Empirical process control
A process model in which decisions are based on observation of actual results rather than on predefined plans. Scrum implements it through transparency, inspection, and adaptation.
Three pillars of Scrum
Transparency, inspection, and adaptation. Transparency makes work visible, inspection checks the artifacts and progress, and adaptation adjusts process or product when results deviate.
Agile Manifesto values
Four preference statements: individuals and interactions, working software, customer collaboration, and responding to change, each preferred over its counterpart while the counterpart retains value.
Scrum values
Commitment, focus, openness, respect, and courage. They describe expected behavior that supports the three empirical pillars and trust within the Scrum Team.
Definition of Done
A formal description of the state of the Increment when it meets the quality measures required for the product. It is the commitment attached to the Increment artifact.
Product Goal
A long-term objective for the Scrum Team that describes a future state of the product. It lives in the Product Backlog and is the commitment for that artifact.
Sprint Goal
A single objective for the Sprint that gives the Developers focus and flexibility on scope. It is the commitment attached to the Sprint Backlog.
Product Owner accountability
Maximizing product value by ordering the Product Backlog, making it transparent and understood, and deciding what to build next. One person, not a committee.
Scrum Master accountability
Establishing Scrum as described and helping the Scrum Team and organization improve its effectiveness. The role has influence, not line authority over team members.
Scrum Team size
Typically ten or fewer people, comprising one Product Owner, one Scrum Master, and Developers. Larger groups should form multiple cohesive Scrum Teams on the same product.
Sprint timebox
A fixed length of one month or less. A new Sprint starts immediately after the previous one ends, and scope may be clarified but not changed arbitrarily.
Sprint Planning timebox
A maximum of eight hours for a one-month Sprint, shorter for shorter Sprints. It addresses why the Sprint is valuable, what can be done, and how.
Daily Scrum timebox
A 15-minute event for the Developers, held at the same time and place each working day, to inspect progress toward the Sprint Goal and adapt the Sprint Backlog.
Sprint Review timebox
A maximum of four hours for a one-month Sprint. The Scrum Team and stakeholders inspect the Increment and collaborate on what to do next.
Sprint Retrospective timebox
A maximum of three hours for a one-month Sprint. The team inspects individuals, interactions, processes, tools, and the Definition of Done to plan improvements.
Sprint cancellation
Only the Product Owner may cancel a Sprint, and only when the Sprint Goal becomes obsolete. Completed items are reviewed and the backlog is re-planned.
Product Backlog
An emergent, ordered list of what is needed to improve the product. It is the single source of work for the Scrum Team and is continuously refined.
Sprint Backlog
A plan by and for the Developers, composed of the Sprint Goal, the selected Product Backlog items, and the plan to deliver the Increment. Updated daily.
Increment
A concrete stepping stone toward the Product Goal. Each Increment is additive to prior ones, verified against the Definition of Done, and usable.
Story points
A relative unit of estimate reflecting effort, complexity, and uncertainty together. Values are team-specific and should not be compared across teams.
Planning Poker
A consensus estimation technique in which estimators reveal cards simultaneously, discuss the highest and lowest estimates, and re-vote until the team converges.
Velocity
The sum of story points of backlog items that met the Definition of Done in a Sprint. Use a multi-Sprint average to forecast future capacity.
Velocity forecast formula
Expected Sprints ≈ remaining backlog size ÷ average velocity. The result is a probabilistic forecast that must be revisited as the backlog and team change.
INVEST criteria
A quality heuristic for user stories: Independent, Negotiable, Valuable, Estimable, Small, and Testable. Items failing it are split or clarified before selection.
User story format
As a role, I want a goal so that a benefit. It captures the need and its value, leaving detailed conversation and confirmation to the team.
Three-point estimation
A weighted estimate using optimistic, most likely, and pessimistic values: expected = (O + 4M + P) ÷ 6. It makes uncertainty explicit in numeric planning.
Spike
A timeboxed investigation to gain knowledge or reduce uncertainty before estimating or building. Its output is learning, not shippable product functionality.
Burndown versus burnup
A burndown shows remaining work trending to zero within a Sprint. A burnup shows completed work against total scope, making scope changes visible.
Backlog refinement
Ongoing decomposition and sizing of Product Backlog items to prepare them for future Sprints. It is not one of the five formal Scrum events.
Stakeholder engagement point
The Sprint Review is the formal recurring touchpoint where stakeholders inspect the Increment and provide feedback that shapes the Product Backlog.
Self-managing team
A team that internally decides who does what, when, and how. The Scrum Master coaches the team but does not assign tasks or dictate technical solutions.
Impediment escalation
Impediments within team authority are solved by the team; those caused by organizational policy or tooling are raised by the Scrum Master to management.
Scaling constraint
Multiple Scrum Teams on one product need one Product Owner, one Product Backlog, a shared Definition of Done, and explicit dependency management to integrate continuously.