitted to a mobile tower above a manufacturer-specified height to increase stability against overturning, and required as the manual states.
Ballast
Additional weight specified by the manufacturer to resist wind loading on a tower; it must never be omitted or reduced to save time.
Declaration of conformity
Document confirming a tower meets the relevant standard; it should be supplied with the tower and kept with the manual.
Hire specification
The written requirements given to a hire company: standard, duty class, platform height, indoor or outdoor use, and included components.
Pre-hire inspection
Checking a hired tower on delivery for bent braces, cracked welds, damaged threads, missing pins, and deformed platform hooks before accepting it.
Hire package contents
The components that must be included in the hire: frames, braces, platforms, guardrails, toe boards, castors, stabilisers, ballast, and the manual.
Castor brakes
Locking devices on tower castors that must be engaged before climbing; castors must suit the surface and have working brakes.
Parts list check
Comparing delivered components against the manufacturer's parts list to confirm nothing is missing before signing for the hire.
Rejecting damaged towers
Refusing towers with missing locking pins, bent frames, or damaged castors; damaged components must never be accepted for use.
Moving a tower
Only by pushing at the base, with no persons or materials on the platform, and only on firm level ground within the manual's limits.
Wind limit
The maximum wind speed stated in the manufacturer's manual, typically around 12.5 m/s, above which a tower must not be used outdoors.
Internal access
Climbing a tower only by its internal ladder or integral stairway; climbing the outside frames is prohibited.
Prohibited additions
Sheets, netting, banners, or signage attached to a tower, which increase wind loading and can overturn it.
Ground conditions
Firm, level ground for tower bases; spreader plates or sole boards are used on soft or uneven surfaces to spread the load.
Duty load
The maximum load a platform is rated to carry; loads must be evenly distributed and never concentrated at one edge.
Top guardrail height
The upper guardrail must be fitted between 950 mm and 1150 mm above the platform surface on all sides.
Intermediate guardrail
The mid-rail fitted at approximately 470 mm to 500 mm above the platform, between the top rail and the platform surface.
Toe board height
Toe boards must be at least 150 mm high and secured against displacement where objects could fall from the platform.
Four-sided guardrails
Guardrails are required on all four sides of every working platform, including the wall side where a fall gap exists.
Platform decking
Platforms must be fully decked with no gaps through which a person or tools could fall, and hatches closed when not in use.
Platform locking devices
Hooks and catches that secure platform units to the frame; they must be engaged before the platform is loaded.
Guardrail misuse
Using guardrails as anchor points for harnesses or as supports for lifting equipment is prohibited; they are for fall prevention only.
3T method
Teach, Test, Tell: a trained and competent person assembles, inspects, and instructs others in the safe use of the tower.
AGR
Advanced Guardrail: a system where the guardrail is fitted from the platform below before the user steps onto the new level.
Pre-use check
Checking castors locked, ground firm, braces fitted, pins engaged, and guardrails and toe boards complete before first use each time.
Seven-day inspection
Formal inspection of a tower in use at intervals not exceeding 7 days, and after alteration, damage, or adverse weather.
Assembly sequence
Base and castors, first frame, braces, stabilisers, low platform, then progressively add frames and guardrails following the manual.
Defective tower handling
Tag out or dismantle any tower found defective during inspection; it must not return to use until repaired.